| WARNING:FOLLOW NATIONAL REGULATIONS |
| AND CODES OF PRACTICE FOR MINIMUM CLEAR- |
| ANCES FROM GAS TERMINALS, AND PLACE- |
| MENT OF GAS TERMINAL. |
NOTE | This also pertains to vertical flue systems installed on |
| the outside of the building. |
TERMINATION
CAP
51 cm
VERTICAL
WALL
LOWEST
DISCHARGE
OPENING
X
30,5 cm
ROOF PITCH
IS X/ 30,5 cm
H (MIN.) - MINIMUM HEIGHT FROM ROOF TO LOWEST DISCHARGE OPENING
Angle | H (Min.) M |
| ............................................... 0.30* |
............................................... 0.38* | |
............................................... 0.46* | |
............................................... 0.61* | |
............................................... 0.76 | |
............................................... 0.99 | |
............................................... 1.22 | |
............................................... 1.52 | |
............................................... 1.83 | |
............................................... 2.13 | |
............................................... 2.29 | |
............................................... 2.44 |
*.91 M minimum in snow regions
Figure 24. Minimum Height from Roof to Lowest Discharge Opening
Heat & Glo • | 27 |