Heat & Glo LifeStyle 6000TRS-CE manual Step Gas Supply Line

Page 30

Step 6

The Gas

Supply Line

Note: Have the gas supply line installed by a qualified service technician in accordance with all building regulations.

Note: Before the first firing of the fireplace, the gas supply line should be purged of any trapped air.

NOTE: Consult local building regulations to properly size the gas supply line leading to the (Rp 1/2”) hook-up at the unit.

This gas inlet connection is ISO 7-Rp 1/2 (BSP Rp 1/2).

To install the gas supply line:

When attaching the pipe, support the control so that the lines are not bent or torn.

After the gas line installation is complete, use a soap solution to carefully check all gas connections for leaks.

The gas line should be installed by a qualified service technician.

!WARNING: DO NOT USE AN OPEN FLAME TO CHECK FOR GAS LEAKS.

At the gas line access hole, use insulation to repack the space around the gas pipe.

Insert insulation from the outside of the fireplace and pack the insulation tightly to totally seal between the pipe and the outer casing.

GAS LINE

ACCESS

Figure 28

30

Heat & Glo • 6000TRS-CE2049-900 Rev. Q • 2/11

Image 30
Contents Model What to do if you smell gasSafety and Warning Information Installing the Fireplace Maintaining and ServicingLog Set Assembly Service PartsService Parts List 6000TRS-CEValve Assembly 6000TRS-CEInstallation Regulations Appliance CertificationANY Such Action MAY Possibly Cause a Fire Hazard Location Centimeters Fireplace StepLocating Clearance RequirementsStep Framing Fireplace Framing should be constructed of 2 X 4 lumber or heavierStep Installing Flue System Flue System ApprovalsIdentifying Flue Components DVP4 DVP6 DVP12 Straight UP Flue with ONE 1 90o Elbow Flue with TWO 2 90 Elbows Flue with TWO 2 90 Elbows Flue with Three 3 90 Elbows + H Installing Flue Components Venting Out the Rear FlueVenting Out the Top Flue Install Support Brackets On the TOP of the heaterInstall Firestops Installing Support BracketsFlue Pipe & Firestop For Horizontal Terminations using the DVP-TRAP Flue TerminationBe Positioned SO That the Arrow is Pointing UP DVP Termination Cap Outside of the building Alcove Applications Step Positioning Leveling, Securing Fireplace Standing Pilot Ignition SystemStep Gas Supply Line Optional Accessories Step Gas Pressure RequirementsFinishing Installing the Trim Installing the Ceramic ReFractory LOG Placement Heat & Glo 6000TRS-CE 2049-900 Rev. Q 2/11 Glass Assembly Placing the Ember MaterialStep Before Lighting Fireplace Review safety warnings and cautionsDouble-check for faulty components Double-check for gas leaksStep Lighting Fireplace After the Installation Maintaining Servicing Your Fireplace Make Sure the Flames Standing Pilot Troubleshooting With the pilot lit, and the ON/OFF switch Placed in this Opening Limited Lifetime Warranty Limited Lifetime WarrantyWarranty Conditions