VERTICAL SIDEWALL APPLICATIONS

The maximum number of 90 degree elbows per side wall installation is four (4), (includes 7DVRT90 off back of unit)

The maximum number of 45 degree elbows permitted per side wall installation is two (2). These elbows can be installed in either the vertical or horizontal run.

When one 90o elbow is installed directly onto another off the back of the fireplace the maximum horizontal vent length is 36" (914mm). Fig. 18.

MAXIMUM 3' (914mm)

7DVRT90

Fig. 18

SIDE VIEW

For each 45 degree elbow installed in the horizontal run (while maintaining a constant horizontal plane), the length of the horizontal run MUST be reduced by 18" (457mm). This does not apply if the 45 degree elbows are installed on the vertical part of the vent system.

If a 90 degree elbow is used in the horizontal vent run (level height maintained) the maxi- mum horizontal vent length is reduced by 36 inches. Fig.19. This does not apply if the 90 degree elbows are used to increase or redi- rect a vertical rise.

Example: According to the vent chart the maximum horizontal vent length is 20 ft.when the vertical height is 7.5 ft. from fireplace base height. If one 90 degree elbow is required in the horizontal vent it must be reduced to 17 ft.

84"

2134mm

120"

3048mm

90o elbow=3'

90"

2286mm

Fig. 19

The maximum number of elbow degrees in a system is 270 o. (This does not include transition elbow from rear vent to vertical vent.) Fig. 20.

Sample:

1

 

 

-

 

90 o

 

2

 

 

-

 

45 o

 

3

 

 

-

 

45 o

 

4

 

 

-

 

90 o

 

 

 

 

 

 

 

 

 

Total

-

 

270 o

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Fig. 20

- 12 -

Image 12 Contents
BHDR36 Table of Contents Installation Instructions Locating Your GAS FireplaceFireplace Dimensions Mantel Chart MantelsClearance to Combustibles Framing and FinishingGAS Specifications Final FinishingHearth GAS Line Installation Remote Switch Installation For RN/RPGeneral Venting Information Termination Clearances Rear Wall Installations Rear Venting ApplicationsVertical Sidewall Installations Vertical Sidewall Applications HOW to USE the Vent Graph Vent Sidewall InstallationSidewall Venting Graph Ensure Pipes Are Below Grade Installations Vertical Through Roof ApplicationsVertical Thru Roof Installation Proceed to plumb for additional openings throughCrimped END Venting Components General Information on Assembling Twist Lock Vent Pipes Rear Venting Applications190mm Vertical Sidewall Installations Vertical Sidewall ApplicationsSee page 23 for Venting Requirements for Snorkels NON-COMBUSTIBLE Walls Hole opening must be Below Grade Installations InstallationVertical Through Roof Applications RiseVertical Through the Roof Installation Twist Lock Venting Components Glass Cleaning General Glass InformationLouvre Removal Glass Frame RemovalInstallation of Logs Flame AdjustmentLava Rock Flame Characteristics MaintenanceCleaning the Standing Pilot Control System Inspecting the Venting SystemLighting and Operating Instructions Trouble Shooting the GAS Control System SIT 820 Nova Millivolt Valve Replacement Parts List Replacement Parts Wiring Instructions Optional BAY Window InstallationOptional FAN KIT FK24 Optional Screen KIT Installation Optional Ceramic Refractory InstallationOptional Remote Control