STEP 2
Fig. 25. Measure wall thickness and cut adjustable zero clearance sleeve parts to proper length (MAXIMUM 12"). Adjust sleeve to minimum (9-3/8" x 9-3/8") and attach to firestop with #8 sheet metal screws (supplied). Install firestop assembly.
Zero clearance sleeve is only required for combustible walls.
Maximum Length | #8 | |
SCREWS(2) | ||
12" (294mm) | ADJUSTABLE | |
#8 | ||
ZERO CLEARANCE | ||
SCREWS(2) | ||
SLEEVE | ||
| ||
#8 |
| |
SCREWS(2) |
|
STEP 5
(Fig. 28) Use the appropriate length of pipe section – telescopic or fixed
–and install. The 20" section of pipe which goes through the wall is packaged with the 7DVSK kit, and can be cut to suit if necessary.
Sealing vent pipe and firestop gaps with high temperature sealant will restrict cold air being drawn in around fireplace.
Fig. 28 | X |
|
Fig. 25 | ADJUSTABLE ZERO |
CLEARANCE SLEEVE |
FIRESTOPFIRESTOP
STEP 3
(Fig.26) Apply a bead of high temperature sealant to the inner and outer flue collars of the fireplace and using appropriate venting component(s) attach to fireplace with three (3) screws. Follow with the installation of the inner and outer elbow. Again secure joints with three (3) sheet metal screws. Wipe off any excess high temperature sealant.
ENSURE PIPES |
|
ARE |
|
X |
|
7DVRT90 | Fig. 26 |
BEAD OF |
|
SEALANT |
|
STEP 4
(Fig. 27) Measure the horizontal length requirement including a 2" overlap, i.e. from the elbow to the outside wall finish plus 2" (or the distance required if installing a second 90º elbow).
| X |
Always |
|
install |
|
horizontal |
|
venting |
|
on a | Fig. 27 |
level |
|
plane. |
|
STEP 6
(Fig. 29) Apply high temperature sealant to 4" and 7" collars one inch away from crimped end. Guide the vent terminations 4" and 7" collars into their respective vent pipes. Double check that the vent pipes overlap the collars by 2". Secure the termination to the wall with screws provided and caulk around the wall plate to weatherproof.
X | Fig. 29 | X |
STEP 7
Support the horizontal pipes every three (3) feet (92 cm) with metal pipe straps. Make sure that the horizontal vent pipe is installed on a level horizontal plane.
STEP 8
Recheck the fireplace to make sure that it is levelled, properly positioned, and nailed or screwed to the floor.
If applied, the fireplaces adjustable frame drywall strips (nailing flanges) should be fastened. See "Framing & Finishing" section, page 6.
- 14 -