Vermont Casting BHDR36 installation instructions Vertical Sidewall Installations

Page 11

STEP 5

Guide the vent termination 4" collar into the 4" pipe then the 7" collar into the 7" pipe. Do not force the venting into position. If the pipes do not line up with the termination collars, disassemble elbows or pipes and reattach to the fireplace collar. (Fig. 16)

STEP 6

Recheck the fireplace to make sure that it is levelled, properly positioned, and nailed or screwed to the floor.

If applied, the fireplace adjustable frame drywall strips (nailing flanges) should be fastened. See Framing and Finishing.

FINISHED

VENT

WALL

TERMINATION

 

 

(7DVRVT)

 

Fig. 16

VERTICAL SIDEWALL INSTALLATIONS

Since it is very important that the venting system maintain its balance between the combustion air intake and the flue gas exhaust, certain limitations as to vent configurations apply and must be strictly adhered to.

The graph showing the relationship between vertical and horizontal side wall venting will help to determine the various vent lengths allowable. Fig. 21.

Minimum clearance between vent pipes and combustible materials is one (2") inch (25

mm)on top, bottom and sides unless otherwise noted.

When vent termination exits through foundation less than 20" below siding outcrop, the vent pipe must flush up with the siding. A 7DVSS must also be used.

It is always best to locate the fireplace in such a way that minimizes the number of offsets and horizontal vent length.

The horizontal vent run refers to the total length of vent pipe from the flue collar of the fireplace to the face of the outer wall.

Horizontal plane means no vertical rise exists on this portion of the vent assembly.

For some installations, it may be desirable to have some amount of the horizontal vent run immediately after the fireplace. A vertical rise must be used but can be located any- where in the vent system, to meet the perim- eters identified in the venting graph.

The maximum horizontal vent run is 20 feet (6100mm) when the vertical vent rise is 7.5 feet (2286mm). Fig. 17

 

MAXIMUM

 

 

20 ft. (6100mm)

 

 

48"

 

12"

(1220mm)

 

(305mm)

 

 

15 ft.

 

 

(4572mm)

 

96"' (2438mm)

 

 

VERTICAL

 

 

DIMENSION

7DVRT90

 

8 ft. MINIMUM

 

ELBOW

 

WHEN HORIZONTAL

 

 

 

RUN IS 20 ft.

 

 

 

SIDE VIEW

Fig. 17

 

 

- 11 -

Image 11 Contents
BHDR36 Table of Contents Locating Your GAS Fireplace Installation InstructionsFireplace Dimensions Framing and Finishing Mantel ChartMantels Clearance to CombustiblesHearth GAS SpecificationsFinal Finishing Remote Switch Installation For RN/RP GAS Line InstallationGeneral Venting Information Termination Clearances Rear Venting Applications Rear Wall InstallationsVertical Sidewall Installations Vertical Sidewall Applications Sidewall Venting Graph HOW to USE the Vent GraphVent Sidewall Installation Ensure Pipes Are Vertical Through Roof Applications Below Grade InstallationsProceed to plumb for additional openings through Vertical Thru Roof InstallationCrimped END Venting Components Rear Venting Applications General Information on Assembling Twist Lock Vent Pipes190mm Vertical Sidewall Applications Vertical Sidewall InstallationsSee page 23 for Venting Requirements for Snorkels NON-COMBUSTIBLE Walls Hole opening must be Installation Below Grade InstallationsRise Vertical Through Roof ApplicationsVertical Through the Roof Installation Twist Lock Venting Components Glass Frame Removal Glass CleaningGeneral Glass Information Louvre RemovalLava Rock Installation of LogsFlame Adjustment Inspecting the Venting System Flame CharacteristicsMaintenance Cleaning the Standing Pilot Control SystemLighting and Operating Instructions Trouble Shooting the GAS Control System SIT 820 Nova Millivolt Valve Replacement Parts List Replacement Parts Optional FAN KIT FK24 Wiring InstructionsOptional BAY Window Installation Optional Remote Control Optional Screen KIT InstallationOptional Ceramic Refractory Installation