Vermont Casting BHDR36 installation instructions Termination Clearances

Page 9

Termination Clearances

Termination clearances for buildings with combustible and noncombustible exteriors.

Inside Corner

Outside Corner

Recessed Location

 

 

 

B =

 

A =

 

Combustible

A

Combustible

 

6"(152mm)

 

 

 

6"(152mm)

V

Noncombustible

 

Noncombustible

2"(50mm)

 

 

V

2"(50mm)

B

 

Balcony -

 

Balcony -

 

with no side wall

 

with perpendicular side wall

 

G

H

 

 

 

 

 

V

 

V

 

 

Combustible &

J

G =

 

 

 

Non-Combustible

 

Combustible&

 

 

 

 

 

Non-Combustible

H = 24"(610mm)

 

12"(305mm)

 

J = 20"(508mm)

 

 

 

 

D

CC

E

V

C = Maximum depth of 48" (1219mm) for recessed location.

D = Minimum width for back wall of a recessed location. Combustible 38"(965mm) Noncombustible 24"(610mm)

E = Clearance from corner in recessed location. Combustible 6"(152mm) Noncombustible 2"(50mm)

Fig. 11

GENERAL INFORMATION ON ASSEMBLING

THE VENT PIPES WITH CRIMPED ENDS

Before joining elbows and pipes apply a bead of high temperature sealant to crimped end of elbow or pipe. (Fig.12) Join pipes and secure joints with three (3) sheetmetal screws. (See Fig. 12) Wipe off excess sealant.

BEAD LOCATION

1" FROM CRIMPED END OF PIPE

1''

Screw Holes

Fig. 12

- 9 -

Image 9 Contents
BHDR36 Table of Contents Locating Your GAS Fireplace Installation InstructionsFireplace Dimensions Mantels Mantel ChartClearance to Combustibles Framing and FinishingGAS Specifications Final FinishingHearth Remote Switch Installation For RN/RP GAS Line InstallationGeneral Venting Information Termination Clearances Rear Venting Applications Rear Wall InstallationsVertical Sidewall Installations Vertical Sidewall Applications HOW to USE the Vent Graph Vent Sidewall InstallationSidewall Venting Graph Ensure Pipes Are Vertical Through Roof Applications Below Grade InstallationsProceed to plumb for additional openings through Vertical Thru Roof InstallationCrimped END Venting Components Rear Venting Applications General Information on Assembling Twist Lock Vent Pipes190mm Vertical Sidewall Applications Vertical Sidewall InstallationsSee page 23 for Venting Requirements for Snorkels NON-COMBUSTIBLE Walls Hole opening must be Installation Below Grade InstallationsRise Vertical Through Roof ApplicationsVertical Through the Roof Installation Twist Lock Venting Components General Glass Information Glass CleaningLouvre Removal Glass Frame RemovalInstallation of Logs Flame AdjustmentLava Rock Maintenance Flame CharacteristicsCleaning the Standing Pilot Control System Inspecting the Venting SystemLighting and Operating Instructions Trouble Shooting the GAS Control System SIT 820 Nova Millivolt Valve Replacement Parts List Replacement Parts Wiring Instructions Optional BAY Window InstallationOptional FAN KIT FK24 Optional Screen KIT Installation Optional Ceramic Refractory InstallationOptional Remote Control
Related manuals
Manual 36 pages 8.11 Kb