Vermont Casting BHDR36 Below Grade Installations, Vertical Through Roof Applications

Page 15

BELOW GRADE INSTALLATIONS

When it is not possible to meet the required vent termi- nal clearances of 12 inches (305mm) above grade level a model #7DVSKS vent kit is recommended. It allows installation depth of down to 7 inches (178mm) below grade level. The 7 inches is measured from the centre

DO NOT BACK FILL AROUND SNORKEL. SOIL SHOULD NOT BE LESS THAN 4" BELOW SNORKEL.

of the horizontal vent pipe as it penetrates through the wall.

If venting system is installed below ground, we recommend a window well with adequate and proper drainage.

Ensure sidewall venting clearances are observed.

FOUNDATION

RECESS

WATERTIGHT

SEAL

AROUND

PIPE

SNORKEL

WALL

SCREWS

SHEET METAL

 

SCREWS

Fig. 31

 

The maximum horizontal run with 24" vertical rise is 36" (915mm) from the back of the fireplace to the face of the exterior wall. See vent graph (Fig. 21) for extended horizontal run if the vertical exceeds 24".

1.Establish vent hole through the wall. See page 14

2.Remove soil to a depth of approximately 16" below base of snorkel. Install window well (not supplied). Refill hole with 12" of coarse gravel leaving a clear- ance of approximately 4" below snorkel. (Fig. 30)

3.Install vent system. See page 15, Steps 2 through 5.

4.Ensure a watertight seal is made around the vent pipe coming through the wall.

5.Apply high temperature sealant caulking (supplied) around the 4 and 7 inch 7DVSKS's snorkel collars.

6.Slide into vent pipe and secure to the wall.

7.Level the soil so as to maintain a 4" clearance below snorkel (Fig. 30).

If the foundation is recessed, use recess brackets (not supplied) for securing lower portion of the snorkel. Fasten brackets to wall first and then secure to snorkel with self drilling #8 x 1/2 sheet metal screws. It will be necessary to extend vent pipes out as far protruding wall face (Fig. 31).

VERTICAL THROUGH THE

ROOF APPLICATIONS

MAXIMUM

10 FT

(3048mm)

MINIMUM

8 FT./

MAXIMUM

40 FT.

VERTICAL

RISE

PIPE STRAPS

ZERO CLEARANCE

SLEEVE IF REQUIRED

FIRESTOP

7DVRT90

SCREWS

7DVSKS (SNORKEL)

MINIMUM

4" CLEARANCE

GROUND

WINDOW WELL

GRAVEL

DRAIN

EVERY 3'

(914mm)

Fig. 32

This Gas Fireplace has been approved for,

a) Vertical installations up to 40 feet (12 metres) in height.

Up to a 10 ft. horizontal vent run can be installed within

the vent system using a maximum of three 90o elbows.

7DVRT90

FOUNDATION WALL

*A minimum of 24"/608mm vertical pipe must be installed when using the 7DVSKS kit.

*The 22" vertical rise (center to

center) of the snorkel may be included for calculation of max. horizontal run.

b) Up to two 45o elbows may be used within the horizontal

run. For each 45o elbow used on the horizontal level

the maximum horizontal length must be reduced by 18

inches.

Example: Maximum horizontal length

 

0

-

45o elbows

10 ft.

1

-

45o elbows

8.5 ft.

Fig. 30

2 - 45o elbows

7 ft.

- 15 -

Image 15 Contents
BHDR36 Table of Contents Locating Your GAS Fireplace Installation InstructionsFireplace Dimensions Framing and Finishing Mantel ChartMantels Clearance to CombustiblesGAS Specifications Final FinishingHearth Remote Switch Installation For RN/RP GAS Line InstallationGeneral Venting Information Termination Clearances Rear Venting Applications Rear Wall InstallationsVertical Sidewall Installations Vertical Sidewall Applications HOW to USE the Vent Graph Vent Sidewall InstallationSidewall Venting Graph Ensure Pipes Are Vertical Through Roof Applications Below Grade InstallationsProceed to plumb for additional openings through Vertical Thru Roof InstallationCrimped END Venting Components Rear Venting Applications General Information on Assembling Twist Lock Vent Pipes190mm Vertical Sidewall Applications Vertical Sidewall InstallationsSee page 23 for Venting Requirements for Snorkels NON-COMBUSTIBLE Walls Hole opening must be Installation Below Grade InstallationsRise Vertical Through Roof ApplicationsVertical Through the Roof Installation Twist Lock Venting Components Glass Frame Removal Glass CleaningGeneral Glass Information Louvre RemovalInstallation of Logs Flame AdjustmentLava Rock Inspecting the Venting System Flame CharacteristicsMaintenance Cleaning the Standing Pilot Control SystemLighting and Operating Instructions Trouble Shooting the GAS Control System SIT 820 Nova Millivolt Valve Replacement Parts List Replacement Parts Wiring Instructions Optional BAY Window InstallationOptional FAN KIT FK24 Optional Screen KIT Installation Optional Ceramic Refractory InstallationOptional Remote Control