VENT SIDEWALL INSTALLATION

*IMPORTANT* Minimum clearance between vent pipes and combustible materials is one (1") inch (25 mm) on bottom, sides and top.

Vent Starter Kit 7TDVSK, plus Transition Elbow 7TDVRT90 must be used in Vertical Sidewall installations. The 4" pipe must be centred inside the 7" pipe coming off the 7TDVRT90 transition elbow.

STEP 1

Locate vent opening on the wall. It may be necessary to first position the fireplace and measure to obtain hole location. Depending on whether the wall is combustible or non- combustible, cut opening to size. Fig. 48 or 50.

(For combustible walls first frame in opening. Fig. 49).

Vent Opening Ñ

Combustible Wall

(240mm)

9-3/8"

9-3/8" (240mm)

Fig. 48

(framing detail)

Fig. 49

Vent Opening Ñ

Noncombustible Wall

7-1/2" (190mm)

Fig. 50

COMBUSTIBLE WALLS (Fig. 48): Cut a 9-3/8"H x 9-3/8"W (240

mmx 240 mm) hole through the exterior wall and frame as shown (Fig. 49).

NON-COMBUSTIBLE WALLS (Fig. 50): Hole opening must be

7.5" (190 mm) in diameter.

STEP 2

Fig. 51. Measure wall thickness and cut adjustable zero clearance sleeve parts to proper length (MAXIMUM 12"). Adjust sleeve to minimum (9-3/8" x 9-3/8") and attach to firestop with #8 sheet metal screws (supplied). Install firestop assembly.

Zero clearance sleeve is only required for combustible walls.

 

Maximum Length

#8

 

SCREWS(2)

 

12" (294mm)

ADJUSTABLE

 

#8

 

ZERO CLEARANCE

 

SCREWS(2)

 

SLEEVE

 

 

 

#8

 

 

SCREWS(2)

 

Fig. 51

ADJUSTABLE ZERO

 

CLEARANCE SLEEVE

 

FIRESTOPFIRESTOP

STEP 3

(Fig. 52) Apply a bead of high temperature sealant to the inner and outer flue collars of the fireplace and using appropriate venting component(s) attach to fireplace with three (3) screws. Follow with the installation of the inner and outer elbow. Again secure joints with three (3) sheet metal screws. Wipe off any excess high temperature sealant.

ENSURE PIPES

 

ARE

 

X

 

7TDVRT90

Fig. 52

BEAD OF

 

SEALANT

 

(IF NECESSARY)

 

STEP 4

(Fig. 53) Measure the horizontal length requirement plus 1-1/2" overlap, i.e. from the elbow to the outside wall finish plus 1-1/2" (or the distance required if installing a second 90º elbow).

 

X

Always

 

install

 

horizontal

 

venting

 

on a

Fig. 53

level

 

plane.

 

- 22 -

Image 22 Contents
BHDR36 Table of Contents Installation Instructions Locating Your GAS FireplaceFireplace Dimensions Clearance to Combustibles Mantel ChartMantels Framing and FinishingFinal Finishing GAS SpecificationsHearth GAS Line Installation Remote Switch Installation For RN/RPGeneral Venting Information Termination Clearances Rear Wall Installations Rear Venting ApplicationsVertical Sidewall Installations Vertical Sidewall Applications Vent Sidewall Installation HOW to USE the Vent GraphSidewall Venting Graph Ensure Pipes Are Below Grade Installations Vertical Through Roof ApplicationsVertical Thru Roof Installation Proceed to plumb for additional openings throughCrimped END Venting Components General Information on Assembling Twist Lock Vent Pipes Rear Venting Applications190mm Vertical Sidewall Installations Vertical Sidewall ApplicationsSee page 23 for Venting Requirements for Snorkels NON-COMBUSTIBLE Walls Hole opening must be Below Grade Installations InstallationVertical Through Roof Applications RiseVertical Through the Roof Installation Twist Lock Venting Components Louvre Removal Glass CleaningGeneral Glass Information Glass Frame RemovalFlame Adjustment Installation of LogsLava Rock Cleaning the Standing Pilot Control System Flame CharacteristicsMaintenance Inspecting the Venting SystemLighting and Operating Instructions Trouble Shooting the GAS Control System SIT 820 Nova Millivolt Valve Replacement Parts List Replacement Parts Optional BAY Window Installation Wiring InstructionsOptional FAN KIT FK24 Optional Ceramic Refractory Installation Optional Screen KIT InstallationOptional Remote Control
Related manuals
Manual 36 pages 8.11 Kb