Vermont Casting BHDR36 installation instructions SIT 820 Nova Millivolt Valve

Page 32

TROUBLE SHOOTING THE GAS CONTROL SYSTEM

SIT 820 NOVA MILLIVOLT VALVE

GLASS DOOR TO BE REMOVED BEFORE SERVICE WORK

START

GAS SUPPLY ON

LIGHT PILOT WITH

PIEZO IGNITION

YES

NO

NO

CHECK

SHUTOFF VALVE OPEN

CONFIRM GAS HOOK-UP

ELECTRODE GAP MIN. 1/8"

ELECTRODE CRACKED

ELECTRODE CABLE ATTACHED

PIEZO IGNITOR GENERATES SPARK

ELECTRODE CABLE NOT GROUNDED

PILOT STAYS ON

YES

NO

FLAME ENGULFING THERMOCOUPLE BY 3/8"

THERMOCOUPLE ATTACHED TO VALVE

MNIMUM MILLIVOLT:

OPEN CIRCUIT 18MV

CLOSED CIRCUIT 5MV

VENT SAFETY SWITCH TIGHT AND NO SHORTS

(FOR UNITS EQUIPPED WITH VENT SAFETY SWITCH)

MAIN BURNER ON

NO

REMOTE SYSTEM ON

REMOTE SYSTEM WIRE SHORTING OUT

MINIMUM MILLIVOLT: OPEN CIRCUIT 300MV CLOSED CIRCUIT 165MV

FLAME ENGULFING THERMOPILE/THERMOCOUPLE

VALVE IS IN ON POSITION

- 32 -

Image 32 Contents
BHDR36 Table of Contents Installation Instructions Locating Your GAS FireplaceFireplace Dimensions Mantel Chart MantelsClearance to Combustibles Framing and FinishingHearth GAS SpecificationsFinal Finishing GAS Line Installation Remote Switch Installation For RN/RPGeneral Venting Information Termination Clearances Rear Wall Installations Rear Venting ApplicationsVertical Sidewall Installations Vertical Sidewall Applications Sidewall Venting Graph HOW to USE the Vent GraphVent Sidewall Installation Ensure Pipes Are Below Grade Installations Vertical Through Roof ApplicationsVertical Thru Roof Installation Proceed to plumb for additional openings throughCrimped END Venting Components General Information on Assembling Twist Lock Vent Pipes Rear Venting Applications190mm Vertical Sidewall Installations Vertical Sidewall ApplicationsSee page 23 for Venting Requirements for Snorkels NON-COMBUSTIBLE Walls Hole opening must be Below Grade Installations InstallationVertical Through Roof Applications RiseVertical Through the Roof Installation Twist Lock Venting Components Glass Cleaning General Glass InformationLouvre Removal Glass Frame RemovalLava Rock Installation of LogsFlame Adjustment Flame Characteristics MaintenanceCleaning the Standing Pilot Control System Inspecting the Venting SystemLighting and Operating Instructions Trouble Shooting the GAS Control System SIT 820 Nova Millivolt Valve Replacement Parts List Replacement Parts Optional FAN KIT FK24 Wiring InstructionsOptional BAY Window Installation Optional Remote Control Optional Screen KIT InstallationOptional Ceramic Refractory Installation
Related manuals
Manual 36 pages 8.11 Kb