Vermont Casting BHDR36 installation instructions Trouble Shooting the GAS Control System

Page 31

TROUBLE SHOOTING THE GAS CONTROL SYSTEM

HONEYWELL MILLIVOLT VALVE

START

¥ GAS SUPPLY ON

YES

PILOT LIGHTS WITH PIEZO IGNITOR

YES

PILOT STAYS LIT

YES

PILOT LIGHTS MAIN BURNER

YES

SYSTEM OK.

 

 

 

 

 

CHECK

NO

 

 

 

¥ SUPPLY LINE HOOKED UP

 

 

 

 

 

 

 

¥ SHUTOFF VALVE OPEN

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

¥ LOCKOUT HAS ENGAGED. WAIT

 

 

 

 

 

60 SECONDS AND TRY AGAIN.

 

 

 

 

 

¥ FOR SPARK AT ELECTRODE

 

 

 

 

 

WHILE DEPRESSING PIEZO

 

 

 

 

 

Ñ 1/8" GAP TO

NO

 

 

 

 

PILOT HOOD NEEDED.

 

 

 

¥ALL WIRING CONNECTIONS

¥REPLACE PIEZO IGNITOR

¥FOR AIR IN THE LINES

¥THERMOPILE NEEDS A MINIMUM 325mV. ADJUST PILOT FLAME HEIGHT.

¥ALL WIRING CONNECTIONS.

NO ¥ REPLACE THERMOPILE

¥THERMOCOUPLE NEEDS A MINIMUM OF 14mV.

¥DEFECTIVE VALVE. TURN TO PILOT, METER SHOULD READ GREATER THAN 100 mV. IF NOT, REPLACE.

¥VALVE IS TURNED ON

¥ON/OFF SWITCH IS NOT

TURNED ON. WATCH

NO FOR GROUNDED WIRES!

¥THERMOPILE NEEDS A MINIMUM 325mV.

¥PLUGGED BURNER ORIFICE.

- 31 -

Image 31 Contents
BHDR36 Table of Contents Locating Your GAS Fireplace Installation InstructionsFireplace Dimensions Framing and Finishing Mantel ChartMantels Clearance to CombustiblesFinal Finishing GAS SpecificationsHearth Remote Switch Installation For RN/RP GAS Line InstallationGeneral Venting Information Termination Clearances Rear Venting Applications Rear Wall InstallationsVertical Sidewall Installations Vertical Sidewall Applications Vent Sidewall Installation HOW to USE the Vent GraphSidewall Venting Graph Ensure Pipes Are Vertical Through Roof Applications Below Grade InstallationsProceed to plumb for additional openings through Vertical Thru Roof InstallationCrimped END Venting Components Rear Venting Applications General Information on Assembling Twist Lock Vent Pipes190mm Vertical Sidewall Applications Vertical Sidewall InstallationsSee page 23 for Venting Requirements for Snorkels NON-COMBUSTIBLE Walls Hole opening must be Installation Below Grade InstallationsRise Vertical Through Roof ApplicationsVertical Through the Roof Installation Twist Lock Venting Components Glass Frame Removal Glass CleaningGeneral Glass Information Louvre RemovalFlame Adjustment Installation of LogsLava Rock Inspecting the Venting System Flame CharacteristicsMaintenance Cleaning the Standing Pilot Control SystemLighting and Operating Instructions Trouble Shooting the GAS Control System SIT 820 Nova Millivolt Valve Replacement Parts List Replacement Parts Optional BAY Window Installation Wiring InstructionsOptional FAN KIT FK24 Optional Ceramic Refractory Installation Optional Screen KIT InstallationOptional Remote Control
Related manuals
Manual 36 pages 8.11 Kb