Vermont Casting 3369, 3399, 3354, 3232, 3225, 3390, 3350, 3360 manual Measure the horizontal length

Page 17

12”

 

(305mm)

Sleeve

Max. Length

 

 

#8 Sheet

 

Metal Screws

Firestop

ZCS103

 

Fig. 25 Assemble the wall sleeve and firestop.

 

For DuraVent pipe only: Install vent pipe by align- ing the locking system together, sliding the pipes together and twisting clockwise.

Install 90° elbow. Twist lock as before.

Slide the wall plate over horizontal run before at- taching the horizontal run to the elbow. Fasten wall plate to wall.

4.For CFM Vent Pipe only: If necessary, measure to determine the vertical length (X) of pipe required from the adapter pipe to the wall cutout centerline, including a 2” overlap at the joint. (Fig. 26) use a hacksaw or tin snips to trim the pipe as needed.

Radiance Direct Vent /Natural Vent Gas Heater

6.Install the elbow using 3 sheet metal screws at each joint.

7.Measure, and cut if needed, the appropriate length of pipe section needed to make the connection through the wall. Include a 2” overlap; i.e. from the elbow to the outside wall face, about 2” or the dis- tance required if installing a second 90° elbow. (Fig. 27)

8.Slip the wall plate and trim collar over the interior end of the horizontal pipe and install into the wall sleeve. Seal the joint inside the wall plate if needed to keep cold air from being drawn into the home.

9.Connect the horizontal pipe to the elbow. Fasten the wall plate to the pipe with three sheet metal screws. Slide the trim collar up against the wall plate to cover the screws. (Fig. 28)

X

ST215

Fig. 27 Measure the horizontal length.

X

RADIANCE

Wall

Sleeve

ST216

Trim Collar

Wall Plate

ST652

Fig. 26 Determine the vertical pipe length.

5.Install first the inner then the outer straight pipe section(s), trimmed end down, to the point of the el- bow. Drill 3 holes through each joint and fasten with sheet metal screws.

Fig. 28 Install the horizontal pipe and wall plate parts.

10.For both CFM and DuraVent Systems: Install the vent terminal. (Fig. 29) Apply high temperature seal- ant one inch from the ends of the inner and outer collars. Guide the inner and outer vent termination collars into the adjacent pipes. Double check that the vent pipes overlap the collars by 2”. Fasten the termination to the wall with the screws provided, and caulk the joint with weatherproof sealant.

20004188

17

Image 17
Contents Radiance Direct Vent/Natural Vent Gas Heater Table Of Contents Installation & Operating Instructions Radiance dimensions Radiance Direct Vent/Natural Vent Stove DimensionsClearance Requirements Installation RequirementsLocating The Stove Hearth Requirements Wall Centerline from FloorWall and Ceiling Clearances Gas Inlet and Manifold Pressures Gas SpecificationsHigh Elevations Horizontal Termination Direct Vent onlyVent Termination Clearances Restictor Plate is used on Direct Vent installations onlyVertical Termination Direct Vent only Location of Vent Termination General Venting Information Termination Location Canadian Installations1 US Installations2Plate supplied with the stove is not used Venting Requirements Natural Vent OnlyApproved Vent System Components Venting Requirements and Options Direct Vent onlyParts Bag Contents Assembly ProceduresTools Required Unpack and Assemble LegsRemove rear shroud Install the Optional FanInstall the Vent Adapter Pipe Venting System Assembly Direct Vent General InformationFor Canadian installations The venting system must Attach the Inner Vent Assembly to the stoveDiscard the inner starter pipe shipped with the log Side Wall Termination AssemblyInstall the Outer Adapter Pipe. Orient the verti Measure the horizontal length Vent Termination Below Grade Vertical Through the Roof Vent AssemblyInstall firestops and attic insulation shield Venting System Assembly Natural Vent General InformationInstall Log Set Install the Vent PipeConnect the Gas Supply Line Install the left and right rear logs and the right logInstall the Mesh and Grille Install ON/OFF SwitchBurner Information Thermostat Connection optionalFlame Characteristics Flame & Temperature AdjustmentOperation Your First FireTo Turn Off Gas To Heater Lighting and Operating InstructionsSymptom Possible Causes Corrective Action Troubleshooting / Honeywell #8420 Gas Control SystemTransmitter Operation Off Mode Shut Off ProcedureOn Manual Mode Delay Timer ModeFan Override During Auto Mode Auto ModeChange Between F/C Temperature Units Disable Thermostat FunctionLocal Path On Path Auto Path Conversion Procedure Conversion PrecautionsFuel Conversion Instructions Burner Orifice ConversionPilot Orifice Conversion SIT 820 ValvePilot Type 1 SIT Pilot Pilot type 2 Honeywell PilotAll Models Models 3352, 3354, 3390 thru 3399 RF Models OnlyInjector Orifice Size Matrix Air Shutter AdjustmentConversion to Natural Gas Input BTU/h Conversion to LP Input BTU/hMaintenance Check the Gas Flame Regularly Gasket ReplacementInspect the Vent System Annually BLK Wiring DiagramsDescription Radiance Direct Vent/Natural Vent Gas Heater RdvodRadiance Direct Vent/Natural Vent Gas Heater Rdvod Shell Enamel Parts Radiance Direct Vent / Natural Vent Fuel Conversion KitsOptional Accessories Radiance Direct Vent /Natural Vent Gas Heater 4242 Limited Lifetime Warranty Model EnerGuide Ratings Fireplace Efficiency % Efficiency Ratings