Vermont Casting 3354, 3399 Vent Termination Below Grade, Vertical Through the Roof Vent Assembly

Page 18

Radiance Direct Vent/Natural Vent Gas Heater

11.For CFM only: Install Charcoal Gray Pipe Rings (#7FSDRG) or Polished Brass Pipe Rings (#7FSDRP) at pipe joints, if desired.

Seal Both Termi- nal Ends

Caulk Plate Joint with

ST217

Weatherproof Sealant

Recessed Wall

Sheet Metal

Screws and

Bracket

Wall Screws

and Anchors

Waterproof Seal Around Pipe

ST219

Firestop

Finishing

Collar

7” Pipe

Wall Plate

Fig. 29 Install the vent terminal.

Vent Termination Below Grade

Install Snorkel Kit #7FSDVSKS when it is not possible to meet the required vent termination clearances of 12” (305mm) above grade level. The snorkel kit will allow installation depth of down to 7” (178mm) below grade level. The seven inches is measured from the center of the horizontal vent pipe as it penetrates the wall. If the venting system is installed below grade, a window well must be installed with adequate and proper drainage. (Fig. 31)

NOTE: Be sure to maintain side wall clearances and vent run restrictions. Refer to Page 6, Figures 3, 4, 5, 6.

1.Establish the vent hole through the wall.

2.Remove soil to a depth of approximately 16” (406 mm) below the base of the snorkel. Install a window well (not supplied). Refill the hole with 12” (305mm) of coarse gravel and maintain a clearance of at least 4” (102 mm) below the snorkel. (Fig. 31)

3.Install the vent system as described on pages 15-18.

4.Be sure to make a watertight joint around the vent pipe joint at the inside and outside wall joints.

5.Apply high temperature sealant around the inner and outer snorkel collars. Join the pipes and fasten the snorkel termination to the wall with the screws provided.

6.Level the soil to maintain a 4” clearance below the snorkel.

If the foundation is recessed, use extension brack- ets (not supplied) to fasten the lower portion of the snorkel. Fasten the brackets to the wall first, and then fasten to the snorkel with self-tapping #8 x 1/2” sheet metal screws. Extend the vent pipes out as far as the protruding wall face. (Fig. 30)

Fig. 30 Use extension brackets to mount snorkel against recessed wall.

 

Wall Screws

 

 

and Anchors

Waterproof Seal

 

 

Snorkel

Around Pipe

Termination

Firestop

Cap

 

 

 

4” Clearance

 

 

Gravel

 

 

Drain

 

 

Window Well

 

 

 

RADIANCE

 

 

ST653

Fig. 31

Snorkel kit installation.

 

Vertical (Through the Roof)

Vent Assembly

Note that all vertically terminated installations must, where specified, use the restrictor plate to comply with Vertical Termination Window (Page 7, Figure 8), included in the hardware bag. The plate must be installed within the firebox inner flue collar to insure a proper air/fuel ratio is maintained in an appli- ance vented through the roof.

1818

20004188

Image 18
Contents Radiance Direct Vent/Natural Vent Gas Heater Table Of Contents Installation & Operating Instructions Radiance Direct Vent/Natural Vent Stove Dimensions Radiance dimensionsInstallation Requirements Locating The StoveClearance Requirements Wall Centerline from Floor Wall and Ceiling ClearancesHearth Requirements High Elevations Gas SpecificationsGas Inlet and Manifold Pressures Horizontal Termination Direct Vent onlyRestictor Plate is used on Direct Vent installations only Vertical Termination Direct Vent onlyVent Termination Clearances Location of Vent Termination Canadian Installations1 US Installations2 General Venting Information Termination LocationVenting Requirements Natural Vent Only Plate supplied with the stove is not usedVenting Requirements and Options Direct Vent only Approved Vent System ComponentsTools Required Assembly ProceduresParts Bag Contents Unpack and Assemble LegsInstall the Optional Fan Remove rear shroudFor Canadian installations The venting system must Venting System Assembly Direct Vent General InformationInstall the Vent Adapter Pipe Attach the Inner Vent Assembly to the stoveSide Wall Termination Assembly Install the Outer Adapter Pipe. Orient the vertiDiscard the inner starter pipe shipped with the log Measure the horizontal length Vertical Through the Roof Vent Assembly Vent Termination Below GradeVenting System Assembly Natural Vent General Information Install firestops and attic insulation shieldInstall the Vent Pipe Install Log SetInstall the left and right rear logs and the right log Connect the Gas Supply LineBurner Information Install ON/OFF SwitchInstall the Mesh and Grille Thermostat Connection optionalOperation Flame & Temperature AdjustmentFlame Characteristics Your First FireLighting and Operating Instructions To Turn Off Gas To HeaterTroubleshooting / Honeywell #8420 Gas Control System Symptom Possible Causes Corrective ActionOn Manual Mode Shut Off ProcedureTransmitter Operation Off Mode Delay Timer ModeChange Between F/C Temperature Units Auto ModeFan Override During Auto Mode Disable Thermostat FunctionLocal Path On Path Auto Path Fuel Conversion Instructions Conversion PrecautionsConversion Procedure Burner Orifice ConversionPilot Type 1 SIT Pilot SIT 820 ValvePilot Orifice Conversion Pilot type 2 Honeywell PilotModels 3352, 3354, 3390 thru 3399 RF Models Only All ModelsConversion to Natural Gas Input BTU/h Air Shutter AdjustmentInjector Orifice Size Matrix Conversion to LP Input BTU/hMaintenance Gasket Replacement Inspect the Vent System AnnuallyCheck the Gas Flame Regularly Wiring Diagrams BLKRadiance Direct Vent/Natural Vent Gas Heater Rdvod DescriptionRadiance Direct Vent/Natural Vent Gas Heater Rdvod Fuel Conversion Kits Shell Enamel Parts Radiance Direct Vent / Natural VentOptional Accessories Radiance Direct Vent /Natural Vent Gas Heater 4242 Limited Lifetime Warranty Efficiency Ratings Model EnerGuide Ratings Fireplace Efficiency %