DVS 30-2 installation instructions Installation

Page 12

INSTALLATION (continued)

VERTICAL, 90° ELBOW WITH HORIZONTAL

VERTICAL, 90° ELBOW TO HORIZONTAL OUT THE

TERMINATION

 

 

 

 

 

 

 

WALL

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Figure 14

HORIZONTAL ONLY, STRAIGHT OUT THE BACK

WALL FIRESTOP

NO

4" TO 5 5/8"

PIPE

102mm TO 143mm

 

5 5/8"" TO 11 5/8"

143mm TO 295mm

11 1/8"" TO 14 5/8"

283mm TO 371mm

14 1/8"" TO 17 5/8"

359mm TO 448mm

Figure 15

WALL FIRESTOP

9 7/16" TO 10 9/16"

240mm TO 268mm

10 13/16" TO 13 9/16"

275mm TO 344mm

14" TO 16 9/16"

356mm TO 421mm

Figure 16

Page 12

13369-1-0203

Image 12
Contents Installation Instructions Table of Contents Important Safety Information Safety Information for Users of LP-GAS LP-GAS Warning OdorIntroduction Specifications Fireplace Dimensions Model DVS-30/DVS-36/DVS-42Fireplace Component Installation Heater Baffle is Used on DVS-36 & DVS-42 onlyMantel Chart Figure ClearancesLocating Fireplace Clearances FigureInstalling a New Main Gas Cock GAS SupplyChecking Manifold Pressures Installation Venting FireplaceExample a Example BThree 3 basic types of installations Framing FigureFinishing Figure Vent Runs Figures 14, 15, 16, 17Installation Vertical Sidewall Application Positioning the Fireplace MAX Cutting the Hole Figures 22Vertical Sidewall Installations Termination ClearancesInformation on Various Venting Routes and Components Vent Clearances Installing Vent Components Figure Vent System IdentificationInner flue joints do not require any sealant Installing Support Brackets Figure Installing Firestops Figures 30, 31, 32DVS-30 Framing and Finishing DVS-30 Framing and Finishing Installing Firestops Figures 35, 36, 37 DVS-36 & DVS-42 Framing and FinishingDVS-36 & DVS-42 Framing and Finishing Installing the Vent System in a Chase Vertical Termination For All ModelsLOG Placement Reassembly and Resealing Vent Pipe SystemVertical Through the Roof Applications Figure Glass RemovalGlass Replacement DVS-30 Placement of glowing embersDVS-36 and DVS-42 Placement of glowing embers TOP View of LOG SETStanding Pilot Operating Instructions Flame AppearanceMillivolt System Figures 48 Recommended Wire Gauges Standing Pilot Wiring Diagram Standing Pilot Lighting Instructions What to do if YOU Smell GASStanding Pilot Troubleshooting Frequent pilot outage problemPilot and main burner extinguish while in operation Glass sootsDVS-36 & DVS-42 Intermittent Pilot Wiring Diagram Electrical Connection FigureTo Turn OFF GAS to Appliance Specifications OperationTrial for Ignition CheckoutSafety Lockout Main Burner OperationIgnition System Checks ARC Length ActionDVS-36 & DVS-42 Intermittent Pilot Troubleshooting RF Standing Pilot Operating Instructions RF Wiring Diagram RF Standing Pilot Lighting Instructions Maintenance and Service Please NoteHOW to Order Repair Parts DVS-30 Parts ListDVS-36 Parts List #41 Orifice NATDVS-42 Parts List Parts View Accessory Parts LouversVariable Speed Blower Installation Instructions Blower Motor Optional Single Speed Blower Installation Instructions FBB1A Blower InstallationParts List Optional Fresh AIR Intake KIT DVFB-AK-30, FB-AK-2 Optional Fresh Air Intake Kit FigureExample of Installation Installing Optional Brick Liner Parts ListBrick Liner KIT DVS-BL-30-2, DVS- BL-36-2, DVS-BL-42-2