DVS 30-2 installation instructions Vertical Sidewall Application

Page 13

CORNER INSTALLATION VERTICAL, 90° ELBOW TO

HORIZONTAL OUT THE WALL

Figure 17

CORNER INSTALLATION HORIZONTAL, 45° ELBOW

TO HORIZONTAL OUT THE WALL

WALL FIRESTOP

"B"

4" TO 7 1/2"

102mm TO 191mm

7 5/8"" TO 10 5/8"

194mm TO 270mm

Figure 18

Vertical Sidewall Application

Figure 19

Figure 20 and Chart 1 lists examples of possible venting systems using one (1) 90° elbow. Eight (8) feet is listed as maximum vertical vent run with 20 feet of maximum horizontal vent run. Vertical dimensions are based on centerline to centerline of pipe. Horizontal dimensions are based on centerline of pipe to end of termination.

SEE CHART FOR PERMISSIBLE "H" AND "V" DIMENSIONS

Figure 20

13369-1-0203

Page 13

Image 13
Contents Installation Instructions Table of Contents Important Safety Information LP-GAS Warning Odor Safety Information for Users of LP-GASIntroduction Fireplace Dimensions Model DVS-30/DVS-36/DVS-42 SpecificationsHeater Baffle is Used on DVS-36 & DVS-42 only Fireplace Component InstallationClearances Mantel Chart FigureLocating Fireplace Clearances FigureGAS Supply Installing a New Main Gas CockChecking Manifold Pressures Venting Fireplace InstallationExample a Example BFraming Figure Three 3 basic types of installationsFinishing Figure Vent Runs Figures 14, 15, 16, 17Installation Vertical Sidewall Application Positioning the Fireplace Cutting the Hole Figures 22 MAXTermination Clearances Vertical Sidewall InstallationsInformation on Various Venting Routes and Components Vent Clearances Vent System Identification Installing Vent Components FigureInner flue joints do not require any sealant Installing Firestops Figures 30, 31, 32 Installing Support Brackets FigureDVS-30 Framing and Finishing DVS-30 Framing and Finishing DVS-36 & DVS-42 Framing and Finishing Installing Firestops Figures 35, 36, 37DVS-36 & DVS-42 Framing and Finishing Vertical Termination For All Models Installing the Vent System in a ChaseReassembly and Resealing Vent Pipe System LOG PlacementVertical Through the Roof Applications Figure Glass RemovalDVS-30 Placement of glowing embers Glass ReplacementDVS-36 and DVS-42 Placement of glowing embers TOP View of LOG SETFlame Appearance Standing Pilot Operating InstructionsMillivolt System Figures 48 Recommended Wire Gauges Standing Pilot Wiring Diagram What to do if YOU Smell GAS Standing Pilot Lighting InstructionsFrequent pilot outage problem Standing Pilot TroubleshootingPilot and main burner extinguish while in operation Glass sootsElectrical Connection Figure DVS-36 & DVS-42 Intermittent Pilot Wiring DiagramTo Turn OFF GAS to Appliance Operation SpecificationsTrial for Ignition CheckoutMain Burner Operation Safety LockoutARC Length Action Ignition System ChecksDVS-36 & DVS-42 Intermittent Pilot Troubleshooting RF Standing Pilot Operating Instructions RF Wiring Diagram RF Standing Pilot Lighting Instructions Please Note Maintenance and ServiceDVS-30 Parts List HOW to Order Repair Parts#41 Orifice NAT DVS-36 Parts ListDVS-42 Parts List Parts View Louvers Accessory PartsVariable Speed Blower Installation Instructions Blower Motor FBB1A Blower Installation Optional Single Speed Blower Installation InstructionsParts List Optional Fresh Air Intake Kit Figure Optional Fresh AIR Intake KIT DVFB-AK-30, FB-AK-2Example of Installation Parts List Installing Optional Brick LinerBrick Liner KIT DVS-BL-30-2, DVS- BL-36-2, DVS-BL-42-2