DVS 30-2 LOG Placement, Reassembly and Resealing Vent Pipe System, Glass Removal

Page 24

VERTICAL TERMINATION (For All Models) (continued)

Reassembly and Resealing Vent Pipe System

Attach adapter pipe to vent cover in either the vertical or horizontal position, replace horizontal and vertical pipe lengths, elbows and horizontal or vertical termination kit.

All vent system components lock into place by sliding the concentric pipe section with four (4) equally spaced interior beads onto the appliance collar or previously installed component end with four (4) equally spaced indented sections. When the internal beads of each starting outer pipe line up, rotate pipe section clockwise 90° (approximately 3 inches). The vent pipe is now locked together.

Continue replacing components per the vent system configuration. Be certain that each succeeding vent component is securely fitted and locked into the preceding component in the vent system.

Reassembly and Resealing Gas Accumulation Relief System (Relief Doors) and Combustion Chamber

Whenever the relief door is pivoted open by a delayed ignition in the main burner, the relief door gaskets and combustion chamber must be examined by a qualified service person for damage. All damaged gaskets on the relief door and combustion chamber must be replaced by a qualified service person. If damage occurs to the combustion chamber, it must be replaced by a qualified service person. Contact Empire Comfort Systems, Inc. for replacement parts.

Vertical Through the Roof Applications (Figure 42)

Your Gas Fireplace has been approved for:

a) Vertical installations up to 25 feet in height.

b)Two sets of 45 degree elbow offsets within these vertical installations. From 0 to a maximum of 8 ft. a vent pipe can be used between elbows.

c)Wall straps must be used to support offset pipe every 4'.

This applications will require that you first determine the roof pitch and use the appropriate venting components.

Figure 42

LOG PLACEMENT

Before you begin: This unit is supplied with a set of five ceramic fiber logs. Do not handle these logs with your bare hands! Al- ways wear gloves to prevent skin irritation from ceramic fibers. After handling logs, wash your hands gently with soap and water to remove any traces of fibers.

Every burner is shipped with a shipping plate. This shipping plate must be removed before log placement.

The positioning of the logs is critical to the safe and clean opera- tion of this fireplace. Sooting and other problems may result if the logs are not properly and firmly positioned in the fireplace.

Glass Removal

1.Push up and outward to remove top louver.

2.Lower door assembly.

3.Release two door latches at bottom of firebox.

4.Grasp bottom of glass frame, lift glass frame upward in order to release glass frame from lip on top of firebox.

5.Remove shipping plate from burner pan.

6.Place two (2) log grates onto two (2) left, front pins and two

(2) right, front pins on burner pan. Secure grates with two (2) Tinnerman clips.

CORRECT GRATE INSTALLATION FOR 42" LOG SETS

INCORRECT GRATE INSTALLATION FOR 42" LOG SETS

Figure 43

Page 24

13369-1-0203

Image 24
Contents Installation Instructions Table of Contents Important Safety Information Safety Information for Users of LP-GAS LP-GAS Warning OdorIntroduction Specifications Fireplace Dimensions Model DVS-30/DVS-36/DVS-42Fireplace Component Installation Heater Baffle is Used on DVS-36 & DVS-42 onlyMantel Chart Figure ClearancesLocating Fireplace Clearances FigureInstalling a New Main Gas Cock GAS SupplyChecking Manifold Pressures Installation Venting FireplaceExample a Example BThree 3 basic types of installations Framing FigureFinishing Figure Vent Runs Figures 14, 15, 16, 17Installation Vertical Sidewall Application Positioning the Fireplace MAX Cutting the Hole Figures 22Vertical Sidewall Installations Termination ClearancesInformation on Various Venting Routes and Components Vent Clearances Installing Vent Components Figure Vent System IdentificationInner flue joints do not require any sealant Installing Support Brackets Figure Installing Firestops Figures 30, 31, 32DVS-30 Framing and Finishing DVS-30 Framing and Finishing Installing Firestops Figures 35, 36, 37 DVS-36 & DVS-42 Framing and FinishingDVS-36 & DVS-42 Framing and Finishing Installing the Vent System in a Chase Vertical Termination For All ModelsLOG Placement Reassembly and Resealing Vent Pipe SystemVertical Through the Roof Applications Figure Glass RemovalGlass Replacement DVS-30 Placement of glowing embersDVS-36 and DVS-42 Placement of glowing embers TOP View of LOG SETStanding Pilot Operating Instructions Flame AppearanceMillivolt System Figures 48 Recommended Wire Gauges Standing Pilot Wiring Diagram Standing Pilot Lighting Instructions What to do if YOU Smell GASStanding Pilot Troubleshooting Frequent pilot outage problemPilot and main burner extinguish while in operation Glass sootsDVS-36 & DVS-42 Intermittent Pilot Wiring Diagram Electrical Connection FigureTo Turn OFF GAS to Appliance Specifications OperationTrial for Ignition CheckoutSafety Lockout Main Burner OperationIgnition System Checks ARC Length ActionDVS-36 & DVS-42 Intermittent Pilot Troubleshooting RF Standing Pilot Operating Instructions RF Wiring Diagram RF Standing Pilot Lighting Instructions Maintenance and Service Please NoteHOW to Order Repair Parts DVS-30 Parts ListDVS-36 Parts List #41 Orifice NATDVS-42 Parts List Parts View Accessory Parts LouversVariable Speed Blower Installation Instructions Blower Motor Optional Single Speed Blower Installation Instructions FBB1A Blower InstallationParts List Optional Fresh AIR Intake KIT DVFB-AK-30, FB-AK-2 Optional Fresh Air Intake Kit FigureExample of Installation Installing Optional Brick Liner Parts ListBrick Liner KIT DVS-BL-30-2, DVS- BL-36-2, DVS-BL-42-2