Hampton Direct H25-NG1, H25-LP1 installation manual Offset Chart

Page 24

INSTALLATION

Diagram 8

3)To install the Round Support Box/Wall Thim- ble in a fl at ceiling, cut a 10 inch square hole in the ceiling centred on the hole drilled in Step 2. Frame the hole as shown in diagram 9.

Diagram 9

4)Assemble the desired lengths of black pipe and elbows necessary to reach from the appliance adapter up though the Round Support Box. Insure that all pipes and elbow connections are in the fully twist-locked position and sealed.

Diagram 10: The upper half of the fl ashing is installed under the roofi ng material and not nailed down until the chimney is installed. This allows for small adjustments.

Note: If an offset is necessary in the attic to avoid obstructions, it is important to support the vent pipe every 3 feet, to avoid excessive stress on the elbows, and possible separation. Wall straps are available for this purpose. See diagram 5.

Galvanizedpipeandelbowsmaybeutilized in the attic as well as above the roofl ine. The galvanized fi nish is desirable above the roofl ine due to its higher corrosion resistance.

Continue to add pipe sections through the

ashing until the height of the vent cap meets the minimum height requirements specifi ed in diagram 11 or local codes. Note that for steep roof pitches, the vertical height must be increased. A poor draft, or down drafting can result from high wind conditions near big trees or adjoining roof lines, in these cases, increasing the vent height may solve the problem.

7)Ensure vent is vertical and secure the base of the fl ashing to the roof with roofi ng rails, slide storm collar over the pipe section and seal with a mastic.

8)Install the vertical termination cap by twist locking it.

Notes:

a)For multistorey vertical installations, a Ceiling Fire stop (Part # 963) is required at the second floor, and any subsequent fl oor. Diagram 12. The opening should be framed to 10 " x 10" inside dimen- sions, in the same manner as shown in diagram 9.

b)Any occupied areas above the first floor, including closets and storage spaces, through which the vertical vent passes, must be enclosed.

Diagram 12

Offset Chart

Hint: Apply the sealant (Mill-Pac and/or high tem- peraturesilicone) to the outer pipe before connect- ing the inner pipe.

5)Cut a hole in the roof centred on the small drilled hole placed in the roof in Step 2. The hole should be of suffi cient size to meet the minimum requirements for clearance to combustibles of 1-1/4". Slip the fl ashing under the shingles (shingles should overlap half the fl ashing) as per diagram 10.

6)Continue to assemble pipe lengths.

Diagram 11

Roof Pitch

Minimum Vent Height

 

Feet

Meters

fl at to 7/12

2

0.61

over 7/12 to 8/12

2

0.61

over 8/12 to 9/12

2

0.61

over 9/12 to 10/12

2.5

0.76

over 10/12 to 11/12

3.25

0.99

over 11/12 to 12/12

4

1.22

over 12/12 to 14/12

5

1.52

over 14/12 to 16/12

6

1.83

over 16/12 to 18/12

7

2.13

over 18/12 to 20/12

7.5

2.29

over 20/12 to 21/12

8

2.44

 

 

 

24

Hampton® H25-1 Direct Vent Freestanding Gas Stove

Image 24
Contents H25 Direct Vent Gas Fireplace Unit Dimensions HamptonTo the New Owner Table of Contents Safety Label Copy of Safety Label for H25-NG1 & H25-LP1Requirements MA Code CO DetectorInstallation Important MessageInstructions Before YOU StartGeneral Safety Information Installation ChecklistClearances to Combustibles This includesOptional FAN Installation Locating Your GAS StoveManufactured Mobile Home Additional Requirements Fan Kit ContainsInstallation Precautions Vent Restrictor PositionRotating 45O Elbow Remove all 4 screws WashersExterior Vent Terminal Locations Rigid Pipe Venting Components List SV4LB6Rigid Pipe Venting Systems AlternateHorizontal CapsVenting Arrangements Dura-Vent Snorkel TerminationHorizontal Venting with Two 2 90o Elbows + H1 With these options, maxVertical Venting with Two 2 90o Elbows + V1 With these options, max. totalVertical Termination with CO-LINEAR Flex System Straight Vertical TerminationsDescription Alternate Approved CapsDV Stove Horizontal Vent KIT Qty. DescriptionMust be used to ensure that the termination is not Planning Your venting Installation Minimum components for a Horizontal InstallationOptional Components Planning Your Dura-Vent Installation DURA-VENT Termination KITDURA-VENT Venting Dura-Vent Basic Horizontal Kit #Below Grade Snorkel Installation Horizontal TerminationsMinimum components for a Dura-Vent Verti- cal Termination Snorkel TerminationsVertical Terminations Offset Chart Approved for US Installations Only Converting a Factory Built Metal ChimneyAeration Adjustment Cathedral CeilingsHigh Elevation GAS ConnectionGAS Pipe Pressure Testing Valve DescriptionClockwise to open Counter-clockwise to close Conversion KIT #434-969 from NG to LP LPG Conversion Kit Contains QtyGlow on logs Installation of the DC Sparker for the H25-1 Unit Only LOG SET Installation Shut off the gas supplyLift off the Cast Top and remove the Glass Front see manual Are fragile, handle with care do not force into positionLogs must be oriented as shown below Remote Control Wall ThermostatOn an interior wall Rear View Decorative Door GrillWiring Diagrams Final CheckFor Propane Units and Units Equipped with DC Spark Boxes Operating Instructions For Your Safety Read Before Lighting Copy of the Lighting Plate InstructionsMaintenance Maintenance InstructionsNormal Operating Sounds GAS Appliances FAN Maintenance LOG ReplacementGlass Replacement Replacement 946-327 GlassInstalling Valve Assembly To remove valve from valve assembly, continueRemoving Valve ScrewsParts List Main AssemblyBurner & LOG Assembly Warranty ConditionsInstaller Please complete the following information