Hampton Direct H25-NG1, H25-LP1 Planning Your venting Installation, Optional Components

Page 20

INSTALLATION

RESIDENTIAL AND MANUFACTURED HOMES / MOBILE HOMES

MINIMUM HORIZONTAL TERMINATION INSTALLATIONS

Planning Your venting Installation

See the "Exterior Vent Terminatal Locations" sectionforrequirements.TheH25isapproved for a minimum horizontal termination with the FPI Riser Vent Kit. See the diagram for minimum and maximum pipe lengths.

You will require the following components with your new Hampton® Rear Vent Direct Vent Free- standing Gas Stove. Please review your product to make sure you have everything you need. In the event that you are missing any part, contact your dealer. Decorative brass

or chrome trim kits are available from Simpson Dura-Vent for their wall thimbles, as well as a square wall thimble cover.

When planning your installation, it will be nec-

 

 

 

 

essary to select the proper length of vent pipe

 

 

 

 

for your particular requirements. Determine the

 

 

 

Horizontal

minimum clearance to combustibles from the

 

 

 

 

 

 

Terminal

rear of the unit to the wall. It is also important to

 

 

 

 

 

 

Part# 640-530/P

note the wall thickness. Before cutting the vent

 

 

 

 

 

 

 

hole through the wall ensure that ALL vent and

 

 

 

Vinyl Siding

termination clearances (see the "Exterior Vent

 

 

 

Standoff (Optional)

Terminal locations" section) will be met.

 

 

 

Part #946-205

 

 

 

 

Wall Thimble

*Ifthisisanoutsidecorner,theminimumdistance

 

Decorative

 

(required for

between the vent and the outside corner is 6"

Adapter

Wall Trim

combustible walls)

 

Part # 946-202

(15cm). See "F" on the diagram in the "Exterior

Part #946-219/P

Part #640-545/P

Vent Terminal Locations" section.

(required)

 

 

 

 

Pipe Length (max. 18")

 

 

 

 

 

 

 

 

Part (6-5/8" Dia)

 

 

 

 

(4" Dia.)

 

 

 

Note: Thesearetheminimumpiecesrequired.

 

 

 

Other parts may be required for your

 

 

 

particular installation.

 

 

NOTE: Ensure compliance with the outside vent terminal location before cutting hole as both dimensions must be met.

Minimum components for a Horizontal Installation:

640-944 Horizontal Termination Kit which includes:

1

 

6-5/8" Dia. x 18" Black Pipe

1

 

4" Dia. x 18" Aluminum Vent

1

946-202

Wall Penetration Heat Shield (Wall Thimble) (2 pcs)

1

640-530/P

Riser Vent Terminal

1

640-545/P

Decorative Wall Trim (Black)

1

948-128

Tube Mill-Pac

946-219/P 1

Adapter

Screws

 

Optional Components:

 

946-204

45o Elbow - 6-5/8" Black pipe

 

and 4" Aluminum Vent

946-205

Vinyl Siding Shield for Riser Vent

 

Terminal

 

946-208/P

Vent Guard

 

940

Square Wall Thimble Cover*

981Snorkel Termination (36")*

982Snorkel Termination (14")*

942

Wall Penetration

 

Heat Shield*

* Simpson Dura-Vent components

20

Hampton® H25-1 Direct Vent Freestanding Gas Stove

Image 20
Contents H25 Direct Vent Gas Fireplace To the New Owner Unit DimensionsHampton Table of Contents Safety Label Copy of Safety Label for H25-NG1 & H25-LP1Requirements MA Code CO DetectorInstallation Important MessageInstructions Before YOU StartGeneral Safety Information Installation ChecklistClearances to Combustibles This includesOptional FAN Installation Locating Your GAS StoveManufactured Mobile Home Additional Requirements Fan Kit ContainsInstallation Precautions Vent Restrictor PositionRotating 45O Elbow Remove all 4 screws WashersExterior Vent Terminal Locations Rigid Pipe Venting Components List SV4LB6Rigid Pipe Venting Systems AlternateHorizontal CapsVenting Arrangements Dura-Vent Snorkel TerminationHorizontal Venting with Two 2 90o Elbows + H1 With these options, maxVertical Venting with Two 2 90o Elbows + V1 With these options, max. totalVertical Termination with CO-LINEAR Flex System Straight Vertical TerminationsDescription Alternate Approved CapsDV Stove Horizontal Vent KIT Qty. DescriptionMust be used to ensure that the termination is not Optional Components Planning Your venting InstallationMinimum components for a Horizontal Installation Planning Your Dura-Vent Installation DURA-VENT Termination KITDURA-VENT Venting Dura-Vent Basic Horizontal Kit #Below Grade Snorkel Installation Horizontal TerminationsMinimum components for a Dura-Vent Verti- cal Termination Snorkel TerminationsVertical Terminations Offset Chart Approved for US Installations Only Converting a Factory Built Metal ChimneyAeration Adjustment Cathedral CeilingsHigh Elevation GAS ConnectionClockwise to open Counter-clockwise to close GAS Pipe Pressure TestingValve Description Conversion KIT #434-969 from NG to LP LPG Conversion Kit Contains QtyGlow on logs Installation of the DC Sparker for the H25-1 Unit Only LOG SET Installation Shut off the gas supplyLift off the Cast Top and remove the Glass Front see manual Are fragile, handle with care do not force into positionLogs must be oriented as shown below Remote Control Wall ThermostatOn an interior wall Rear View Decorative Door GrillWiring Diagrams Final CheckFor Propane Units and Units Equipped with DC Spark Boxes Operating Instructions For Your Safety Read Before Lighting Copy of the Lighting Plate InstructionsNormal Operating Sounds GAS Appliances MaintenanceMaintenance Instructions FAN Maintenance LOG ReplacementGlass Replacement Replacement 946-327 GlassInstalling Valve Assembly To remove valve from valve assembly, continueRemoving Valve ScrewsParts List Main AssemblyBurner & LOG Assembly Warranty ConditionsInstaller Please complete the following information