Hampton Direct H25-NG1, H25-LP1 Venting Arrangements, Dura-Vent Snorkel Termination

Page 14

INSTALLATION

 

VENTING ARRANGEMENTS

Horizontal Terminations for

Vertical Terminations Systems for

All Venting Systems

Residential Manufactured and Mobile Homes

The shaded areas in the diagram below show all allowable combinations of vertical runs with hori- zontal terminations. Maximum one 90O elbow (two 45o elbows equal one 90o elbow).

Propane and Natural Gas:

Residential, Manufactured and Mobile

Homes Installations

May be installed in Manufactured (Mobile) Homes

after fi rst sale.

The shaded area in the diagram below shows all allowable combinations of straight vertical and offset to vertical runs with vertical terminations. Maximum two 45o elbows.

If the vent is ENCLOSED in a chase (min. size 9" x 9") maintain a 1-1/4" clearance to combustibles.

May be installed in Manufactured (Mobile) Homes after fi rst sale.

Offset to Vertical Terminations

Venting Arrangements - Horizontal Terminations using Dura-Vent venting system

The two diagrams show all allowable com- binations of straight horizontal termination with one 45o elbow off the unit and Dura- Vent Snorkel or FPI Riser Vent. Restrictor position "A".

Dura-Vent Snorkel Termination

Riser Vent Termination

14

Hampton® H25-1 Direct Vent Freestanding Gas Stove

Image 14
Contents H25 Direct Vent Gas Fireplace To the New Owner Unit DimensionsHampton Table of Contents Safety Label Copy of Safety Label for H25-NG1 & H25-LP1Requirements MA Code CO DetectorInstructions InstallationImportant Message Before YOU StartClearances to Combustibles General Safety InformationInstallation Checklist This includesManufactured Mobile Home Additional Requirements Optional FAN InstallationLocating Your GAS Stove Fan Kit ContainsInstallation Rotating 45O Elbow PrecautionsVent Restrictor Position Remove all 4 screws WashersExterior Vent Terminal Locations Rigid Pipe Venting Components List SV4LB6Horizontal Rigid Pipe Venting SystemsAlternate CapsVenting Arrangements Dura-Vent Snorkel TerminationHorizontal Venting with Two 2 90o Elbows + H1 With these options, maxVertical Venting with Two 2 90o Elbows + V1 With these options, max. totalDescription Vertical Termination with CO-LINEAR Flex SystemStraight Vertical Terminations Alternate Approved CapsDV Stove Horizontal Vent KIT Qty. DescriptionMust be used to ensure that the termination is not Optional Components Planning Your venting InstallationMinimum components for a Horizontal Installation DURA-VENT Venting Planning Your Dura-Vent InstallationDURA-VENT Termination KIT Dura-Vent Basic Horizontal Kit #Minimum components for a Dura-Vent Verti- cal Termination Below Grade Snorkel InstallationHorizontal Terminations Snorkel TerminationsVertical Terminations Offset Chart Approved for US Installations Only Converting a Factory Built Metal ChimneyHigh Elevation Aeration AdjustmentCathedral Ceilings GAS ConnectionClockwise to open Counter-clockwise to close GAS Pipe Pressure TestingValve Description Conversion KIT #434-969 from NG to LP LPG Conversion Kit Contains QtyGlow on logs Installation of the DC Sparker for the H25-1 Unit Only Lift off the Cast Top and remove the Glass Front see manual LOG SET InstallationShut off the gas supply Are fragile, handle with care do not force into positionLogs must be oriented as shown below On an interior wall Remote ControlWall Thermostat Rear View Decorative Door GrillWiring Diagrams Final CheckFor Propane Units and Units Equipped with DC Spark Boxes Operating Instructions For Your Safety Read Before Lighting Copy of the Lighting Plate InstructionsNormal Operating Sounds GAS Appliances MaintenanceMaintenance Instructions Glass Replacement FAN MaintenanceLOG Replacement Replacement 946-327 GlassRemoving Valve Installing Valve AssemblyTo remove valve from valve assembly, continue ScrewsParts List Main AssemblyBurner & LOG Assembly Warranty ConditionsInstaller Please complete the following information