Hampton Direct H25-LP1, H25-NG1 installation manual DURA-VENT Termination KIT, DURA-VENT Venting

Page 21

INSTALLATION

DURA-VENT TERMINATION KIT

Planning Your Dura-Vent

Installation

There are two basic types of Dura-Vent Direct Vent System installations: horizontal termination and vertical termination. Confi rm the maximum horizontalrunandmaximumverticalrisefromthe diagrams in the "Venting Arrangment" section.

When planning your installation, it will be nec- essary to select the proper length of vent pipe for your particular requirements. For horizontal installations, determine the minimum clearance from the rear of the unit to the wall. It is also important to note the wall thickness. (The wall

thimble is suitable for 2 x 4 or 2 x 6 wall construc- tion.) Select the amount of vertical rise desired for "vertical-to-horizontal" type installations.

Warning: Alwaysmaintainrequired clearances (air spaces) to nearby combustibles to prevent a fire hazard. Do not fill air spaces with insulation.

The minimum clearance requirements between the outer wall of the vent pipe and nearby com- bustible surfaces is 1-1/4 inch. Be sure to check the vent termination clearance requirements from decks, windows, soffits, gas regulators, air

supply inlets and public walkways as specifi ed in the "Exterior VentTerminal Locations" section and in your local building codes.

To determine the length of vent pipe required for vertical installations, measure the distance from the unit fl ue outlet to the ceiling, the ceiling thickness, the vertical rise in an attic or second storey, and allow for suffi cient vertical height above the roof line.

For multi-storey applications, fi re stops are required at each fl oor level. If an offset is needed, additional pipe, elbows and supports will be required.

Do not exceed the maximum number of elbows. One 90o for horizontal terminations and two 45o for vertical termination.

DURA-VENT VENTING

Dura-Vent Basic

Horizontal Kit # 970

190o Elbow

1Wall Thimble Cover

1Horiz. Sq. Term. Cap

Alternate Horizontal

Termination Caps

AstroCap

Part# 946-523/P

Alternate

Horizontal

Riser Vent

Terminal

Part# 640-530/P

TheFPIAstroCapTMiscertifiedforinstallationsusingFPIventingsystems as well as Simpson Dura-Vent® and Direct Vent GS.

The FPI AstroCapTM is the proprietary trademark of FPI Fireplace Products International Ltd.

Dura-Vent® and Direct Vent GS are registered and/or proprietary trademarks of Simpson Dura-Vent Co. Inc.

Hampton® H25-1 Direct Vent Freestanding Gas Stove

21

Image 21
Contents H25 Direct Vent Gas Fireplace Unit Dimensions HamptonTo the New Owner Table of Contents Copy of Safety Label for H25-NG1 & H25-LP1 Safety LabelMA Code CO Detector RequirementsImportant Message InstallationInstructions Before YOU StartInstallation Checklist General Safety InformationClearances to Combustibles This includesLocating Your GAS Stove Optional FAN InstallationManufactured Mobile Home Additional Requirements Fan Kit ContainsInstallation Vent Restrictor Position PrecautionsRotating 45O Elbow Remove all 4 screws WashersExterior Vent Terminal Locations SV4LB6 Rigid Pipe Venting Components ListAlternate Rigid Pipe Venting SystemsHorizontal CapsDura-Vent Snorkel Termination Venting Arrangements+ H1 With these options, max Horizontal Venting with Two 2 90o Elbows+ V1 With these options, max. total Vertical Venting with Two 2 90o ElbowsStraight Vertical Terminations Vertical Termination with CO-LINEAR Flex SystemDescription Alternate Approved CapsQty. Description DV Stove Horizontal Vent KITMust be used to ensure that the termination is not Planning Your venting Installation Minimum components for a Horizontal InstallationOptional Components DURA-VENT Termination KIT Planning Your Dura-Vent InstallationDURA-VENT Venting Dura-Vent Basic Horizontal Kit #Horizontal Terminations Below Grade Snorkel InstallationMinimum components for a Dura-Vent Verti- cal Termination Snorkel TerminationsVertical Terminations Offset Chart Converting a Factory Built Metal Chimney Approved for US Installations OnlyCathedral Ceilings Aeration AdjustmentHigh Elevation GAS ConnectionGAS Pipe Pressure Testing Valve DescriptionClockwise to open Counter-clockwise to close LPG Conversion Kit Contains Qty Conversion KIT #434-969 from NG to LPGlow on logs Installation of the DC Sparker for the H25-1 Unit Only Shut off the gas supply LOG SET InstallationLift off the Cast Top and remove the Glass Front see manual Are fragile, handle with care do not force into positionLogs must be oriented as shown below Wall Thermostat Remote ControlOn an interior wall Rear View Decorative Door GrillFinal Check Wiring DiagramsFor Propane Units and Units Equipped with DC Spark Boxes Operating Instructions Copy of the Lighting Plate Instructions For Your Safety Read Before LightingMaintenance Maintenance InstructionsNormal Operating Sounds GAS Appliances LOG Replacement FAN MaintenanceGlass Replacement Replacement 946-327 GlassTo remove valve from valve assembly, continue Installing Valve AssemblyRemoving Valve ScrewsMain Assembly Parts ListBurner & LOG Assembly Conditions WarrantyInstaller Please complete the following information