Hampton Direct H25-NG1, H25-LP1 installation manual Logs must be oriented as shown below

Page 32

INSTALLATION

6)Take the embers and place on the burner in the space between the 2 front logs. Do not put embers on the burner in the area between the front logs and the rear log. See photo below.

A)

B)

C)

7)Place the center cross log on the locating pin in the top of the rear log and position as shown below.

Logs must be oriented as shown below.

D)

A)

B)

C)

8)Test fi re to ensure proper light off (make sure fl ame fl ows smoothly from one end of burner to the other). If there is any fl ame hesitation, check that area for any blockage of the burner ports.

9)Re-install the Glass Front and Cast Top.

 

A)

B)

D)

C)

 

32

Hampton® H25-1 Direct Vent Freestanding Gas Stove

Image 32
Contents H25 Direct Vent Gas Fireplace To the New Owner Unit DimensionsHampton Table of Contents Safety Label Copy of Safety Label for H25-NG1 & H25-LP1Requirements MA Code CO DetectorInstallation Important MessageInstructions Before YOU StartGeneral Safety Information Installation ChecklistClearances to Combustibles This includesOptional FAN Installation Locating Your GAS StoveManufactured Mobile Home Additional Requirements Fan Kit ContainsInstallation Precautions Vent Restrictor PositionRotating 45O Elbow Remove all 4 screws WashersExterior Vent Terminal Locations Rigid Pipe Venting Components List SV4LB6Rigid Pipe Venting Systems AlternateHorizontal CapsVenting Arrangements Dura-Vent Snorkel TerminationHorizontal Venting with Two 2 90o Elbows + H1 With these options, maxVertical Venting with Two 2 90o Elbows + V1 With these options, max. totalVertical Termination with CO-LINEAR Flex System Straight Vertical TerminationsDescription Alternate Approved CapsDV Stove Horizontal Vent KIT Qty. DescriptionMust be used to ensure that the termination is not Optional Components Planning Your venting InstallationMinimum components for a Horizontal Installation Planning Your Dura-Vent Installation DURA-VENT Termination KITDURA-VENT Venting Dura-Vent Basic Horizontal Kit #Below Grade Snorkel Installation Horizontal TerminationsMinimum components for a Dura-Vent Verti- cal Termination Snorkel TerminationsVertical Terminations Offset Chart Approved for US Installations Only Converting a Factory Built Metal ChimneyAeration Adjustment Cathedral CeilingsHigh Elevation GAS ConnectionClockwise to open Counter-clockwise to close GAS Pipe Pressure TestingValve Description Conversion KIT #434-969 from NG to LP LPG Conversion Kit Contains QtyGlow on logs Installation of the DC Sparker for the H25-1 Unit Only LOG SET Installation Shut off the gas supplyLift off the Cast Top and remove the Glass Front see manual Are fragile, handle with care do not force into positionLogs must be oriented as shown below Remote Control Wall ThermostatOn an interior wall Rear View Decorative Door GrillWiring Diagrams Final CheckFor Propane Units and Units Equipped with DC Spark Boxes Operating Instructions For Your Safety Read Before Lighting Copy of the Lighting Plate InstructionsNormal Operating Sounds GAS Appliances MaintenanceMaintenance Instructions FAN Maintenance LOG ReplacementGlass Replacement Replacement 946-327 GlassInstalling Valve Assembly To remove valve from valve assembly, continueRemoving Valve ScrewsParts List Main AssemblyBurner & LOG Assembly Warranty ConditionsInstaller Please complete the following information