Regency U32-NG4, U32-LP4 installation manual Installation of the DC Sparker

Page 15

INSTALLATION

9)

Reinstall new burner orifice LPG

16) Verify that if the conversion is from

 

stamped #52 and tighten.

NG to LPG, the screw must be re-

10)

 

assembled with the red o-ring visible

Turn control knob to the “OFF” position.

(Fig. 5).

Installation of the DC Sparker:

21)Locate the Piezo Ignitor situated at the side of valve.

11)Remove the black protection cap by hand from the hi-low knob (Fig.1).

Fig. 1

Red o-ring visible

Fig.5

LPG Configuration

Piezo Ignitor

12)Insert a 5/32” or 4mm Allen wrench into the hexagonal key-way of the screw (Fig.

2), rotate it counter- clockwise until it is free and extract it.

Fig.2

13)Check that the screw is clean and if necessary remove dirt.

14)Flip the screw (Fig. 3).

Fig.3

15) Using the Allen wrench as shown in Fig.4, rotate the screw clockwise until snug, do not overtighten.

Fig.4

17)Re-assemble the black protection cap (Fig. 6).

Fig. 6

18)Reverse step 2).

WARNING!

Also check that the pilot and main burner injectors are appropriate for the gas type.

19)Attach the label "This unit has been converted to LPG" near or on top of the serial # decal.

20)Replace yellow "NG" label with red "LPG" label.

22)Remove the Piezo Ignitor by unscrewing the nut at the back of the mounting bracket.

Ignitor

Wire

Piezo

Ignitor

23)Disconnect the ignitor wire from the Piezo Ignitor and connect it to the DC Sparker.

DC

Sparker

Ignitor

Wire

24)Install the 3/4" nylon plug to cover up the hole on the mounting bracket.

WARNING!

Do not over tighten the screw. Recommended to

grip the wrench by the short side.

U32-4 FPI Direct Vent Gas Insert

15

Image 15
Contents U32 Gas Insert To the NEW Owner FPI GAS InsertTable of Contents Safety Label MA Code CO Detector RequirementsInstallation Materials Required Installation ChecklistMinimum Fireplace Dimensions Manufactured Mobile Home Additional RequirementsFlue Liner Installation VentingGAS Connection Natural Gas Propane GAS Pipe Pressure TestingGAS Insert Aeration System Optional Brick PanelGas log kit contains the following LOG SET InstallationRear burner Regency Faceplate Trim InstallationFlush Louvers Optional Double Screen DoorsStandard Flush Door Optional Flush TrimRemoving Bay Door BAY LouversOptional BAY Door Optional BAY TrimFor P36D-1 / P36-4 Only Conversion KIT #514-969 from NG to LPInstallation of the DC Sparker Ground Wire from Kit Full Screen Doors Hinge Ensure that Top and sides are Aligned Hampton Cast Faceplate InstallationU31 only Hampton Cast Grill InstallationLeft Side Kensington Front InstallationGlass Door Sub-Frame Hook Kensington Panel Door InstallationOptional Wall Thermostat Optional Remote ControlThermostat Wire Table KensingtonElectrical Grounding Instructions Wiring DiagramsFor Propane Units and Units Equipped with DC Spark Boxes Operating Instructions Copy of Lighting Instruction Plate Maintenance InstructionsMaintenance Bay Glass Removal FAN MaintenanceShut off the gas supply Valve ReplacementEntrire assembly out Install a new gasket and reinstall the valve assemblyMain Assembly Parts ListBurner Assembly & LOG SET Flush Door Bay DoorFaceplate Assembly 400-917402-918 Complete Faceplate Set 187 189 188 194 203 201 207 195 205 Hampton Cast Faceplate AssemblyU32-4 FPI Direct Vent Gas Insert U32-4 FPI Direct Vent Gas Insert U32-4 FPI Direct Vent Gas Insert Warranty Limited Lifetime WarrantyInstaller Please complete the following information