INSTALLATION
9)Connect the 2nd liner to the exhaust collar marked with an "E", seal connection with high temperature silicone. Secure with gear clamp.
NOTES:
1)Final gas connection should be made after unit is in place to avoid damage to line when pushing the unit into position.
2)
1)Make sure the valve is in the "OFF" position.
2)Loosen the "IN" and/or "OUT" pressure tap(s), turning counterclockwise with a 1/8" wide fl at screwdriver.
3)Attach manometer to "IN" and/or "OUT" pressure tap(s) using a 5/16" ID hose.
4)Light the pilot and turn the valve to "ON" position.
5)The pressure check should be carried out with the unit burning and the setting should be within the limits specifi ed on the safety label.
6)When fi nished reading manometer, turn off the gas valve, disconnect the hose and tighten the screw (clockwise) with a 1/8" fl at screwdriver. Note: Screw should be snug, but do not over tighten.
GAS INSERT
AERATION SYSTEM
The air shutter can be adjusted by moving the adjusting wire up or down. The wire is accessed through the bottom louver opening. Open the air shutter for a blue fl ame or close for a yellower
flame. The burner aeration is factory set but may need adjusting due to either the local gas supply or altitude.
Minimum Air Shutter Opening:
3/16" Natural Gas
1/4" Propane
OPTIONAL
BRICK PANEL
1)Unwrap the brick pattern panels from the protective wrapping.
2)Remove the glass front if it is already installed, see "Standard Flush Door" section.
3)Put the rear brick panel fl at against the back of the unit.
4)Beforeinstallingthesidebrickpanels,loosen the screws for the brick tabs enough so that you can slide the brick tabs on to the screws easily but that the tabs are secure. For the location of the side brick tab screws see diagram 1.
GAS PIPE
PRESSURE TESTING
The appliance must be isolated from the gas supply piping system by closing its individual manual
Themanifoldpressureiscontrolledbyaregulator built into the gas control, and should be checked at the pressure test point.
Note: To properly check gas pressure, both inlet and manifold pressures should be checked using the valve pressure ports on the valve.
Aeration Adjustment Wire
PULL= Open
PUSH = Close
CAUTION: Carbon will be produced if air shutter is closed too much.
Note:anydamageduetocarboningresulting fromimproperlysettingtheaerationcontrols is NOT covered under warranty.
Note: Aeration Adjustment should only be performed by an authorized FPI Installer at the time of installation or service.
Diagram 1
5)Remove the brick tabs and slide the side brick panels into position. See diagram 1. Install the brick tabs. See diagram 2.
Diagram 2
9 |