Regency U32-LP4, U32-NG4 Kensington Panel Door Installation, Glass Door Sub-Frame Hook

Page 22

INSTALLATION

THE KENSINGTON®

2-PANEL DOOR INSTALLATION

1)Install the Sub-Frame by hooking the top fl ange onto the top of the Glass Door and swing the Sub-Frame towards the unit. Pull out the hooks which already secure the Glass Door and place them thru the holes in the bottom of the Sub-Frame to secure both the Glass Door and Sub-Frame in place together.

3)Hook the Left Side Screen Door to the Door Frame by placing the door hinges (top & bottom) over the pins on the Door Frame. Repeat for Right Side Screen Door.

Note: It will be easier to put the Screen Door in place by starting with the bottom hinge.

Glass Door

Sub-Frame

Sub-Frame

Hook

2)Mount the 2-panel Door Frame to the fl ange on Sub-Frame, ensuring to line up holes. Secure using the 6 screws provided.

Left Side Door

Pin on Door Frame

Note: If you fi nd that the Left or Right Side Screen Door is lower then the other, use the spacer provided to help align the Doors.

The spacer is to be placed over the bottom pin before installing the Screen Door.

Spacer

22

U32-4 FPI Direct Vent Gas Insert

Image 22
Contents U32 Gas Insert FPI GAS Insert To the NEW OwnerTable of Contents Safety Label Requirements MA Code CO DetectorInstallation Manufactured Mobile Home Additional Requirements Installation ChecklistMinimum Fireplace Dimensions Materials RequiredVenting Flue Liner InstallationGAS Connection Optional Brick Panel GAS Pipe Pressure TestingGAS Insert Aeration System Natural Gas PropaneLOG SET Installation Gas log kit contains the followingRegency Faceplate Trim Installation Rear burnerOptional Flush Trim Optional Double Screen DoorsStandard Flush Door Flush LouversOptional BAY Trim BAY LouversOptional BAY Door Removing Bay DoorConversion KIT #514-969 from NG to LP For P36D-1 / P36-4 OnlyInstallation of the DC Sparker Ground Wire from Kit Full Screen Doors Hinge Hampton Cast Faceplate Installation Ensure that Top and sides are AlignedHampton Cast Grill Installation U31 onlyKensington Front Installation Left SideKensington Panel Door Installation Glass Door Sub-Frame HookKensington Optional Remote ControlThermostat Wire Table Optional Wall ThermostatWiring Diagrams Electrical Grounding InstructionsFor Propane Units and Units Equipped with DC Spark Boxes Operating Instructions Maintenance Instructions Copy of Lighting Instruction PlateMaintenance FAN Maintenance Bay Glass RemovalInstall a new gasket and reinstall the valve assembly Valve ReplacementEntrire assembly out Shut off the gas supplyParts List Main AssemblyBurner Assembly & LOG SET Bay Door Flush Door400-917 Faceplate Assembly402-918 Complete Faceplate Set Hampton Cast Faceplate Assembly 187 189 188 194 203 201 207 195 205U32-4 FPI Direct Vent Gas Insert U32-4 FPI Direct Vent Gas Insert U32-4 FPI Direct Vent Gas Insert Warranty Warranty Limited LifetimeInstaller Please complete the following information