Lopi Yankee Bay Pellet Insert manual 4Installation, Surround Panel & Circuit Board Installation

Page 14

1 4Installation

Surround Panel & Circuit Board Installation

N O T E : Attach the vent prior to installing the surround panels (& circuit board).

a

NOTE: When in place, the panels maintain a 3/8” gap around the fireplace.

e

Attach the surround panels to the insert by sliding the slots

on each panel over the tabs on the side of the insert.

Slot

Tab

Phillips

Screwdriver

Remove the circuit board from the rear hopper support. Disconnect the wiring harness from the circuit board (see step “d” below for a detailed view).

 

b

 

Bend these block-

 

off plates as

 

shown (both

 

sides). When in

Back of

position, they

Side Panel

block the view

 

through the slots.

 

in the surround

 

panels.

c

Attach the circuit board

with the four screws

shipped with the insert.

Phillips

Screwdriver

Right Side

Surround

Panel

Run the power cord to the side along the front of the fireplace behind the side panel (do not route it under the insert).

Install the top panel so the joggle clips slide over f the tabs on top of the side panels and insert.

Tighten the set screws from the back side with a small standard screwdriver

Top Trim

Place the right side surround panel near d the insert and attach the wiring harness

to the circuit board.

Back Side of

Circuit Board

Pinch these tabs to remove the wiring harness.

If using a thermostat, attach the thermostat wires at this time.

Double-Back Tape

Wiring Harness (disconnected in step “a”)

"L" Bracket

Top Panel

Right Side Trim

Optional Trim Installation:

Insert one leg of each "L" bracket into the top and side trim piece. Align the trim to form a precise corner, then tighten the two set screws with a small standard screwdriver. Slide the trim over the panels. Attach the double- back tape between the trim and panels at the bottom corners. This keeps the trim tight against the panel and prevents rattles.

Travis Industries

4 0 5 0 5 0 9

1 0 0 - 0 1 1 4 5

Image 14 Contents
Yankee Bay Pellet Insert Travis Industries 5 0 5 0 0 0 1 1 4 2IntroductionIntroduction Important Information Table of Contents 4Safety Precautions Safety Precautions Mobile Home6Specifications Installation7 8Installation Hopper Extension Set-upInstallation9 Re-install the hopper walls following the directions below 0Installation Installation1 Venting the Pellet StoveOutside Air used for combustion 2InstallationMobile Home Requirements Not Enough Air Baffle InstallationRestrictor Adjustment Too Much Air4Installation Surround Panel & Circuit Board InstallationInstallation into a Masonry Fireplace Hint6Installation Installation into a Factory Built MetalLocation of Controls Safety NoticeOperation1 Starting the Heater for the First TimeTwo Modes of Operation 8OperationLoading Pellets To Start Manual ModeTo Adjust the Heat To Shut Down0Operation Auto ModeTo Adjust Room Temperature or Start the Stove Adjusting the Fan Speed Operation22Operation Inspect the Burn Maintenance2Daily Maintenance whenever using the heater Make Sure Pellets are Not Piling UpCheck Firepot for Clinkers 4MaintenanceCleaning the Firepot Cleaning the Optional Plated Surfaces Bi-Weekly Maintenance or every 10 bags of pelletsClean the Heat Exchange Tubes Vacuum Hopper6Maintenance Opening The DoorClean the Glass Check Baffles, Ashbox, Ashpan, Dispose Ash If Necessary8Maintenance Sweep Ash Into AshpanYearly Maintenance or every two tons 0Maintenance Clean the Vent make sure the heater and vent is coolDoor Alignment Maintenance3Door Seal 2Maintenance Adjusting the Door Hinge and LatchReplacement Parts Check for Air Leaks Around the Door, Glass, and Ashpan4Normal Operating Sounds Safety Label Serial NoLimited 7 Year Warranty Years 1 & 2 Coverage Parts & LaborOptional Equipment ThermostatOptional Log 8Optional EquipmentRemote Thermostat ZC Kit 9 9 2 0 0 1 4 0Index