Lopi Yankee Bay Pellet Insert manual 2Installation, Mobile Home Requirements

Page 12

1 2Installation

Mobile Home Requirements

Outside air is required (used for combustion) - see the directions below.

WARNING: DO NOT INSTALL IN SLEEPING ROOM.

CAUTION: THE STRUCTURAL INTEGRITY OF THE MANUFACTURED HOME FLOOR, WALL, AND CEILING/ROOF MUST BE MAINTAINED.

Outside Air (used for combustion)

Outside air is optional (except in mobile homes or when required by local building codes).

Must not be drawn from an enclosed space (garage, unventilated crawl space).

Must not be over 15' long.

Must be made with 1 3/4" diameter or larger metal or aluminum duct with a metal screen attached to the end to keep out rodents (P.V.C. or other combustible materials may not be used). Use the Travis Industries Outside Air Kit (part # 99200136).

Must not terminate above or within 1' of the chimney termination.

Must have a rain cap or down-turned elbow to prevent water from entering.

Must be located so that it will not become plugged by snow or other material.

12” Min.

Vent Termination

 

Outside air may be drawn through the chimney (15’ maximum length).

 

Outside air may be drawn

 

 

 

from the ash cleanout.

 

 

Travis

Industries

4 0 5 0 5 0 9

1 0 0 - 0 1 1 4 5

Image 12 Contents
Yankee Bay Pellet Insert 2Introduction Introduction Important InformationTravis Industries 5 0 5 0 0 0 1 1 4 Table of Contents 4Safety Precautions Safety Precautions Mobile Home6Specifications Installation7 8Installation Hopper Extension Set-upInstallation9 Re-install the hopper walls following the directions below0Installation Installation1 Venting the Pellet Stove2Installation Mobile Home RequirementsOutside Air used for combustion Baffle Installation Restrictor AdjustmentNot Enough Air Too Much Air4Installation Surround Panel & Circuit Board InstallationInstallation into a Masonry Fireplace Hint6Installation Installation into a Factory Built MetalSafety Notice Operation1Location of Controls Starting the Heater for the First Time8Operation Loading PelletsTwo Modes of Operation Manual Mode To Adjust the HeatTo Start To Shut DownAuto Mode To Adjust Room Temperature or Start the Stove0Operation Adjusting the Fan Speed Operation22Operation Maintenance2 Daily Maintenance whenever using the heaterInspect the Burn Make Sure Pellets are Not Piling Up4Maintenance Cleaning the FirepotCheck Firepot for Clinkers Bi-Weekly Maintenance or every 10 bags of pellets Clean the Heat Exchange TubesCleaning the Optional Plated Surfaces Vacuum Hopper6Maintenance Opening The DoorClean the Glass Check Baffles, Ashbox, Ashpan, Dispose Ash If Necessary8Maintenance Sweep Ash Into AshpanYearly Maintenance or every two tons 0Maintenance Clean the Vent make sure the heater and vent is coolMaintenance3 Door SealDoor Alignment 2Maintenance Adjusting the Door Hinge and LatchReplacement Parts Check for Air Leaks Around the Door, Glass, and Ashpan4Normal Operating Sounds Safety Label Serial NoLimited 7 Year Warranty Years 1 & 2 Coverage Parts & LaborOptional Equipment Thermostat8Optional Equipment Remote ThermostatOptional Log ZC Kit 9 9 2 0 0 1 4 0Index