Lopi Yankee Bay Pellet Insert manual 8Operation, Loading Pellets, Two Modes of Operation

Page 18

1 8Operation

Loading Pellets

Lift the hopper lid to its vertical position. Pour pellets into the hopper until full. NOTE: The hopper holds approximately 48 to 88 pounds of pellets (depending upon hopper set-up).

The front edge of the hopper lid becomes very hot, do not touch the area below the handle.

 

 

e

 

ll

e

 

P

 

 

t

s

Make sure pellets are not left on this heat shield.

The Two Modes of Operation:

Manual

Manual mode requires the user to turn the heater on and off manually.

Auto (requires a thermostat)

Auto mode allows you to use a thermostat to control room temperature. The stove automatically turns on when the temperature drops below the thermostat setting. Once the stove reaches operating temperature, the stove then runs at the heat output setting selected.

Switching Modes While in Operation

Whenever the stove is switched from one mode to another while in operation, the stove will enter the "start- up" sequence for a minimum of 20 minutes.

DISCONNECT POWER BEFORE SERVICE

H

 

 

E

HIGH

REMOTE

A

AUTO

T

 

 

 

O

MED

MANUAL

 

U

 

 

T

 

AUGER

P

LOW

 

U

 

FAULT

T

 

 

 

 

AUTO

H

UP

OFF

EMANUAL

A

T DOWN MANUAL

UP START

F

AMANUAL

N

DOWN

AUGER

TM

TRAVIS INDUSTRIES

HOUSE OF FIRE

NOTE: if using a modulating remote, this light will come on to indicate the remote is controlling the heater.

These indicator lights are used to determine which mode you are in.

Use the mode switch to determine the mode.

Travis Industries

4 0 5 0 5 0 9

1 0 0 - 0 1 1 4 5

Image 18 Contents
Yankee Bay Pellet Insert 2Introduction Introduction Important InformationTravis Industries 5 0 5 0 0 0 1 1 4 Table of Contents 4Safety Precautions Safety Precautions Mobile Home6Specifications Installation7 8Installation Hopper Extension Set-upInstallation9 Re-install the hopper walls following the directions below0Installation Installation1 Venting the Pellet Stove2Installation Mobile Home RequirementsOutside Air used for combustion Not Enough Air Baffle InstallationRestrictor Adjustment Too Much Air 4Installation Surround Panel & Circuit Board InstallationInstallation into a Masonry Fireplace Hint6Installation Installation into a Factory Built MetalLocation of Controls Safety NoticeOperation1 Starting the Heater for the First Time8Operation Loading PelletsTwo Modes of Operation To Start Manual ModeTo Adjust the Heat To Shut DownAuto Mode To Adjust Room Temperature or Start the Stove0Operation Adjusting the Fan Speed Operation22Operation Inspect the Burn Maintenance2Daily Maintenance whenever using the heater Make Sure Pellets are Not Piling Up4Maintenance Cleaning the FirepotCheck Firepot for Clinkers Cleaning the Optional Plated Surfaces Bi-Weekly Maintenance or every 10 bags of pelletsClean the Heat Exchange Tubes Vacuum Hopper6Maintenance Opening The DoorClean the Glass Check Baffles, Ashbox, Ashpan, Dispose Ash If Necessary8Maintenance Sweep Ash Into AshpanYearly Maintenance or every two tons 0Maintenance Clean the Vent make sure the heater and vent is coolMaintenance3 Door SealDoor Alignment 2Maintenance Adjusting the Door Hinge and LatchReplacement Parts Check for Air Leaks Around the Door, Glass, and Ashpan4Normal Operating Sounds Safety Label Serial NoLimited 7 Year Warranty Years 1 & 2 Coverage Parts & LaborOptional Equipment Thermostat8Optional Equipment Remote ThermostatOptional Log ZC Kit 9 9 2 0 0 1 4 0Index