Lopi Yankee Bay Pellet Insert manual

Page 1

• Masonry Fireplace

• Factory Built (Metal)

Fireplace

• Mobile Home Approved

Tested and Listed by

Omni-Test Laboratories, Inc.

Beaverton, Oregon

Report # 028–S–51-2

ASTME-1509 1995, ULCC 1482

Yankee Bay Pellet Insert

-- Please read this entire manual before installation and use of this pellet fuel-burning room heater. Failure to follow these instructions could result in property damage bodily injury or even death.

-- Contact local building or fire officials about restrictions and installation inspection requirements in your area.

-- Save these instructions

Installer: After installation give this manual to the home-

 

owner and explain operation of this stove.

$10.00

Copyright 2007, T.I.

Part # 100-01145

 

4051228

 

4800 Harbour Pointe Blvd. SW

Mukilteo, WA 98275

Image 1 Contents
Yankee Bay Pellet Insert Introduction Important Information 2IntroductionTravis Industries 5 0 5 0 0 0 1 1 4 Table of Contents 4Safety Precautions Mobile Home Safety Precautions6Specifications Installation7 Hopper Extension Set-up 8InstallationRe-install the hopper walls following the directions below Installation90Installation Venting the Pellet Stove Installation1Mobile Home Requirements 2InstallationOutside Air used for combustion Restrictor Adjustment Baffle InstallationNot Enough Air Too Much AirSurround Panel & Circuit Board Installation 4InstallationHint Installation into a Masonry FireplaceInstallation into a Factory Built Metal 6InstallationOperation1 Safety NoticeLocation of Controls Starting the Heater for the First TimeLoading Pellets 8OperationTwo Modes of Operation To Adjust the Heat Manual ModeTo Start To Shut DownTo Adjust Room Temperature or Start the Stove Auto Mode0Operation Operation2 Adjusting the Fan Speed2Operation Daily Maintenance whenever using the heater Maintenance2Inspect the Burn Make Sure Pellets are Not Piling UpCleaning the Firepot 4MaintenanceCheck Firepot for Clinkers Clean the Heat Exchange Tubes Bi-Weekly Maintenance or every 10 bags of pelletsCleaning the Optional Plated Surfaces Vacuum HopperOpening The Door 6MaintenanceCheck Baffles, Ashbox, Ashpan, Dispose Ash If Necessary Clean the GlassSweep Ash Into Ashpan 8MaintenanceYearly Maintenance or every two tons Clean the Vent make sure the heater and vent is cool 0MaintenanceDoor Seal Maintenance3Door Alignment Adjusting the Door Hinge and Latch 2MaintenanceCheck for Air Leaks Around the Door, Glass, and Ashpan Replacement Parts4Normal Operating Sounds Serial No Safety LabelYears 1 & 2 Coverage Parts & Labor Limited 7 Year WarrantyThermostat Optional EquipmentRemote Thermostat 8Optional EquipmentOptional Log ZC Kit 9 9 2 0 0 1 4 0Index