Pressure test boiler before attaching water or gas piping (except as noted below) or electrical supply.

Prepare boiler for test

1.Remove the shipping nipple (from CGs supply tap- ping) and remove the boiler relief valve. Temporarily plug the relief valve tapping with a ¾” NPT pipe plug.

2.Remove 1¼” nipple, reducing tee and drain valve from circulator hardware and pressure/temperature gauge carton. Install in boiler return connection as shown on page 3 and Figure 29, page 58. Install circulator on either the return or supply.

3.Remove 1¼” nipple, 1¼” x 1¼” x ½” tee and pres- sure/temperature gauge from circulator hardware and pressure/temperature gauge carton. Pipe to boiler supply connection as shown on page 3 and Figure 29, page 58. (Use pipe dope sparingly.)

4.Connect a hose to boiler drain valve, the other end connected to a fresh water supply. Make sure hose can also be used to drain boiler after test.

5.Connect a nipple and shutoff valve to system supply connection on the 1¼” tee. This valve will be used to bleed air during the fill. (Valve and nipple are not included with boiler.)

6.Connect a nipple and shutoff valve to system re- turn connection (at circulator flange if circulator installed on return). This valve will be used to bleed air during the fill. (Valve and nipple are not included with boiler.)

Fill and pressure test

1.Open the shutoff valves you installed on supply and return connections.

2.Slowly open boiler drain valve and fresh water sup- ply to fill boiler with water.

3.When water flows from shutoff valves, close boiler drain valve.

4.Close shutoff valves.

5.Slowly reopen boiler drain valve until test pressure on the pressure/temperature gauge reaches no more than:

45 psig for boilers with 30 psig relief valve.

75 psig for boilers with 50 psig relief valve.

6.Test for no more than 10 minutes at:

45 psig for boilers with 30 psig relief valve.

75 psig for boilers with 50 psig relief valve.

Do not leave boiler unattended.

A cold water fill could expand and cause excessive pressure, resulting in severe personal injury, death or substantial property damage.

7.Make sure constant gauge pressure has been main- tained throughout test. Check for leaks. Repair if found.

Leaks must be repaired at once.

Failure to do so can damage boiler, resulting in substantial property damage.

Do not use petroleum-based clean- ing or sealing compounds in boiler system. Severe damage to boiler will occur, resulting in substantial property damage.

Drain and remove fittings

1.Disconnect fill water hose from water source.

2.Drain boiler at drain valve or out hose, whichever provides best access to drain. Remove hose after draining if used to drain boiler.

3.Remove nipples and valves unless they will remain for use in the system piping.

4.Remove plug from relief valve tapping. See page 14 to replace relief valve.

Part number 550-110-260/0107

13

Image 13
Contents Gold CGs How it works Gold CGs Gas-Fired Induced-Draft Water Boiler Contents Please read before proceeding InstallerUser Installations must follow these codes 1a Prepare boiler location codes & checklistBefore locating the boiler, check the following 1b Prepare boiler location clearances 1c Prepare boiler location vent system When removing boiler from an existing common vent systemCGs special vent system Vent systemProducts to avoid 1d Prepare boiler location contaminationCombustion air options 1e Prepare boiler location air openingsSpecial considerations Sizing air openingsSizing air openings for CGs installations Orifice replacement procedure 2a Prepare boiler placement & setupPlace boiler/crate near position Inspect orifices and burnersHydrostatic pressure test 2b Prepare boiler pressure testDrain and remove fittings Prepare boiler for test3a Water piping general information 3b Water piping single-zone system Piping multiple zones Piping for radiant heating 3c Water piping multiple zonesSystems or converted gravity SystemsReturn water 130F or higher Valve adjustment Figures 8 and 9 only Temperature gauges3d Piping low temp systems Primary/secondary preferred bypass piping methodPrimary/secondary piping BOILER-bypass piping method Valve adjustmentFigures 8 SYSTEM-bypass piping method Prevent chilled water from entering 3e Water piping refrigeration systemsVenting and combustion air Gas piping Connecting gas supply piping to boilerNatural Gas Propane GasElectrical installation must comply with Field wiringWiring connections Thermostat7a Start-up preparation Freeze protection when usedCheck for gas leaks Verify water chemistryInspect system water piping Inspect base insulation 7b Start-up operate boilerFinal check before starting boiler Start the boilerCheck burner flames 7c Start-up if boiler doesn’t startCheck for Pilot burner flame FigureInstallation and service certificate Check-out procedure checklist9a Operation sequence Schematic wiring diagram 9b Operation wiring diagramsLadder wiring diagram 9c Operating instructions CGs-3 to CGs-6 9c Operating instructions CGs-3 to CGs-6 9c Operating instructions CGs-3 to CGi-6 Verify Proper Operation After Servicing 10a Service and maintenance schedule10b Service & maintenance annual start-up Condensate drain system Burners, base and inlet air boxInducer motor Oiled-bearing circulators10b Service & maint. annual start-up Relief valve, typical Boiler relief valveReview with owner Cleaning boiler heating surfacesBefore troubleshooting 11a Troubleshooting procedureCheck the following Air pressure switch 11b Troubleshooting air pressure switchCheck pressure switch setting Troubleshooting air pressure readingControl indicator lights Lockout modes 11c Troubleshooting control moduleControl indicator lights NON-LOCKOUT modes Troubleshooting the control moduleControl module connections Chart 1 Troubleshooting Power light status 11d Troubleshooting control module lightsChart 2 Tstat Circ & Power lights flashing Chart 3 Press Switch & Power lights flashing Chart 4 Flame & Power lights flashing Item 8 , Does blower motor operate? Verify Sequence of operation, , Section assembly Base Jacket Trim Controls 12a Replacement partsSection assembly 12b Replacement parts section assemblyBase assembly 12c Replacement parts baseDescription Weil-McLain Part number Jacket assembly 12d Replacement parts jacketBoiler Model Weil-McLain part number Part number 12e Replacement parts trimPropane gas components 12f Replacement parts controlsDimensional drawing 13a DimensionsDOE 13b RatingsRemoval of Combustion Chamber Lining or Base Panels Handling ceramic fiber and fiberglass materials