Weil-McLain 550-110-260/0107 manual 13b Ratings, Doe

Page 63

GOLD CGs Gas-Fired Water Boiler — Boiler Manual

13b Ratings

 

 

 

 

 

 

 

 

DOE

 

 

 

 

 

 

 

 

 

 

 

 

(Note 5)

 

 

 

 

 

 

 

 

 

 

 

Table 7  Boiler ratings

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Boiler

 

DOE

0-2,000 feet

2,000-4,500 feet

Net

Boiler

 

DOE

Vent

model

Heating

 

 

 

 

I=B=R

water

 

Seasonal

size

Input

Output

Input

Output

 

number

capacity

ratings

content

 

efficiency

 

 

 

(Btuh)

(Btuh)

(Btuh)

(Btuh)

(Btuh)

(Btuh)

(gallons)

 

(% AFUE)

 

 

 

 

 

 

 

 

 

 

 

 

 

(Note 1)

 

(Note 2)

 

 

 

 

(Note 3)

 

 

(Note 5)

(Note 4)

 

 

 

 

 

 

 

 

 

 

 

 

CGs-3

 

57,000

67,000

57,300

60,300

51,600

50,000

1.5

 

85.3

3"

(Note 5)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CGs-4

 

85,000

100,000

85,000

90,000

76,500

74,000

2.1

 

84.6

3"

 

 

 

 

 

 

 

 

 

 

 

 

CGs-5

 

112,000

133,000

112,400

119,000

100,600

97,000

2.7

 

84.0

3"

 

 

 

 

 

 

 

 

 

 

 

 

CGs-6

 

140,000

167,000

140,300

150,300

126,300

122,000

3.3

 

83.4

3"

 

 

 

 

 

 

 

 

 

 

 

 

 

1.

Add “PIN” for natural gas boiler - “PIL” for propane gas boiler.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2.

Based on standard test procedures prescribed by the United States Department of Energy.

 

 

 

 

 

 

 

 

 

 

 

 

 

3.

Net I=B=R ratings are based on net installed radiation of sufficient quantity for the requirements of the building

 

 

and nothing need be added for normal piping and pickup. Ratings are based on a piping and pickup allowance

Notes

 

of 1.15. An additional allowance should be made for unusual piping and pickup loads.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

4.

CGs boilers require special venting, consistent with Category III or IV boiler. Use only the vent materials and

 

 

methods specified in CGs vent supplements. CGs boilers may be direct-vented (using 3” diameter air piping)

 

 

as specified in the direct vent supplements.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

5.

As an Energy Star Partner, Weil-McLain has determined that the CGs-3 meets the Energy Star guidelines for

 

 

energy efficiency.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CGs boilers for residential radiant panel systems, converted gravity heating systems or other low water tempera- ture applications should be installed with balancing valves and bypass piping equal to the supply and return size to avoid excessive flue gas condensation due to lower operating water temperatures. For alternate piping, contact your Weil-McLain sales office. CSA design certified for installation on combustible flooring. Tested for 50 psi working pressure.

Part number 550-110-260/0107

63

Image 63
Contents Gold CGs How it works Gold CGs Gas-Fired Induced-Draft Water Boiler Contents Installer Please read before proceedingUser 1a Prepare boiler location codes & checklist Installations must follow these codesBefore locating the boiler, check the following 1b Prepare boiler location clearances Vent system When removing boiler from an existing common vent system1c Prepare boiler location vent system CGs special vent systemProducts to avoid 1d Prepare boiler location contaminationSizing air openings 1e Prepare boiler location air openingsCombustion air options Special considerationsSizing air openings for CGs installations Inspect orifices and burners 2a Prepare boiler placement & setupOrifice replacement procedure Place boiler/crate near positionPrepare boiler for test 2b Prepare boiler pressure testHydrostatic pressure test Drain and remove fittings3a Water piping general information 3b Water piping single-zone system Systems 3c Water piping multiple zonesPiping multiple zones Piping for radiant heating Systems or converted gravityReturn water 130F or higher Primary/secondary preferred bypass piping method Temperature gaugesValve adjustment Figures 8 and 9 only 3d Piping low temp systemsPrimary/secondary piping BOILER-bypass piping method Valve adjustmentFigures 8 SYSTEM-bypass piping method Prevent chilled water from entering 3e Water piping refrigeration systemsVenting and combustion air Propane Gas Connecting gas supply piping to boilerGas piping Natural GasThermostat Field wiringElectrical installation must comply with Wiring connectionsVerify water chemistry Freeze protection when used7a Start-up preparation Check for gas leaksStart the boiler 7b Start-up operate boilerInspect system water piping Inspect base insulation Final check before starting boilerPilot burner flame Figure 7c Start-up if boiler doesn’t startCheck burner flames Check forInstallation and service certificate Check-out procedure checklist9a Operation sequence Schematic wiring diagram 9b Operation wiring diagramsLadder wiring diagram 9c Operating instructions CGs-3 to CGs-6 9c Operating instructions CGs-3 to CGs-6 9c Operating instructions CGs-3 to CGi-6 Verify Proper Operation After Servicing 10a Service and maintenance schedule10b Service & maintenance annual start-up Oiled-bearing circulators Burners, base and inlet air boxCondensate drain system Inducer motor10b Service & maint. annual start-up Relief valve, typical Boiler relief valveReview with owner Cleaning boiler heating surfaces11a Troubleshooting procedure Before troubleshootingCheck the following Troubleshooting air pressure reading 11b Troubleshooting air pressure switchAir pressure switch Check pressure switch settingTroubleshooting the control module 11c Troubleshooting control moduleControl indicator lights Lockout modes Control indicator lights NON-LOCKOUT modesControl module connections Chart 1 Troubleshooting Power light status 11d Troubleshooting control module lightsChart 2 Tstat Circ & Power lights flashing Chart 3 Press Switch & Power lights flashing Chart 4 Flame & Power lights flashing Item 8 , Does blower motor operate? Verify Sequence of operation, , Section assembly Base Jacket Trim Controls 12a Replacement partsSection assembly 12b Replacement parts section assemblyBase assembly 12c Replacement parts baseDescription Weil-McLain Part number Jacket assembly 12d Replacement parts jacketBoiler Model Weil-McLain part number Part number 12e Replacement parts trimPropane gas components 12f Replacement parts controlsDimensional drawing 13a DimensionsDOE 13b RatingsRemoval of Combustion Chamber Lining or Base Panels Handling ceramic fiber and fiberglass materials