Weil-McLain
550-110-260/0107
manual
Ladder wiring diagram
Troubleshooting
Install
9b Operation wiring diagrams
Field wiring
Dimension
Section assembly
Check-out procedure checklist
Valve adjustment
Check pressure switch setting
Temperature gauges
Page 33
GOLD CGs
Gas-Fired
Water Boiler — Boiler Manual
Figure 20
Ladder wiring diagram
Part number
550-110-260/0107
33
Page 32
Page 34
Image 33
Page 32
Page 34
Contents
Gold CGs
How it works
Gold CGs Gas-Fired Induced-Draft Water Boiler
Contents
Installer
Please read before proceeding
User
1a Prepare boiler location codes & checklist
Installations must follow these codes
Before locating the boiler, check the following
1b Prepare boiler location clearances
1c Prepare boiler location vent system
When removing boiler from an existing common vent system
CGs special vent system
Vent system
Products to avoid
1d Prepare boiler location contamination
Combustion air options
1e Prepare boiler location air openings
Special considerations
Sizing air openings
Sizing air openings for CGs installations
Orifice replacement procedure
2a Prepare boiler placement & setup
Place boiler/crate near position
Inspect orifices and burners
Hydrostatic pressure test
2b Prepare boiler pressure test
Drain and remove fittings
Prepare boiler for test
3a Water piping general information
3b Water piping single-zone system
Piping multiple zones Piping for radiant heating
3c Water piping multiple zones
Systems or converted gravity
Systems
Return water 130F or higher
Valve adjustment Figures 8 and 9 only
Temperature gauges
3d Piping low temp systems
Primary/secondary preferred bypass piping method
Primary/secondary piping
BOILER-bypass piping method
Valve adjustment
Figures 8
SYSTEM-bypass piping method
Prevent chilled water from entering
3e Water piping refrigeration systems
Venting and combustion air
Gas piping
Connecting gas supply piping to boiler
Natural Gas
Propane Gas
Electrical installation must comply with
Field wiring
Wiring connections
Thermostat
7a Start-up preparation
Freeze protection when used
Check for gas leaks
Verify water chemistry
Inspect system water piping Inspect base insulation
7b Start-up operate boiler
Final check before starting boiler
Start the boiler
Check burner flames
7c Start-up if boiler doesn’t start
Check for
Pilot burner flame Figure
Installation and service certificate
Check-out procedure checklist
9a Operation sequence
Schematic wiring diagram
9b Operation wiring diagrams
Ladder wiring diagram
9c Operating instructions CGs-3 to CGs-6
9c Operating instructions CGs-3 to CGs-6
9c Operating instructions CGs-3 to CGi-6
Verify Proper Operation After Servicing
10a Service and maintenance schedule
10b Service & maintenance annual start-up
Condensate drain system
Burners, base and inlet air box
Inducer motor
Oiled-bearing circulators
10b Service & maint. annual start-up
Relief valve, typical
Boiler relief valve
Review with owner
Cleaning boiler heating surfaces
11a Troubleshooting procedure
Before troubleshooting
Check the following
Air pressure switch
11b Troubleshooting air pressure switch
Check pressure switch setting
Troubleshooting air pressure reading
Control indicator lights Lockout modes
11c Troubleshooting control module
Control indicator lights NON-LOCKOUT modes
Troubleshooting the control module
Control module connections
Chart 1 Troubleshooting Power light status
11d Troubleshooting control module lights
Chart 2 Tstat Circ & Power lights flashing
Chart 3 Press Switch & Power lights flashing
Chart 4 Flame & Power lights flashing
Item 8 ,
Does blower motor operate?
Verify Sequence of operation, ,
Section assembly Base Jacket Trim Controls
12a Replacement parts
Section assembly
12b Replacement parts section assembly
Base assembly
12c Replacement parts base
Description Weil-McLain Part number
Jacket assembly
12d Replacement parts jacket
Boiler Model Weil-McLain part number
Part number
12e Replacement parts trim
Propane gas components
12f Replacement parts controls
Dimensional drawing
13a Dimensions
DOE
13b Ratings
Removal of Combustion Chamber Lining or Base Panels
Handling ceramic fiber and fiberglass materials
Related pages
All Diagram page
Diagram #1 for JVC LT-42X898
Wiring Diagram for Frigidaire FFBC46F5L
PC Timing Reference Chart for ViewSonic VT2730
Electrical Diagrams for Lincoln Electric SVM153-A
Sled Mounted GY-HD250U Studio System Diagram for JVC GY-HD250U
Appendix F Wiring diagrams Appendices for Toshiba SATELLITE U200
Stitch Setting Chart for Brother 885-V35/V37
Consulte el diagrama siguiente for Samsung SBB-SNOWH3U/EN
Midi Implementation Chart for Optimus MD-1600
Electrical Logic Schematic for Exmark 977
What troubleshooting steps for
clone programming issues
can be applied to LG 26LQ630H?
Top
Page
Image
Contents