8 Check-out procedure — checklist

Boiler and heat distribution units filled with water?

Automatic air vent, if used, open one full turn?

Air purged from system?

Air purged from gas piping? Piping checked for leaks?

Correctly sized manifold orifices installed? Refer to manual Section 2a to check size and fuel type.

Correctly sized manifold orifices must be used. Failure to do so will cause severe personal in- jury, death or substantial property damage.

Followed operating instructions on boiler or in manual Section 9 for proper start-up?

Proper burner flame observed? Refer to Check burner flame, manual Section 7b.

Test limit control — While burners are operating, move indicator on limit control below actual boiler water tem- perature. Burners should go off while circulator continues to operate. Raise setting on limit control above boiler water temperature and burners should reignite.

Test additional field-installed controls — If boiler has a low water cutoff, additional high limit or other controls, test for operation as outlined by manufacturer. Burners should be operating and should go off when controls are tested. When controls are restored, burners should reignite.

Test ignition system safety device:

a.Connect manometer to outlet side of gas valve.

b.Start boiler, allowing for normal start-up cycle to oc- cur and main burners to ignite.

c.With main burners on, manually shut off gas supply at manual main shutoff gas valve. Burners should go off.

d.Open manual main shutoff gas valve. Manometer should confirm there is no gas flow.

e.Pilot will relight, flame sensing element will sense pilot flame and main burners will reignite.

Set limit control(s) to system temperature requirements. Adjust balancing valves and controls to provide design temperature to system.

For multiple zones, adjust flow so it is about the same in each zone.

Verify thermostat heat anticipator (if available) set properly? Refer to Field wiring, manual Section 6, Thermostat(s).

Cycle boiler with thermostat — Raise to highest setting and verify boiler goes through normal start-up cycle. Lower to lowest setting and verify boiler goes off.

Measure natural gas input:

a.Operate boiler 10 minutes.

b.Turn off other appliances.

c.At natural gas meter, measure time (in seconds) re- quired to use one cubic foot of gas.

d.Calculate gas input:

e.Btuh calculated should approximate input rating on boiler rating label.

Check manifold gas pressure by connecting manometer to downstream test tapping on main gas valve. Manifold pres- sure for natural gas should be 3.5" w.c. and for propane gas should be 10" w.c.

Observe several operating cycles for proper operation.

Set room thermostat to desired room temperature.

Fill in Installation and service certificate below?

Review all instructions shipped with this boiler with owner or maintenance person. Return instructions to envelope and give to owner or place in pocket inside front panel in boiler.

Installation and service certificate

Boiler model __________________ Series __________ CP number ___________ Date installed ___________

Measured Btuh input ____________________

Installation instructions have been followed.

 

 

 

 

Check out sequence has been performed.

 

 

Above information is certified to be correct.

 

 

Information received and left with owner/maintenance person

Installer ________________________

________________________________

________________________

(company)

 

(address)

(phone)

Installer’s signature: _____________________________________

30

Part number 550-110-260/0107

Image 30
Contents Gold CGs How it works Gold CGs Gas-Fired Induced-Draft Water Boiler Contents Installer Please read before proceedingUser 1a Prepare boiler location codes & checklist Installations must follow these codesBefore locating the boiler, check the following 1b Prepare boiler location clearances CGs special vent system When removing boiler from an existing common vent system1c Prepare boiler location vent system Vent system1d Prepare boiler location contamination Products to avoidSpecial considerations 1e Prepare boiler location air openingsCombustion air options Sizing air openingsSizing air openings for CGs installations Place boiler/crate near position 2a Prepare boiler placement & setupOrifice replacement procedure Inspect orifices and burnersDrain and remove fittings 2b Prepare boiler pressure testHydrostatic pressure test Prepare boiler for test3a Water piping general information 3b Water piping single-zone system Systems or converted gravity 3c Water piping multiple zonesPiping multiple zones Piping for radiant heating SystemsReturn water 130F or higher 3d Piping low temp systems Temperature gaugesValve adjustment Figures 8 and 9 only Primary/secondary preferred bypass piping methodPrimary/secondary piping Valve adjustment BOILER-bypass piping methodFigures 8 SYSTEM-bypass piping method 3e Water piping refrigeration systems Prevent chilled water from enteringVenting and combustion air Natural Gas Connecting gas supply piping to boilerGas piping Propane GasWiring connections Field wiringElectrical installation must comply with ThermostatCheck for gas leaks Freeze protection when used7a Start-up preparation Verify water chemistryFinal check before starting boiler 7b Start-up operate boilerInspect system water piping Inspect base insulation Start the boilerCheck for 7c Start-up if boiler doesn’t startCheck burner flames Pilot burner flame FigureCheck-out procedure checklist Installation and service certificate9a Operation sequence 9b Operation wiring diagrams Schematic wiring diagramLadder wiring diagram 9c Operating instructions CGs-3 to CGs-6 9c Operating instructions CGs-3 to CGs-6 9c Operating instructions CGs-3 to CGi-6 10a Service and maintenance schedule Verify Proper Operation After Servicing10b Service & maintenance annual start-up Inducer motor Burners, base and inlet air boxCondensate drain system Oiled-bearing circulators10b Service & maint. annual start-up Boiler relief valve Relief valve, typicalCleaning boiler heating surfaces Review with owner11a Troubleshooting procedure Before troubleshootingCheck the following Check pressure switch setting 11b Troubleshooting air pressure switchAir pressure switch Troubleshooting air pressure readingControl indicator lights NON-LOCKOUT modes 11c Troubleshooting control moduleControl indicator lights Lockout modes Troubleshooting the control moduleControl module connections 11d Troubleshooting control module lights Chart 1 Troubleshooting Power light statusChart 2 Tstat Circ & Power lights flashing Chart 3 Press Switch & Power lights flashing Chart 4 Flame & Power lights flashing Item 8 , Does blower motor operate? Verify Sequence of operation, , 12a Replacement parts Section assembly Base Jacket Trim Controls12b Replacement parts section assembly Section assembly12c Replacement parts base Base assemblyDescription Weil-McLain Part number 12d Replacement parts jacket Jacket assemblyBoiler Model Weil-McLain part number 12e Replacement parts trim Part number12f Replacement parts controls Propane gas components13a Dimensions Dimensional drawing13b Ratings DOEHandling ceramic fiber and fiberglass materials Removal of Combustion Chamber Lining or Base Panels