Weil-McLain 550-110-260/0107 manual Description Weil-McLain Part number

Page 57

GOLD CGs Gas-Fired Water Boiler — Boiler Manual

12c Replacement parts — base (continued)

Item

Description

 

Weil-McLain

 

 

 

part number

 

Base insulation kit

CGs-3

381-356-515

 

(includes insulation for all base parts above plus gasket material

CGs-4

381-356-516

 

needed between block assembly and base)

CGs-5

381-356-517

 

 

CGs-6

381-356-518

 

 

 

 

 

Base assembly kit

CGs-3

381-356-522

 

(includes base panels items 1, 2, 3, 4, 5, 6, 7, 8, 11,13, 22 and 23 plus

CGs-4

381-356-523

 

insulation, Air box gaskets, and hardware)

CGs-5

381-356-524

 

 

CGs-6

381-356-525

 

Inlet air box top panel kit

CGs-3

381-356-501

 

(includes items 13 and 14)

CGs-4

381-356-502

 

 

CGs-5

381-356-503

 

 

CGs-6

381-356-504

 

 

 

 

 

Inlet air box front panel kit

CGs-3

381-356-508

 

(includes items 11, 12 and 23)

CGs-4

381-356-509

 

 

CGs-5

381-356-510

 

 

CGs-6

381-356-511

1

Base pan (in Base assembly)

 

 

 

 

 

 

2

Boiler leg kit

 

550-320-219

3

Heat shield (in Base assembly)

 

 

 

 

 

 

4

Burner baffle (in Base assembly)

 

 

5

Base left side panel (in Base assembly)

 

 

 

 

 

 

6

Base right side panel (in Base assembly)

 

 

7

Base back panel (in Base assembly)

 

 

 

 

 

 

8

Base front cross-tie assembly (in Base assembly)

 

 

9

Pilot bracket

 

450-003-689

 

 

 

 

10

Pilot burner assembly — Natural gas

 

511-330-080

 

Pilot burner assembly — Propane gas

 

511-330-081

11

Inlet air box front panel (in Inlet air box front panel kit)

 

 

 

 

 

 

12

Inlet air box front panel gasket (Use Gasket kit)

 

 

 

 

 

 

13

Inlet air box top panel (in Inlet air box top panel kit)

 

 

14

Inlet air box top panel gasket (Use Gasket kit)

 

 

 

 

 

 

15

Manifold (per size)

CGs-3

591-126-722

 

 

CGs-4

591-126-723

 

 

CGs-5

591-126-724

 

 

CGs-6

591-126-725

16

Manifold mounting gasket

 

590-317-406

 

 

 

 

17

Burner mounting panel

CGs-3

450-003-690

 

 

CGs-4

450-003-691

 

 

CGs-5

450-003-692

 

 

CGs-6

450-003-693

18

Rear spacer strip

CGs-3

550-320-160

 

 

CGs-4

550-320-161

 

 

CGs-5

550-320-162

 

 

CGs-6

550-320-163

 

 

 

 

19

Burner

 

512-200-076

20

Burner orifice — Natural gas, sea level

 

560-529-077

 

Burner orifice — Propane gas, sea level

 

560-529-078

 

 

 

 

21

Thermal fuse element

 

512-050-230

22

Grommet for sealing pilot tubing/wiring opening to Air box

 

591-850-064

 

 

 

 

23

Inspection port clear plug

 

591-491-216

24

Hex nut for burner end stud, 5 mm

 

550-320-170

 

 

 

 

 

Gasket (for Air inlet box covers), 8-foot length

 

590-317-400

 

 

 

 

Part number 550-110-260/0107

57

Image 57
Contents Gold CGs How it works Gold CGs Gas-Fired Induced-Draft Water Boiler Contents Installer Please read before proceedingUser 1a Prepare boiler location codes & checklist Installations must follow these codesBefore locating the boiler, check the following 1b Prepare boiler location clearances 1c Prepare boiler location vent system When removing boiler from an existing common vent systemCGs special vent system Vent systemProducts to avoid 1d Prepare boiler location contaminationCombustion air options 1e Prepare boiler location air openingsSpecial considerations Sizing air openingsSizing air openings for CGs installations Orifice replacement procedure 2a Prepare boiler placement & setupPlace boiler/crate near position Inspect orifices and burnersHydrostatic pressure test 2b Prepare boiler pressure testDrain and remove fittings Prepare boiler for test3a Water piping general information 3b Water piping single-zone system Piping multiple zones Piping for radiant heating 3c Water piping multiple zonesSystems or converted gravity SystemsReturn water 130F or higher Valve adjustment Figures 8 and 9 only Temperature gauges3d Piping low temp systems Primary/secondary preferred bypass piping methodPrimary/secondary piping BOILER-bypass piping method Valve adjustmentFigures 8 SYSTEM-bypass piping method Prevent chilled water from entering 3e Water piping refrigeration systemsVenting and combustion air Gas piping Connecting gas supply piping to boilerNatural Gas Propane GasElectrical installation must comply with Field wiringWiring connections Thermostat7a Start-up preparation Freeze protection when usedCheck for gas leaks Verify water chemistryInspect system water piping Inspect base insulation 7b Start-up operate boilerFinal check before starting boiler Start the boilerCheck burner flames 7c Start-up if boiler doesn’t startCheck for Pilot burner flame FigureInstallation and service certificate Check-out procedure checklist9a Operation sequence Schematic wiring diagram 9b Operation wiring diagramsLadder wiring diagram 9c Operating instructions CGs-3 to CGs-6 9c Operating instructions CGs-3 to CGs-6 9c Operating instructions CGs-3 to CGi-6 Verify Proper Operation After Servicing 10a Service and maintenance schedule10b Service & maintenance annual start-up Condensate drain system Burners, base and inlet air boxInducer motor Oiled-bearing circulators10b Service & maint. annual start-up Relief valve, typical Boiler relief valveReview with owner Cleaning boiler heating surfaces11a Troubleshooting procedure Before troubleshootingCheck the following Air pressure switch 11b Troubleshooting air pressure switchCheck pressure switch setting Troubleshooting air pressure readingControl indicator lights Lockout modes 11c Troubleshooting control moduleControl indicator lights NON-LOCKOUT modes Troubleshooting the control moduleControl module connections Chart 1 Troubleshooting Power light status 11d Troubleshooting control module lightsChart 2 Tstat Circ & Power lights flashing Chart 3 Press Switch & Power lights flashing Chart 4 Flame & Power lights flashing Item 8 , Does blower motor operate? Verify Sequence of operation, , Section assembly Base Jacket Trim Controls 12a Replacement partsSection assembly 12b Replacement parts section assemblyBase assembly 12c Replacement parts baseDescription Weil-McLain Part number Jacket assembly 12d Replacement parts jacketBoiler Model Weil-McLain part number Part number 12e Replacement parts trimPropane gas components 12f Replacement parts controlsDimensional drawing 13a DimensionsDOE 13b RatingsRemoval of Combustion Chamber Lining or Base Panels Handling ceramic fiber and fiberglass materials