Weil-McLain 550-110-260/0107 manual Item 8

Page 51

GOLD CGs Gas-Fired Water Boiler — Boiler Manual

11d Troubleshooting — control module lights (cont.)

CHART 5 FLAME light flashing and POWER light on steady

ALSO — Troubleshooting failure to establish main flame

 

 

 

 

 

Electrical shock hazard — Wherever you see TURN OFF POWER

, follow the instructions. Failure to follow

 

 

 

 

 

 

 

 

instructions could result in severe personal injury, death or substantial property damage.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

• Are main manual shutoff valve and boiler gas valve open?

 

 

 

 

 

• Is pilot flame visible through inspection port?

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

No

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Yes

 

 

 

 

No

 

 

 

 

 

 

 

Yes

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TURN OFF POWER

to boiler at service switch or breaker.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

• Check the voltage across

 

 

 

 

 

 

 

 

 

• Open main manual shutoff valve and boiler gas valve (per

 

 

 

 

 

 

terminals "C" and "A" of the

 

 

Make sure ground wire

 

Operating instructions in this manual). Wait at least 45

 

 

 

 

 

 

gas valve (see Table G,

 

 

 

terminal is securely fastened

 

seconds.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

page 33).

 

 

 

 

 

 

 

to control module mounting

• Turn on power at service switch or breaker. Allow boiler to cycle.

 

 

 

 

 

 

Is 24 VAC present there?

 

 

 

screw.

 

 

 

 

 

 

 

Does FLAME light flash now?

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Yes

 

 

No

 

 

 

 

 

 

 

 

 

 

No

 

 

 

 

 

 

 

 

 

 

 

 

 

Yes

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

• Check the voltage across

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

• Boiler should be in

 

• Verify inlet gas pressure at gas

 

 

 

 

 

• If the wiring from the

 

 

 

 

terminals "B" and "A" (see

 

 

 

valve:

 

 

 

 

 

 

 

 

 

 

 

 

 

control module to gas

 

 

 

 

Table G, page 33) of the

 

normal operating

 

 

 

Natural gas — 5.0" w.c. min/14.0"

 

 

 

 

 

 

valve is intact, replace the

 

 

 

 

 

gas valve.

 

 

 

sequence.

 

 

 

w.c. max

 

 

 

 

 

 

control module.

 

 

 

 

 

Is 24 VAC present there?

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Observe operation

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Retest.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Propane — 11.0" w.c. min/14.0"

 

 

 

 

 

 

 

 

 

 

 

 

No

 

 

 

Yes

 

until thermostat is

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

w.c. max

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

satisfied and blower

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

has completed its

 

 

Is gas present at gas valve inlet and

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

post-purge cycle.

 

 

 

 

 

 

 

 

 

within above range?

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

• Verify inlet gas pressure at gas valve:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Yes

 

 

 

 

No

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Natural gas — 5.0" w.c. min/14.0" w.c. max

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Propane — 11.0" w.c. min/14.0" w.c. max

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TURN OFF POWER

to

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Is gas present at gas valve inlet and within above range?

 

boiler at service switch or

 

 

 

 

 

• Contact gas supplier to correct

 

 

 

 

breaker.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

pressure or gas supply.

 

 

 

 

No

 

 

 

 

 

 

 

 

Yes

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

• Remove air inlet box top

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(see Figure 27, page 56 for

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

location).

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TURN OFF POWER to

 

 

TURN OFF POWER to boiler at service switch or breaker.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

• Verify pilot gas line is not

 

 

 

 

 

 

 

 

boiler at service switch or

 

 

• Check flame signal — Detach sense lead from igntion control

 

kinked, obstructed or damaged

 

 

 

 

breaker.

 

 

 

(Figure 25, item 8, page 46).

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

and is correctly attached to

 

 

 

 

 

 

Remove air inlet box cover (see

 

 

• Connect negative lead of MICROAMMETER to control sense

 

pilot and gas valve.

 

 

 

 

 

 

 

 

Figure 27, page 56 for location).

 

 

 

terminal (Figure 25, item 8, page 46). Connect positive lead of

• Verify pilot ignition electrode,

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

MICROAMMETER to sense wire.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

electrode ceramic and spark

 

 

 

 

 

 

Verify pilot burner is securely

 

 

• DISCONNECT red wire connected to terminal "B" (see

 

lead wire from control are in

 

 

 

 

 

 

 

 

attached to pilot bracket, bracket

 

 

 

Table G, page 33) of the gas valve.

 

 

 

good condition. Spark gap

 

 

 

 

 

 

 

 

is securely attached to cross tie,

 

 

• Turn on power to boiler and allow to cycle. As soon as pilot is

 

should be approximately 1/8".

 

 

 

 

 

 

 

and there is no corrosion on the

 

 

 

burning, the MICROAMMETER should read at least 1.0

• Correct any above problems,

 

 

 

 

 

 

 

parts which would affect the

 

 

 

microamp.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

replacing pilot if burner or

 

 

 

 

 

 

 

 

ground path for flame sense.

 

 

 

 

 

Is flame signal at least 1.0 microamp?

 

 

 

wiring is damaged.

 

 

 

 

 

 

Verify that pilot flame rod, flame

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

No

 

 

 

 

 

 

 

 

Yes

 

 

• Reinstall air box top to operate

 

 

 

 

 

 

rod ceramic and lead wire from

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

boiler for retest after any

 

 

 

 

 

 

 

 

control module to flame rod are in

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

changes or corrections.

 

 

 

 

 

 

 

 

good condition.

 

 

• If none of the previous steps

 

• If the wiring from the

• If none of the above corrects

 

 

 

 

 

Correct any above problems,

 

 

 

(including replacing pilot)

 

 

 

 

 

 

 

 

 

 

control module to gas

 

problem, then replace the

 

 

 

 

 

 

 

 

replacing pilot if burner or wiring

 

 

 

corrects problem, then replace

 

 

 

 

 

 

 

 

 

 

 

 

 

 

valve is intact, replace the

 

control module, reinstall air box

 

 

 

 

 

 

is damaged.

 

 

 

the control module, reinstall air

 

 

 

 

 

 

 

 

 

control module and retest.

 

top, and retest.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

box cover and retest.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Part number 550-110-260/0107

51

Image 51
Contents Gold CGs How it works Gold CGs Gas-Fired Induced-Draft Water Boiler Contents Installer Please read before proceedingUser 1a Prepare boiler location codes & checklist Installations must follow these codesBefore locating the boiler, check the following 1b Prepare boiler location clearances Vent system When removing boiler from an existing common vent system1c Prepare boiler location vent system CGs special vent systemProducts to avoid 1d Prepare boiler location contaminationSizing air openings 1e Prepare boiler location air openingsCombustion air options Special considerationsSizing air openings for CGs installations Inspect orifices and burners 2a Prepare boiler placement & setupOrifice replacement procedure Place boiler/crate near positionPrepare boiler for test 2b Prepare boiler pressure testHydrostatic pressure test Drain and remove fittings3a Water piping general information 3b Water piping single-zone system Systems 3c Water piping multiple zonesPiping multiple zones Piping for radiant heating Systems or converted gravityReturn water 130F or higher Primary/secondary preferred bypass piping method Temperature gaugesValve adjustment Figures 8 and 9 only 3d Piping low temp systemsPrimary/secondary piping BOILER-bypass piping method Valve adjustmentFigures 8 SYSTEM-bypass piping method Prevent chilled water from entering 3e Water piping refrigeration systemsVenting and combustion air Propane Gas Connecting gas supply piping to boilerGas piping Natural GasThermostat Field wiringElectrical installation must comply with Wiring connectionsVerify water chemistry Freeze protection when used7a Start-up preparation Check for gas leaksStart the boiler 7b Start-up operate boilerInspect system water piping Inspect base insulation Final check before starting boilerPilot burner flame Figure 7c Start-up if boiler doesn’t startCheck burner flames Check forInstallation and service certificate Check-out procedure checklist9a Operation sequence Schematic wiring diagram 9b Operation wiring diagramsLadder wiring diagram 9c Operating instructions CGs-3 to CGs-6 9c Operating instructions CGs-3 to CGs-6 9c Operating instructions CGs-3 to CGi-6 Verify Proper Operation After Servicing 10a Service and maintenance schedule10b Service & maintenance annual start-up Oiled-bearing circulators Burners, base and inlet air boxCondensate drain system Inducer motor10b Service & maint. annual start-up Relief valve, typical Boiler relief valveReview with owner Cleaning boiler heating surfaces11a Troubleshooting procedure Before troubleshootingCheck the following Troubleshooting air pressure reading 11b Troubleshooting air pressure switchAir pressure switch Check pressure switch settingTroubleshooting the control module 11c Troubleshooting control moduleControl indicator lights Lockout modes Control indicator lights NON-LOCKOUT modesControl module connections Chart 1 Troubleshooting Power light status 11d Troubleshooting control module lightsChart 2 Tstat Circ & Power lights flashing Chart 3 Press Switch & Power lights flashing Chart 4 Flame & Power lights flashing Item 8 , Does blower motor operate? Verify Sequence of operation, , Section assembly Base Jacket Trim Controls 12a Replacement partsSection assembly 12b Replacement parts section assemblyBase assembly 12c Replacement parts baseDescription Weil-McLain Part number Jacket assembly 12d Replacement parts jacketBoiler Model Weil-McLain part number Part number 12e Replacement parts trimPropane gas components 12f Replacement parts controlsDimensional drawing 13a DimensionsDOE 13b RatingsRemoval of Combustion Chamber Lining or Base Panels Handling ceramic fiber and fiberglass materials