Weil-McLain
550-110-260/0107
manual
12c Replacement parts base, Base assembly
Troubleshooting
Install
9b Operation wiring diagrams
Field wiring
Dimension
Section assembly
Check-out procedure checklist
Valve adjustment
Check pressure switch setting
Temperature gauges
Page 56
GOLD CGs
Gas-Fired
Water Boiler — Boiler Manual
12c
Replacement parts — base
Figure 27
Base assembly
56
Part number
550-110-260/0107
Page 55
Page 57
Image 56
Page 55
Page 57
Contents
Gold CGs
How it works
Gold CGs Gas-Fired Induced-Draft Water Boiler
Contents
User
Installer
Please read before proceeding
Before locating the boiler, check the following
1a Prepare boiler location codes & checklist
Installations must follow these codes
1b Prepare boiler location clearances
When removing boiler from an existing common vent system
1c Prepare boiler location vent system
CGs special vent system
Vent system
1d Prepare boiler location contamination
Products to avoid
1e Prepare boiler location air openings
Combustion air options
Special considerations
Sizing air openings
Sizing air openings for CGs installations
2a Prepare boiler placement & setup
Orifice replacement procedure
Place boiler/crate near position
Inspect orifices and burners
2b Prepare boiler pressure test
Hydrostatic pressure test
Drain and remove fittings
Prepare boiler for test
3a Water piping general information
3b Water piping single-zone system
3c Water piping multiple zones
Piping multiple zones Piping for radiant heating
Systems or converted gravity
Systems
Return water 130F or higher
Temperature gauges
Valve adjustment Figures 8 and 9 only
3d Piping low temp systems
Primary/secondary preferred bypass piping method
Primary/secondary piping
Valve adjustment
BOILER-bypass piping method
Figures 8
SYSTEM-bypass piping method
3e Water piping refrigeration systems
Prevent chilled water from entering
Venting and combustion air
Connecting gas supply piping to boiler
Gas piping
Natural Gas
Propane Gas
Field wiring
Electrical installation must comply with
Wiring connections
Thermostat
Freeze protection when used
7a Start-up preparation
Check for gas leaks
Verify water chemistry
7b Start-up operate boiler
Inspect system water piping Inspect base insulation
Final check before starting boiler
Start the boiler
7c Start-up if boiler doesn’t start
Check burner flames
Check for
Pilot burner flame Figure
Check-out procedure checklist
Installation and service certificate
9a Operation sequence
9b Operation wiring diagrams
Schematic wiring diagram
Ladder wiring diagram
9c Operating instructions CGs-3 to CGs-6
9c Operating instructions CGs-3 to CGs-6
9c Operating instructions CGs-3 to CGi-6
10a Service and maintenance schedule
Verify Proper Operation After Servicing
10b Service & maintenance annual start-up
Burners, base and inlet air box
Condensate drain system
Inducer motor
Oiled-bearing circulators
10b Service & maint. annual start-up
Boiler relief valve
Relief valve, typical
Cleaning boiler heating surfaces
Review with owner
Check the following
11a Troubleshooting procedure
Before troubleshooting
11b Troubleshooting air pressure switch
Air pressure switch
Check pressure switch setting
Troubleshooting air pressure reading
11c Troubleshooting control module
Control indicator lights Lockout modes
Control indicator lights NON-LOCKOUT modes
Troubleshooting the control module
Control module connections
11d Troubleshooting control module lights
Chart 1 Troubleshooting Power light status
Chart 2 Tstat Circ & Power lights flashing
Chart 3 Press Switch & Power lights flashing
Chart 4 Flame & Power lights flashing
Item 8 ,
Does blower motor operate?
Verify Sequence of operation, ,
12a Replacement parts
Section assembly Base Jacket Trim Controls
12b Replacement parts section assembly
Section assembly
12c Replacement parts base
Base assembly
Description Weil-McLain Part number
12d Replacement parts jacket
Jacket assembly
Boiler Model Weil-McLain part number
12e Replacement parts trim
Part number
12f Replacement parts controls
Propane gas components
13a Dimensions
Dimensional drawing
13b Ratings
DOE
Handling ceramic fiber and fiberglass materials
Removal of Combustion Chamber Lining or Base Panels
Related pages
All Assembly page
Auger Assembly Changeover for Sterling AF-XXX
Seat Assembly for Weed Eater 186843
Assembly as shown for Casablanca Fan Company 55051
Mower Deck Assembly Series 3 Part for Snapper YZ20484BVE
Open Razor Head assembly again and leave open to air dry for Philips 7125X
To remove the VT1433B-AYF assembly for VXI VT1433B
Frame Assembly for Massey Ferguson L&G 1693583
Assembly Instructions for Delta 23-735
Bracket assembly Clip for Bretford LAP24EBA
Brine Valve Assembly for Kenmore 100 625.388150, 150 625.388160
Which Lenovo models support switchable graphics technology?
View compatible models
Top
Page
Image
Contents