Patterson-Kelley MOD-04 owner manual Electrical Hazards, Safety, Burn, Fire, and Explosion Hazards

Page 5

Modu-Fire®Gas-Fired Boiler

2.4SAFETY LABELS

NOTE

Make sure this union is tight before closing cabinet cover after servicing boiler.

c 1998 HCS, Inc. 800-748-0241

Reorder No. 8032-02NHAK

NOTE

When opening leak test valves, always follow instructions in operation and safety manual.

c 1998 HCS, Inc. 800-748-0241

Reorder No. 8032-01NHPK

!WARNING

Improper use may result in fire or injury.

Read instructions/safety manual before installing, operating or servicing boiler.

c 1998 HCS, Inc. 800-748-0241

Reorder No. 6020-V2WHPK

!

WARNING

Electrical hazard.

Follow lockout/tagout

procedure when

servicing this boiler.

C 1998 HCS, Inc. 800-748-0241

Reorder No. 5025-V1WHPK

The safety labels shown above are affixed to your boiler. Although the labels are of high quality, they may become dislodged or unreadable over time. Contact Patterson-Kelley for replacement labels.

2.5SAFETY PRECAUTIONS

Provide a suitable location for the boiler, away from normal personnel traffic, with adequate working space, adequate clearances, proper ventilation and lighting, with a structure sufficiently strong and rigid to support the weight of the boiler, all piping, and accessories.

2.5.1 Electrical Hazards

!

WARNING

Electrical hazard.

Follow lockout/tagout

procedure when

servicing this boiler.

C 1998 HCS, Inc. 800-748-0241

Reorder No. 5025-V1WHPK

Safety

Shock hazard! Properly lockout/tagout the elec- trical service and all other energy sources before working on or near the machine.

Shock hazard! Boiler is not rated for wash- down service.

2.5.2 Burn, Fire, and Explosion Hazards

General Warning

Hot Surface

!WARNING

Improper use may result in fire or injury.

Read instructions/safety manual before installing, operating or servicing boiler.

c 1998 HCS, Inc. 800-748-0241

Reorder No. 6020-V2WHPK

NOTE

Make sure this union is tight before closing cabinet cover after servicing boiler.

c 1998 HCS, Inc. 800-748-0241

Reorder No. 8032-02NHAK

NOTE

When opening leak test valves, always follow instructions in operation and safety manual.

c 1998 HCS, Inc. 800-748-0241

Reorder No. 8032-01NHPK

Burn, fire, and explosion hazards! Installation must be in strict conformance to all applicable codes and standards including NFPA 54, ANSI Z223.1 and CAN/CGA B.149. Install all re- quired ventlines for gas devices. Refer to Sec- tion 3.7.2.

Hazard from incorrect fuels! Possible fire, ex- plosion, overheating, and damage. Do not use any fuels except the design fuel for the unit.

Overfire hazards! High pressure in gas or pro- pane supply could result in overfiring of other devices supplied from the same source.

Fire and explosion hazards! Close the main gas shutoff before servicing boiler.

2

Image 5
Contents PATTERSON-KELLEY Modu-FireGas-Fired Boiler Table of Contents What to do if you smell gas Modu-FireGas-Fired Boiler Introduction/SafetyBurn, Fire, and Explosion Hazards SafetyElectrical Hazards Chemical Hazards Modu-FireGas-Fired Boiler SafetyCrush Hazards Slip, Fall Hazards Modu-FireGas-Fired Boiler Safety Pressure HazardsInstallation Storage Prior to InstallationPlacement Initial InspectionClearances Modu-FireGas-Fired Boiler InstallationCombustion AIR Barometric Damper Vent ElbowsAutomatic Vent Damper Flue ConnectionRemoving an Existing Boiler Pipe Capacity for Natural Gas Piping Design Modu-FireGas-Fired Boiler Gas Supply Piping by InstallerGas Bleeds and Vents by Installer Boiler Inlet and Outlet Connections Boiler Water Piping by InstallerInspection Flushing and FillingWater Quality Test of Limit Controls Test of Ignition Safety SystemTest of Low Water Cut-off 12.1A Configuring the Local Controller Test of Low Gas Pressure SwitchTest of High Gas Pressure Switch For example, assume the following settings Configuration level Is pressed Table of Parameters Installation Air Flow Adjustments 12.1B Optional Remote ControlBasic Combustion Adjustment Procedure Control Panel Front Lighting ProceduresModu-FireGas-Fired Boiler Operation Emergency Shut Off Normal Shut Down ProceduresDaily Maintenance WeeklyMonthly During Operation Semi-AnnuallyAnnually MaintenancePilot Tube Ceramic Spider Ignition Electrode Standard Modulating IRI Modulating Modu-FireGas-Fired Boiler MaintenanceLoss of Power Do not Parts/Technical Support Table of Contents for this SectionCustomer Connections Customer Customer Input Analog Connections Customer Alarm Safety Flame Interlock Start 2 # Interlock Start 1 # Alarm Safety Flame Interlock Start 2 # Interlock Start 1 # Customer Connections Page Page Modu-Fire Gas-Fired Boiler Parts/Technical Support Main Assembly PartLocal Control Panel Modu-FireGas-Fired Boiler Parts/Technical Support No.Part Modu-FireGas-Fired Boiler Parts/Technical Support Gas TrainsStandard Gas Train 1500 IRI Gas Train IRI Gas Train 1500 No. Part Modu-FireGas-Fired Boiler Parts/Technical Support CabinetLimited Warranty Limited WarrantyMODU-FIREBOILER