3.3.3 Clearances

If the boiler is to be installed near combustible sur- faces, the minimum clearances shown in the table be- low must be maintained.

Failure to provide for the service access clearances, even with non-combustible surfaces, may cause future problems servicing the boiler.

The boiler must be installed in a space large in com- parison to the boiler as described in Section 6.3 of the National Fuel Gas Code, ANSI Z223.1, latest edition.

No pipes,

ducts, etc. C in this area.

Front of

A

B

Back of

Boiler

Boiler

 

 

 

 

 

D

 

 

 

 

 

 

 

 

 

 

 

 

D

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Minimum Clearances from Adjacent Walls, Ceiling, and Obstructions

Type of Surface

Dimensions (inches)

 

 

 

 

 

 

A

B

C†

D

 

 

 

 

 

Combustible Surfaces

30

24

30

24

 

 

 

 

 

Non-combustible Sur-

30

24*

30

24**

faces

 

 

 

 

"C" dimension includes clearance to remove the burner. Do not put pipes, ducts, etc. in this area above the boiler.

*CSA minimum. Actual clearance depends upon stacking requirements.

**Service access need be only on one side of a boiler or row of boilers. Boilers may be installed immedi- ately adjacent to each other. However, P-K recom- mends this clearance between each boiler when there is insufficient access at the rear to allow for service and adjustment.

In Canada: The boilers are approved for installation with zero clearance to combustible surfaces, but 24 inch service clearances are recommended.

3.4ELECTRICAL CONNECTIONS

All field wiring connections for power and control are in the rear service panel on the back of the boiler. Low voltage and high voltage terminal strips are indi- cated on the wiring diagram. The boiler power circuit

6

Image 9
Contents PATTERSON-KELLEY Modu-FireGas-Fired Boiler Table of Contents What to do if you smell gas Modu-FireGas-Fired Boiler Introduction/SafetySafety Electrical HazardsBurn, Fire, and Explosion Hazards Modu-FireGas-Fired Boiler Safety Crush HazardsChemical Hazards Slip, Fall Hazards Modu-FireGas-Fired Boiler Safety Pressure HazardsInstallation Storage Prior to InstallationPlacement Initial InspectionClearances Modu-FireGas-Fired Boiler InstallationCombustion AIR Barometric Damper Vent ElbowsAutomatic Vent Damper Flue ConnectionRemoving an Existing Boiler Pipe Capacity for Natural Gas Modu-FireGas-Fired Boiler Gas Supply Piping by Installer Gas Bleeds and Vents by InstallerPiping Design Boiler Inlet and Outlet Connections Boiler Water Piping by InstallerFlushing and Filling Water QualityInspection Test of Ignition Safety System Test of Low Water Cut-offTest of Limit Controls Test of Low Gas Pressure Switch Test of High Gas Pressure Switch12.1A Configuring the Local Controller For example, assume the following settings Configuration level Is pressed Table of Parameters Installation Air Flow Adjustments 12.1B Optional Remote ControlBasic Combustion Adjustment Procedure Lighting Procedures Modu-FireGas-Fired Boiler OperationControl Panel Front Emergency Shut Off Normal Shut Down ProceduresDaily Maintenance WeeklyMonthly During Operation Semi-AnnuallyAnnually MaintenancePilot Tube Ceramic Spider Ignition Electrode Standard Modulating IRI Modulating Modu-FireGas-Fired Boiler MaintenanceLoss of Power Do not Parts/Technical Support Table of Contents for this SectionCustomer Connections Customer Customer Input Analog Connections Customer Alarm Safety Flame Interlock Start 2 # Interlock Start 1 # Alarm Safety Flame Interlock Start 2 # Interlock Start 1 # Customer Connections Page Page Modu-Fire Gas-Fired Boiler Parts/Technical Support Main Assembly PartLocal Control Panel Modu-FireGas-Fired Boiler Parts/Technical Support No.Part Modu-FireGas-Fired Boiler Parts/Technical Support Gas TrainsStandard Gas Train 1500 IRI Gas Train IRI Gas Train 1500 No. Part Modu-FireGas-Fired Boiler Parts/Technical Support CabinetLimited Warranty Limited WarrantyMODU-FIREBOILER