3.0INSTALLATION

3.1RECEIVING AND STORAGE

3.1.1 Initial Inspection

Upon receiving the boiler, inspect it for signs of ship- ping damage. Pay particular attention to the control panel on the top of the boiler and the components mounted on the back, which may show damage from mishandling.

The exterior cabinet must be reasonably air-tight for the burner to operate correctly. Leaks caused by dents in the sheet metal or panels out of position may cause the limit controls to show Low Air. Check to be sure that the mixer core in the top burner is centered and has not moved in shipment; (see Section 5.2, "Clean- ing the Burner" for proper location). Verify that the total number of pieces shown on the packing slip agrees with those actually received.

Important: Note any damage or shortage on the freight bill and immediately notify the carrier. File all claims for shortage or damage with the carrier.

3.1.2 Storage Prior to Installation

If the boiler is not installed immediately, it must be stored in a location adequately protected from the weather, preferably indoors. If this is not possible, then it should remain in the shipping container and be covered by a tarpaulin or other waterproof covering.

Note: Controls and other equipment that are damaged or fail due to weather exposure are not covered by warranty.

3.2COMPLIANCE WITH CODES

The P-K MODU-FIRE®Boiler with standard compo- nents and many options complies with American Na- tional Standard/CSA Standard ANSI Z21.13/CSA 4.9, latest edition, Gas-Fired Low Pressure Steam and Hot Water Boilers. The heat exchanger is constructed and stamped in accordance with ASME Boiler and Pres- sure Vessel Code, Section IV for 160 psig maximum operating pressure and/or 250º F maximum operating

Installation

temperature. Other codes or approvals which apply will be labeled on the boiler.

Installation of the boiler must conform to all the re- quirements of all national, state and local codes estab- lished by the authorities having jurisdiction or, in the absence of such requirements, in the U.S. to the Na- tional Fuel Gas Code, ANSI Z223.1/NFPA 54, latest edition. In Canada, the equipment shall be installed in accordance with the current Installation Code for Gas Burning Appliances and Equipment, CAN/CGA- B.149, and applicable Provincial Regulations for the class, which should be carefully followed in all cases. Authorities having jurisdiction should be consulted before installations are made.

Where required by local codes, the installation must conform to American Society of Mechanical Engi- neers Safety Code for Controls and Safety Devices for Automatically Fired Boilers (ASME CSD-1).

In the Commonwealth of Massachusetts (a) this unit must be installed by a licensed pipe fitter / plumber,

(b)field installed gas cocks must be "T" handle type, and (c) piping of condensate shall conform with the State Plumbing Code.

3.3SETUP

3.3.1 Foundation

Provide a firm, level foundation, preferably of con- crete.

Note: The boiler may be installed on a combustible floor; however, the boiler must never be installed on carpeting.

3.3.2 Placement

The boiler must be level to function properly. To as- sist in leveling the boiler, the four (4) leg bolts (1/2"- NC) holding the boiler to the shipping skid must be reinstalled in the threaded legs on the bottom. The adjustable legs are also necessary to provide adequate floor clearance and prevent distortion on the cabinet, (twisting, etc.) in addition to leveling.

5

Image 8
Contents PATTERSON-KELLEY Modu-FireGas-Fired Boiler Table of Contents What to do if you smell gas Introduction/Safety Modu-FireGas-Fired BoilerBurn, Fire, and Explosion Hazards SafetyElectrical Hazards Chemical Hazards Modu-FireGas-Fired Boiler SafetyCrush Hazards Modu-FireGas-Fired Boiler Safety Pressure Hazards Slip, Fall HazardsStorage Prior to Installation InstallationPlacement Initial InspectionModu-FireGas-Fired Boiler Installation ClearancesCombustion AIR Vent Elbows Barometric DamperAutomatic Vent Damper Flue ConnectionRemoving an Existing Boiler Pipe Capacity for Natural Gas Piping Design Modu-FireGas-Fired Boiler Gas Supply Piping by InstallerGas Bleeds and Vents by Installer Boiler Water Piping by Installer Boiler Inlet and Outlet ConnectionsInspection Flushing and FillingWater Quality Test of Limit Controls Test of Ignition Safety SystemTest of Low Water Cut-off 12.1A Configuring the Local Controller Test of Low Gas Pressure SwitchTest of High Gas Pressure Switch For example, assume the following settings Configuration level Is pressed Table of Parameters 12.1B Optional Remote Control Installation Air Flow AdjustmentsBasic Combustion Adjustment Procedure Control Panel Front Lighting ProceduresModu-FireGas-Fired Boiler Operation Normal Shut Down Procedures Emergency Shut OffMaintenance Weekly DailyMonthly During Operation Semi-AnnuallyMaintenance AnnuallyPilot Tube Ceramic Spider Ignition Electrode Standard Modulating Modu-FireGas-Fired Boiler Maintenance IRI ModulatingLoss of Power Do not Table of Contents for this Section Parts/Technical SupportCustomer Connections Customer Customer Input Analog Connections Customer Alarm Safety Flame Interlock Start 2 # Interlock Start 1 # Alarm Safety Flame Interlock Start 2 # Interlock Start 1 # Customer Connections Page Page Main Assembly Part Modu-Fire Gas-Fired Boiler Parts/Technical SupportLocal Control Panel Modu-FireGas-Fired Boiler Parts/Technical Support Modu-FireGas-Fired Boiler Parts/Technical Support Gas Trains No.PartStandard Gas Train 1500 IRI Gas Train IRI Gas Train 1500 Modu-FireGas-Fired Boiler Parts/Technical Support Cabinet No. PartLimited Warranty Limited WarrantyMODU-FIREBOILER