MAINTENANCE-SERVICE SCHEDULE
SERVICE SCHEDULE
MAINTENANCE | DAILY | WEEKLY | QUARTERLY |
Check machine for cord damage | * |
|
|
Check recovery dome and gasket for damage and |
|
|
|
cleanliness | * |
|
|
Check brushes – should be clean with no lint or |
|
|
|
strings attached | * |
|
|
Inspect vac shoe for blockage; remove fibers with |
|
|
|
coat hanger, etc. | * |
|
|
Check hoses for wear, blockages, or damage | * |
|
|
Check handles, switches, and knobs for damage | * |
|
|
Run one gallon of water through solution system | * |
|
|
Clean out recovery tank, clean float screen and |
|
|
|
check float valve to make sure it moves freely | * |
|
|
Clean out solution | * |
|
|
Clean outside of all tanks and check for damage | * |
|
|
Run vac motor for at least one minute to allow motor |
|
|
|
to dry | * |
|
|
Store with dome off tank to allow the tank to dry | * |
|
|
Check all bearings for noise |
| * |
|
Check all gaskets for wear and leakage |
| * |
|
Check pump pressure; observe spray pattern and |
|
|
|
check with gauge if necessary |
| * |
|
Check and clean solution screen |
| * |
|
Check brush for wear; ensure bristles are not |
|
|
|
damaged |
| * |
|
Check condition of vac shoe and frame for damage |
| * |
|
Check overall performance of machine |
| * |
|
Check vac motor carbon brushes |
|
| * |
Check belts for wear and replace as necessary |
|
| * |
Check cables for fraying |
|
| * |
86302100 CLIPPER DUO 10/02/07 |