PERMIT OPERATION OF GAS APPLIANCES IF INSTALLED 18 INCHES OR MORE ABOVE THE FLOOR. THIS MAY REDUCE THE RISK IF LOCATION IN SUCH AN AREA CANNOT BE AVOIDED.

WARNING

FLAMMABLE ITEMS, PRESSURIZED CONTAINERS OR ANY OTHER POTENTIAL FIRE HAZARDOUS ARTICLES MUST NEVER BE PLACED ON OR ADJACENT TO THE BOILER. OPEN CONTAINERS OF FLAMMABLE MATERIAL MUST NOT BE STORED OR USED IN THE SAME ROOM WITH THE BOILER.

A hot water boiler installed above radiation level or as required by the authority having jurisdiction, must be provided with a low water cutoff device at the time of boiler installation.

AIR REQUIREMENTS

Provisions for combustion and ventilation air in accordance w i t h t h e c u r r e n t e d i t i o n o f t h e N a t i o n a l F u e l G a s Code, ANSI Z223 . 1, CAN/CSA B149 . 1, Installation C o d e s , o r a p p l i c a b l e p r o v i s i o n s o f t h e l o c a l building codes.

Provisions for vent, bleed and gas relief lines (when applicable).

Keep appliance area free of combustible or flammable liquids.

Do not obstruct the flow of combustion or ventilating air.

WARNING

FOR SAFE OPERATION PROVIDE ADEQUATE AIR FOR COMBUSTION AND VENTILATION. AN INSUFFICIENT SUPPLY OF AIR WILL CAUSE RECIRCULATION OF COMBUSTION PRODUCTS RESULTING IN AIR CONTAMINATION THAT MAY BE HAZARDOUS TO LIFE. SUCH A CONDITION OFTEN WILL RESULT IN A YELLOW, LUMINOUS BURNER FLAME, CAUSING CARBONING OR SOOTING OF THE COMBUSTION CHAMBER, BURNERS AND FLUE TUBES AND CREATES A RISK OF ASPHYXIATION.

Unconfined Space

In buildings of conventional frame, brick or stone construction, unconfined spaces may provide adequate air for combustion, and draft hood dilution.

If the unconfined space is within a building of tight construction (buildings using the following construction: weather stripping, heavy insulation, caulking, vapor barrier, etc.) air for combustion, ventilation, and draft hood dilution must be obtained from outdoors or spaces freely communicating with the outdoors. The installation instructions for confined spaces in tightly constructed buildings must be followed to ensure adequate air supply.

Confined Space

(a)U. S. Installations

When drawing combustion and dilution air from inside a conventionally constructed building to a confined space, such a space shall be provided with two permanent openings, ONE WITHIN 12 INCHES OF THE ENCLOSURE TOP AND ONE WITHIN 12 INCHES OF THE ENCLOSURE BOTTOM. Each opening shall have a free area of at least one square inch per 1000 Btuh of the total input of all appliances in the enclosure, but not less than 100 square inches.

If the confined space is within a building of tight construction, air for combustion, ventilation, and draft hood dilution must be obtained from outdoors. When directly communicating with the outdoors or communicating with the outdoors through vertical ducts, two permanent openings, located in the above manner, shall be provided. Each opening shall have a free area of not less than one square inch per 4000 Btuh of the total input of all appliances in the enclosure. If horizontal ducts are used, each opening shall have a free area of not less than one square inch per 2000 Btuh of the total input of all appliances in the enclosure.

(b) Canadian Installations

Ventilation of the space occupied by the boiler(s) shall be provided by an opening for ventilation air at the highest practical point communicating with outdoors. The total cross-sectional area shall be at least 10% of the area of the combustion air opening but in no case shall the cross-sectional area be less than 10 square inches (6500 mm2).

In additional to the above, there shall be permanent air supply opening(s) having a cross-sectional area of not less than 1 square inch per 7,000 BTUH (310 mm2/KW) up to and including 1,000,000 BTUH plus 1 square inch per 14,000 BTU in excess of 1,000,000 BTUH. This opening(s) shall be located at, or ducted to, a point neither more than 18" (450 mm) nor less than 6 inches (150 mm) above the floor level.

Where power vented equipment is used in the same room as the boiler, sufficient air openings must be supplied.

UNDERSIZED OPENINGS MAY RESULT IN INSUFFICIENT AIR FOR COMBUSTION.

WHERE AN EXHAUST FAN IS INSTALLED IN THE SAME ROOM WITH A BOILER, SUFFICIENT OPENINGS FOR AIR MUST BE PROVIDED IN THE WALLS.

UNDERSIZED OPENINGS WILL CAUSE AIR TO BE DRAWN INTO THE ROOM THROUGH THE CHIMNEY, CAUSING POOR COMBUSTION. SOOTING MAY RESULT WITH AN INCREASED RISK O F ASPHYXIATION.

CHEMICAL VAPOR CORROSION

WARNING

CORROSION OF THE FLUEWAYS AND VENT SYSTEM MAY OCCUR IF AIR FOR COMBUSTION CONTAINS C E R T A I N C H E M I C A L V A P O R S W H I C H B R E A K DOWN INTO ACIDS AT HIGH TEMPERATURE . SUCH CORROSION MAY RESULT IN FAILURE AND RISK OF ASPHYXIATION .

Water boiler corrosion and component failure can be caused by the heating and breakdown of airborne chemical vapors. Spray can propellants, cleaning solvents, refrigerator and air conditioning refrigerants, swimming pool chemicals, calcium and sodium chloride, waxes, and process chemicals are typical compounds which are corrosive. These materials are corrosive at very low concentration levels with little or no odor to reveal their presence. Products of this sort must not be stored near the boiler. Also, air which is brought in contact with the water boiler should not contain any of these chemicals. If necessary, uncontaminated air should be obtained from remote or outside sources.

13

Image 13
Contents Tennessee Waltz Parkway Ashland City, TN Models HW 300, 399, 420, 520, 610Important Definitions Safe INSTALLATION, USE and ServiceGeneral Safety Table of Contents Propane Natural Dimensions and Capacity Data27.7 33.3 Recovery CapacitiesIntroduction High Altitude InstallationsLIQUefied petroleum gas models Controls and Function High Limit Switch Safety Flow Switch Manual Reset High LimitThermal Balancer GPM LPMSafety Relief Valves Tank Temperature Control Thermometers GeneralDrain Valve Not Supplied Required AbilityCanadian Installations Confined Space S. InstallationsAIR Requirements Unconfined SpaceTypical Boiler Installation Installation ClearancesVenting LevelingConnecting Boiler to a Common Vent Vent Pipe InstallationDraft Hood Vent ConnectionMultiple Vent Table Venting Sidewall Optional Power Vent SystemVenting System Model HW-300 Boiler Combined Vent Sizing TablesConventional Installations System InstallationsLINEAR-TEMP Installations ONE Boiler Installed Independent of the Primary SystemSchematic of the LINEAR-TEMPSYSTEM NO. Suggested Items for InstallationBoiler Inlet Outlet Sizes Minimum Branch Sizes to BoilersGAS Connections Correct GAS Purging and SizingSpecific Multiplier Gravity ExampleGAS Pressure Regulators Model Rated Manifold Pressure Number Input Natural PropaneWiring Connections WiringD. System HW 300 toSingle Stage I.I.D. Honeywell GAS Valve HW 300 thru 670. Natural and Propane GAS U.S. & CanadaLINEAR-TEMP Installations Boilers and Secondary Circulator are Controlled by Page MODELS, Jucntion BOX W/4 Terminals Canadian MODELS, Junction BOX W/6 TerminalsCanadian MODELS, Junction BOX W/6 Terminals Schematic MODELS, Junction BOX W/4 Terminals MODELS, Junction BOX W/4 Terminals Piping Wiring Figures 16 and 17 on Pages 24Commercial Boiler with Vertical Tank USE this Table for Correct Pump and Water Pipe SizeCommercial Boiler with Horizontal Tank Commercial Boiler with Vertical TANK, CER-TEMP Wiring Figures 21 to 27 on Pages 28 toHW-300 HW-399 HW-420 HW-520 Three HW-520s, HW-610s or HW-670s UP-FLOW Model USE this Table for Correct Pump and Water Pipe Size Filling the System Operation and START-UP InstructionsPilot and Main Burner Main BurnerPilot Burner Electronic Ignition Consumption Rate Checking and Adjusting the InputRefer to Operating at Full Input or Full Capacity Stage Main Burner Operation Flame Current Sensed For Your Safety Read Before Lighting URN Pilo T Firing VA LVE Counterclockwise SET T HE Thermostat to Lowwest SettingManual Reset High Limit Switch Continuity Test General MaintenanceRelief Valve PRE-TROUBLESHOOTING Cleaning and Flushing InstructionsHOT Water Supply Boilers Preventive Maintenance Internal ContaminantsCER-TEMP 80 Recovery System Checkout Procedure TroubleshootingYES Is ceramic insulator surrounding the electrode in good Burner ignition problems?Condition not cracked or broken? Is there excessive draft conditions that may cause pilotMV & MV/PV? Replace pilot burner assembly Location of LEDs Flame LED Yellow LED Status and TroubleshootingStatus LED Green OFFNo Call for Heat Not applicable None OFF Conditions and Exceptions Limited Warranty