A.O. Smith HW 610 warranty Controls and Function

Page 8

HIGH ALTITUDE INSTALLATIONS

IN CANADA

Acceptance of these models for use at altitudes above 2000 feet (600 m) is based on field test of the individual installation by the provincial/state authority having jurisdiction.

IN THE U.S.A.

WARNING

INSTALLATIONS ABOVE 2000 FEET REQUIRE REPLACEMENT OF THE BURNER ORIFICES IN ACCORDANCE WITH THE CURRENT EDITION OF THE NATIONAL FUEL GAS CODE (ANSI Z223.1). FAILURE TO REPLACE THE ORIFICES WILL RESULT IN IMPROPER AND INEFFICIENT OPERATION OF THE APPLIANCE RESULTING IN THE PRODUCTION OF INCREASED LEVELS OF CARBON MONOXIDE GAS IN EXCESS OF SAFE LIMITS WHICH COULD RESULT IN SERIOUS PERSONAL INJURY OR DEATH.

For specific orifice requirements, please refer to the appropriate section of the National Fuel Gas Code ANSI Z223.1.

You should contact your gas supplier for any specific changes which may be required in your area.

Ratings specified by manufacturers for most boilers apply for elevations up to 2000 feet (600 m). For elevations above 2000 feet (600 m) ratings must be reduced by a rate of 4% for each 1000 feet (300 m) above sea level.

Example: If a boiler is rated at 610,000 Btu/hr. at sea level, to operate the boiler at 5000 feet (1500 m) it must be derated by 20% (4% x 5) to a new rating of 488,000 Btu/hr.

A. O. Smith does build some models specifically for high altitude service. Please check the rating plate before making changes.

The input reduction is primarily achieved by reducing the size of the main burner orifices. To do this, the main burner orifices require replacement with orifices sized for the particular installation elevation. When ordering, be sure to state the model number and the altitude of the location where the boiler is being installed.

Upon field deration of the boiler, adjustment to the gas pressure regulator is required. See CHECKING AND ADJUSTING THE INPUT in this manual for inlet and manifold pressure requirements. Also, due to the input rating reduction required at high altitudes, the output rating of the appliance is also reduced and should be compensated for in the sizing of the equipment for applications.

CONTROLS AND FUNCTION

AUTO RESET HIGH LIMIT

The high limit is a safety device wired in series with the ignition system. Set the high limit control to approximately 100F above the maximum designed system temperature. If the boiler outlet water temperature should exceed the high limit setting, the main gas valve will close but the circulator will continue to operate. Maximum adjustable setting is 1150C (239°F) cut-out with a 30C (50F) to 250C (450F) adjustable differential, see Figure 2.

3.Opens the pilot valve.

4.Discontinues ignition spark when the pilot flame is established. The S-8600 control used on propane gas models provides safety lockout if the pilot fails to ignite within the pilot flame establishing period. The S-8600 control used on natural gas models continues trial for ignition until pilot flame is established.

5.After proof of pilot flame, opens then main valve.

6.On a power loss, shuts the heater down. When power is restored it will begin a new ignition cycle.

7.On a loss of flame, shuts off main gas and starts trial for pilot ignition.

PLEASE SEE TROUBLESHOOTING SECTION FOR MORE INFORMATION.

FIGURE 2.

INTERMITTENT IGNITION CONTROL MODULE

The Honeywell S-8600 control module contains the electronic components of the system and also serves as a control wiring system for the controls mounted on the heater. The control module performs the following functions:

1.Checks for safe-start by sensing for a false flame condition on start-up.

2.Generates a potential of 15,000 volts for spark ignition of the pilot burner.

S-8600 INTERMITTENT IGNITION

CONTROL MODULE (IID)

FIGURE 3.

8

Image 8
Contents Models HW 300, 399, 420, 520, 610 Tennessee Waltz Parkway Ashland City, TNSafe INSTALLATION, USE and Service Important DefinitionsGeneral Safety Table of Contents Dimensions and Capacity Data Propane NaturalRecovery Capacities 27.7 33.3LIQUefied petroleum gas models High Altitude InstallationsIntroduction Controls and Function Manual Reset High Limit High Limit Switch Safety Flow SwitchThermal Balancer GPM LPMSafety Relief Valves Tank Temperature Control General ThermometersDrain Valve Not Supplied Required AbilityConfined Space S. Installations Canadian InstallationsAIR Requirements Unconfined SpaceInstallation Clearances Typical Boiler InstallationVenting LevelingVent Pipe Installation Connecting Boiler to a Common VentDraft Hood Vent ConnectionVenting System Venting Sidewall Optional Power Vent SystemMultiple Vent Table Combined Vent Sizing Tables Model HW-300 BoilerSystem Installations Conventional InstallationsLINEAR-TEMP Installations ONE Boiler Installed Independent of the Primary SystemNO. Suggested Items for Installation Schematic of the LINEAR-TEMPSYSTEMBoiler Inlet Outlet Sizes Minimum Branch Sizes to BoilersGAS Connections Purging and Sizing Correct GASExample Specific Multiplier GravityGAS Pressure Regulators Model Rated Manifold Pressure Number Input Natural PropaneWiring Wiring ConnectionsHW 300 to D. SystemSingle Stage I.I.D. Honeywell GAS Valve HW 300 thru 670. Natural and Propane GAS U.S. & CanadaLINEAR-TEMP Installations Boilers and Secondary Circulator are Controlled by Page Canadian MODELS, Junction BOX W/6 Terminals MODELS, Jucntion BOX W/4 TerminalsCanadian MODELS, Junction BOX W/6 Terminals Schematic MODELS, Junction BOX W/4 Terminals MODELS, Junction BOX W/4 Terminals Wiring Figures 16 and 17 on Pages 24 PipingCommercial Boiler with Vertical Tank USE this Table for Correct Pump and Water Pipe SizeCommercial Boiler with Horizontal Tank Wiring Figures 21 to 27 on Pages 28 to Commercial Boiler with Vertical TANK, CER-TEMPHW-300 HW-399 HW-420 HW-520 Three HW-520s, HW-610s or HW-670s UP-FLOW Model USE this Table for Correct Pump and Water Pipe Size Operation and START-UP Instructions Filling the SystemPilot and Main Burner Main BurnerPilot Burner Electronic Ignition Refer to Operating at Full Input or Full Capacity Checking and Adjusting the InputConsumption Rate Stage Main Burner Operation Flame Current Sensed For Your Safety Read Before Lighting SET T HE Thermostat to Lowwest Setting URN Pilo T Firing VA LVE CounterclockwiseRelief Valve General MaintenanceManual Reset High Limit Switch Continuity Test Cleaning and Flushing Instructions PRE-TROUBLESHOOTINGHOT Water Supply Boilers Preventive Maintenance Internal ContaminantsTroubleshooting CER-TEMP 80 Recovery System Checkout ProcedureYES Burner ignition problems? Is ceramic insulator surrounding the electrode in goodCondition not cracked or broken? Is there excessive draft conditions that may cause pilotMV & MV/PV? Replace pilot burner assembly LED Status and Troubleshooting Location of LEDs Flame LED YellowStatus LED Green OFFNo Call for Heat Not applicable None OFF Limited Warranty Conditions and Exceptions