G.Vertical Termination

1. Direct Vent Pipe

VERTICAL

TERMINATION

CAP

STORM

COLLAR

FLASHING

FIRESTOP

SUPPORT BOX

PIPE LENGTH

Figure 5.10

Step 1.

Check the installation instructions for required 1 in. (25mm) clearances (air space) to combustibles when passing through ceilings, walls, roofs, enclosures, attic rafters, or other nearby combustible surfaces. See page 17, Figure

5.16.Check the instructions below for maximum vertical rise of the venting system, and any maximum horizontal offset limitations. All offsets must fall within the set parameters of the vent graph (Figure 5.2) located on page 11.

NOTE: Maximum vertical rise allowable is 25 ft. (8m), Figure 5.11.

NOTE: Maximum number of 45° elbows permitted for a vertical installation is eight, provided their installation does not decrease maximum allowable horizontal run (as specified by vent graph, on page 11).

WARNING

Fire Risk. Explosion Risk.

Maintain vent clearance to combustibles as speci- fied.

Do not pack air space with insulation or other materials.

Failure to keep insulation or other materials away from vent pipe may cause fire.

25 ft. (8m)

MAXIMUM

Figure 5.11

Step 2.

Set the gas appliance in its desired location. Drop a plumb bob down from the ceiling to the position of the appliance flue exit, and mark the location where the vent will penetrate the ceiling. Drill a small hole at this point. Next, drop a plumb bob from the roof to the hole previously drilled in the ceiling, and mark the spot where the vent will penetrate the roof. Determine if ceiling joists, roof rafters, or other framing will obstruct the venting system. You may wish to relocate the appliance, or to offset, as shown in Figure 5.12 to avoid cutting loadbearing members.

Plumber’s Tape connected to Wall Strap

Wall Strap

Two 45˚ Elbows

Figure 5.12

August 1, 2008

Heat & Glo · Tiara Petite B · 7026-101K

Page 15

Image 15
Contents Installation and Operation What to do if you smell gasHot glass will cause burns Location Hang tag attached to rear of appliance CongratulationsTable of Contents 1Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Inspect Appliance & Components Design & Installation ConsiderationsGetting Started Tools and Supplies NeededAppliance Location and Clearances Selecting Appliance LocationClearances to Combustibles Vent Termination Minimum Clearances 4Termination LocationsAlcove Applications Measuring Standards Vent InformationVenting Components Use of ElbowsVenting Guidelines How to Use the Vent GraphStep Horizontal Termination203mm Vinyl Siding Direct Vent Pipe Vertical TerminationCeiling Joists Framing 2 in mm Long Wood Screws Twist-lock the vent cap and seal Level Cathedral Ceiling Support Box Cathedral CeilingClass a Metal Chimney Type D Hearth Mount Type C Up & Out InstallationType a & B Co-Axial to Co-Linear Existing Masonry ChimneyCut and bend flashing as needed to fit Sealant adhesive Flex Liner Flex Coupler Sheet Metal Screws Next Installing Slim Line Trim Ring and Heat ShieldSlim Line Wall Thimble Assembling Slim Line Trim Ring and Heat ShieldFIG. C Minimum Clearance Converting to LP Gas Wire clipGas Information Fuel ConversionsScrews Rubber Gasket Identification Label F Valve Regulator ReplacementGas Connection Gas PressuresHigh Altitude Installations Wire Size Max. Length Recommendation for WireConnecting to the Appliance Standing Pilot Ignition System WiringTo access the module Ignition Module Access and Battery ReplacementAppliance Setup Remove Shipping Materials Flue Restrictor InstallationLeg Leveling System Intake Damper Operation Positioning the Logs Intake Air Shutter AdjustmentMineral Wool AccessoriesKIT Contents Blower InstallationAugust 1 Heat & Glo · Tiara Petite B · 7026-101K 19 Complete Assembly Glass Replacement Warming Shelves InstallationOperating Instructions Before Lighting ApplianceControls Lighting Appliance For Your Safety Read Before LightingFrequently Asked Questions Initial Break-in ProcedureAfter Appliance is Lit Symptom Possible Cause Corrective Action TroubleshootingBe Placed in this Opening After servicing Maintaining and Servicing ApplianceNecessary. USE Caution When CLEANING/HANDLING Ceramic Burner Maintenance Tasks InspectReference Materials Appliance Dimension DiagramSL-D Series Vent Components Vent Components DiagramHHT SL-P Vent Components ListTermination Caps & Kits Description Tiara Petite BService Parts List cont’d. Tiara Petite B Tiara Petite B Cast Parts Individual Pieces Accessories Date of Service Performed By Description of Service Service and Maintenance LogLimited Lifetime Warranty Heat & GLO GAS Appliance Products Warranty PolicyTiara Petite B Contact InformationDealer Telephone