Heat & Glo LifeStyle TIARAP-CTO, TIARAP-CES, TIARAP-BK, TIARAP-BR Twist-lock the vent cap and seal

Page 17

Step 9.

Twist-lock the vent cap and seal.

Note: For multi-story vertical installations, a ceiling firestop is required at the second floor, and any subsequent floors (Figure 5.16). The opening should be framed to 10 in. x 10 in. (254mm x 254mm) inside dimensions, in the same manner as shown in Figure 5.13 on page 16.

NAILS

CEILING FIRES TOP

MIN. 1 in. (25mm)

CLEARANCE

MIN. 1 in. (25mm)

CLEARANCE

MIN. 1 in. (25mm)

CLEARANCE

MIN. 1 in. (25mm)

CLEARANCE

Figure 5.16

WARNING

Fire Risk.

Explosion Risk.

Any occupied areas above the first floor, including closets and storage spaces, which the vertical vent passed through must be enclosed. The enclosure may be framed and sheetrocked with standard construction materials; however, refer to these installation instructions for the minimum allowable clearance between the outside of the vent pipe and the combustible surfaces of the enclosure. Do not fill any of the required air space with insulation.

August 1, 2008

Heat & Glo · Tiara Petite B · 7026-101K

Page 17

Image 17
Contents Hot glass will cause burns Installation and OperationWhat to do if you smell gas Location Hang tag attached to rear of appliance CongratulationsTable of Contents 1Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Getting Started Design & Installation ConsiderationsTools and Supplies Needed Inspect Appliance & ComponentsClearances to Combustibles Appliance Location and ClearancesSelecting Appliance Location Vent Termination Minimum Clearances 4Termination LocationsAlcove Applications Venting Components Vent InformationUse of Elbows Measuring StandardsVenting Guidelines How to Use the Vent GraphStep Horizontal Termination203mm Vinyl Siding Direct Vent Pipe Vertical TerminationCeiling Joists Framing 2 in mm Long Wood Screws Twist-lock the vent cap and seal Level Cathedral Ceiling Support Box Cathedral CeilingClass a Metal Chimney Type a & B Co-Axial to Co-Linear Type C Up & Out InstallationExisting Masonry Chimney Type D Hearth MountCut and bend flashing as needed to fit Sealant adhesive Flex Liner Flex Coupler Sheet Metal Screws Slim Line Wall Thimble Installing Slim Line Trim Ring and Heat ShieldAssembling Slim Line Trim Ring and Heat Shield NextFIG. C Minimum Clearance Gas Information Wire clipFuel Conversions Converting to LP GasScrews Rubber Gasket Identification Label F Valve Regulator ReplacementGas Connection Gas PressuresHigh Altitude Installations Connecting to the Appliance Recommendation for WireStanding Pilot Ignition System Wiring Wire Size Max. LengthTo access the module Ignition Module Access and Battery ReplacementLeg Leveling System Appliance SetupRemove Shipping Materials Flue Restrictor Installation Intake Damper Operation Positioning the Logs Intake Air Shutter AdjustmentMineral Wool AccessoriesKIT Contents Blower InstallationAugust 1 Heat & Glo · Tiara Petite B · 7026-101K 19 Complete Assembly Glass Replacement Warming Shelves InstallationControls Operating InstructionsBefore Lighting Appliance Lighting Appliance For Your Safety Read Before LightingAfter Appliance is Lit Frequently Asked QuestionsInitial Break-in Procedure Symptom Possible Cause Corrective Action TroubleshootingBe Placed in this Opening After servicing Maintaining and Servicing ApplianceNecessary. USE Caution When CLEANING/HANDLING Ceramic Burner Maintenance Tasks InspectReference Materials Appliance Dimension DiagramSL-D Series Vent Components Vent Components DiagramHHT SL-P Vent Components ListTermination Caps & Kits Description Tiara Petite BService Parts List cont’d. Tiara Petite B Tiara Petite B Cast Parts Individual Pieces Accessories Date of Service Performed By Description of Service Service and Maintenance LogLimited Lifetime Warranty Heat & GLO GAS Appliance Products Warranty PolicyDealer Telephone Tiara Petite BContact Information