Heat & Glo LifeStyle TIARAP-CES, TIARAP-CTO, TIARAP-BK, TIARAP-BR owner manual Complete Assembly

Page 36

 

 

VARIABLE SPEED CONTROL

 

 

BLACK

 

BLACK

JUNCTION BOX

 

 

 

 

 

BLACK

BLACK

 

BLACK

 

BLOWER RECEPTACLE

BLACK

 

 

BLACK

WHITE

BLACK

BLACK

 

 

BLACK

 

 

 

 

 

 

WHITE

 

 

 

 

 

TEMPERATURE SENSOR SWITCH

 

 

GROUND

 

 

 

BLACK

 

GREEN

BLOWER

 

 

 

WHITE

 

 

 

 

 

 

 

 

110 - 120 VAC

 

 

 

 

POWER SUPPLY

 

Figure 8.19 Complete Assembly

 

 

 

 

Page 36

Heat & Glo · Tiara Petite B · 7026-101K

August 1, 2008

Image 36
Contents Installation and Operation What to do if you smell gasHot glass will cause burns Congratulations Location Hang tag attached to rear of applianceTable of Contents 1Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Design & Installation Considerations Getting StartedTools and Supplies Needed Inspect Appliance & ComponentsAppliance Location and Clearances Selecting Appliance LocationClearances to Combustibles 4Termination Locations Vent Termination Minimum ClearancesAlcove Applications Vent Information Venting ComponentsUse of Elbows Measuring StandardsHow to Use the Vent Graph Venting GuidelinesHorizontal Termination Step203mm Vinyl Siding Vertical Termination Direct Vent PipeCeiling Joists Framing 2 in mm Long Wood Screws Twist-lock the vent cap and seal Cathedral Ceiling Level Cathedral Ceiling Support BoxClass a Metal Chimney Type C Up & Out Installation Type a & B Co-Axial to Co-LinearExisting Masonry Chimney Type D Hearth MountCut and bend flashing as needed to fit Sealant adhesive Flex Liner Flex Coupler Sheet Metal Screws Installing Slim Line Trim Ring and Heat Shield Slim Line Wall ThimbleAssembling Slim Line Trim Ring and Heat Shield NextFIG. C Minimum Clearance Wire clip Gas InformationFuel Conversions Converting to LP GasValve Regulator Replacement Screws Rubber Gasket Identification Label FGas Pressures Gas ConnectionHigh Altitude Installations Recommendation for Wire Connecting to the ApplianceStanding Pilot Ignition System Wiring Wire Size Max. LengthIgnition Module Access and Battery Replacement To access the moduleAppliance Setup Remove Shipping Materials Flue Restrictor InstallationLeg Leveling System Intake Air Shutter Adjustment Intake Damper Operation Positioning the LogsAccessories Mineral WoolBlower Installation KIT ContentsAugust 1 Heat & Glo · Tiara Petite B · 7026-101K 19 Complete Assembly Warming Shelves Installation Glass ReplacementOperating Instructions Before Lighting ApplianceControls For Your Safety Read Before Lighting Lighting ApplianceFrequently Asked Questions Initial Break-in ProcedureAfter Appliance is Lit Troubleshooting Symptom Possible Cause Corrective ActionBe Placed in this Opening Maintaining and Servicing Appliance After servicingMaintenance Tasks Inspect Necessary. USE Caution When CLEANING/HANDLING Ceramic BurnerAppliance Dimension Diagram Reference MaterialsVent Components Diagram SL-D Series Vent ComponentsVent Components List HHT SL-PTermination Caps & Kits Tiara Petite B DescriptionService Parts List cont’d. Tiara Petite B Tiara Petite B Cast Parts Individual Pieces Accessories Service and Maintenance Log Date of Service Performed By Description of ServiceWarranty Policy Limited Lifetime Warranty Heat & GLO GAS Appliance ProductsTiara Petite B Contact InformationDealer Telephone