Heat & Glo LifeStyle TIARAP-CTO, TIARAP-CES, TIARAP-BK, TIARAP-BR owner manual 203mm

Page 13

Step 3.

For installations using a round support box/wall thimble (check pipe manufacturer's instructions), mark the wall for a 10 in. x 10 in. (254mm x 254mm) square hole. The center of the square hole should line up with the center line of the horizontal pipe, as shown in Figure 5.5. Cut and frame the hole in the exterior wall where the vent will be terminated. If the wall being penetrated is constructed of noncombustible material, i.e. masonry block or concrete, a 7 in. (178mm) diameter hole is acceptable.

Step 4.

Position the horizontal termination cap in the center of the 10 in. x 10 in. (254mm x 254mm) square hole and run a bead of non-hardening mastic around its outside edges, so as to make a seal between it and the wall, attach termination cap to the exterior wall with the four wood screws provided. The arrow on the vent cap should be pointing up (Figure 5.6).

WOOD

SCREW

CENTER

LINE

WALL

THIMBLE

CENTER OF HOLE

CENTER LINE

HOT

WALL THIMBLE

Figure 5.6

NOTES:

Figure 5.5

NOTE:

(1)Installation requires a minimum of 6 in. (152mm) horizontal run of vent with a 1/4 in. (6mm) rise run towards the termination. Each 1 ft. (305mm) of horizontal venting must include a 1/4 in. (6mm) rise. Never allow the vent to run downward. This could cause high temperatures and may present the possibility of a fire.

(2)The location of the horizontal vent termination on an exterior wall must meet all local and national building codes, and must not be easily blocked or obstructed, see Figure 4.4 on page 9.

(3)For installations requiring a vertical rise on the exterior of the building, a snorkel kit is available with a 14 in. (356mm) and a 36 in. (914mm) tall snorkel termination cap. Follow the same installation procedures as used for standard horizontal terminations. If the snorkel termination must be installed below grade (i.e. basement application), proper drainage must be provided to prevent water from entering the snorkel termination. Do not backfill around snorkel termination.

(1)The four wood screws provided should be replaced with appropriate fasteners for stucco, brick, concrete, or other types of sidings.

(2)A termination cap with a built-in vinyl siding standoff is highly recommended on a building with vinyl siding. The pilot hole will be 2 in. (51mm) closer to the bottom of the square than the top. Using a framing square, draw a 14 in. x 14 in. (356mm x 356mm) square around the pilot hole in the siding. See Figure 5.7.

8 in.

 

(203mm)

 

 

7 in.

 

(178mm)

7 in.

6 in.

(178mm)

 

(152mm)

Figure 5.7

August 1, 2008

Heat & Glo · Tiara Petite B · 7026-101K

Page 13

Image 13
Contents What to do if you smell gas Installation and OperationHot glass will cause burns Location Hang tag attached to rear of appliance CongratulationsTable of Contents 1Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Getting Started Design & Installation ConsiderationsTools and Supplies Needed Inspect Appliance & ComponentsSelecting Appliance Location Appliance Location and ClearancesClearances to Combustibles Vent Termination Minimum Clearances 4Termination LocationsAlcove Applications Venting Components Vent InformationUse of Elbows Measuring StandardsVenting Guidelines How to Use the Vent GraphStep Horizontal Termination203mm Vinyl Siding Direct Vent Pipe Vertical TerminationCeiling Joists Framing 2 in mm Long Wood Screws Twist-lock the vent cap and seal Level Cathedral Ceiling Support Box Cathedral CeilingClass a Metal Chimney Type a & B Co-Axial to Co-Linear Type C Up & Out InstallationExisting Masonry Chimney Type D Hearth MountCut and bend flashing as needed to fit Sealant adhesive Flex Liner Flex Coupler Sheet Metal Screws Slim Line Wall Thimble Installing Slim Line Trim Ring and Heat ShieldAssembling Slim Line Trim Ring and Heat Shield NextFIG. C Minimum Clearance Gas Information Wire clipFuel Conversions Converting to LP GasScrews Rubber Gasket Identification Label F Valve Regulator ReplacementGas Connection Gas PressuresHigh Altitude Installations Connecting to the Appliance Recommendation for WireStanding Pilot Ignition System Wiring Wire Size Max. LengthTo access the module Ignition Module Access and Battery ReplacementRemove Shipping Materials Flue Restrictor Installation Appliance SetupLeg Leveling System Intake Damper Operation Positioning the Logs Intake Air Shutter AdjustmentMineral Wool AccessoriesKIT Contents Blower InstallationAugust 1 Heat & Glo · Tiara Petite B · 7026-101K 19 Complete Assembly Glass Replacement Warming Shelves InstallationBefore Lighting Appliance Operating InstructionsControls Lighting Appliance For Your Safety Read Before LightingInitial Break-in Procedure Frequently Asked QuestionsAfter Appliance is Lit Symptom Possible Cause Corrective Action TroubleshootingBe Placed in this Opening After servicing Maintaining and Servicing ApplianceNecessary. USE Caution When CLEANING/HANDLING Ceramic Burner Maintenance Tasks InspectReference Materials Appliance Dimension DiagramSL-D Series Vent Components Vent Components DiagramHHT SL-P Vent Components ListTermination Caps & Kits Description Tiara Petite BService Parts List cont’d. Tiara Petite B Tiara Petite B Cast Parts Individual Pieces Accessories Date of Service Performed By Description of Service Service and Maintenance LogLimited Lifetime Warranty Heat & GLO GAS Appliance Products Warranty PolicyContact Information Tiara Petite BDealer Telephone