2. Cathedral Ceiling

Step 1.

Follow installation Steps 1 and 2 under vertical installation section, page 15.

Step 2.

Remove shingles or other roof covering as necessary to cut the rectangular hole for the support box. Cut the hole 1/8 in. (3mm) larger than the support box outline.

Step 3.

Lower the support box through the hole in the roof until the bottom of the support box protrudes at least 2 in. (51mm) below the ceiling (Figure 5.17). Align the support box both vertically and horizontally with a level. Temporarily tack the support box in place through the inside walls and into the roof sheathing.

Figure 5.18

Level

Cathedral Ceiling

Support Box

2 in. (51mm) Min. below finished ceiling

Cut hole 1/8 in. (3mm) greater in size than pattern of support box as it is projected onto roof line

Figure 5.17

Step 4.

Using tin snips, cut the support box from the top corners down to the roofline, and fold the resulting flaps over the roof sheathing (Figure 5.18). Before nailing it to the roof, run a bead of non-hardening mastic around the top edges of the support box to make a seal between it and the roof. Clean out any combustible material from inside the support box.

Step 5.

Assemble the desired lengths of pipe and elbows necessary to reach from the appliance up through the round support box. Ensure that all pipe and elbow connections are in their fully twist-locked position. Assemble as instructed.

Step 6.

Place the support clamp (provided with the support box) inside the support box (at the bottom), and secure to the pipe section. The clamp allows the support box to support the weight of the pipe sections. Continue to add pipe sections until you are above the roofline.

Step 7.

Complete the cathedral ceiling installation by following the same procedures outlined in steps 7 through 9 for vertical installations, pages 16-17.

Step 8.

Install the black trim collar around the outside of the cathedral ceiling support box (Figure 5.19). The two pieces of the trim collar slide over one another to allow for easy adjustment around the support box. Using the six screws provided, secure the four corners and the overlapping sections of the trim collar to the ceiling. You may want to predrill the holes for the overlapped sections for ease of installation.

Trim Collar

Cathedral

Ceiling

Support Screws

Box

Figure 5.19

Page 18

Heat & Glo · Tiara Petite B · 7026-101K

August 1, 2008

Image 18
Contents Installation and Operation What to do if you smell gasHot glass will cause burns Congratulations Location Hang tag attached to rear of applianceTable of Contents 1Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Tools and Supplies Needed Design & Installation ConsiderationsGetting Started Inspect Appliance & ComponentsAppliance Location and Clearances Selecting Appliance LocationClearances to Combustibles 4Termination Locations Vent Termination Minimum ClearancesAlcove Applications Use of Elbows Vent InformationVenting Components Measuring StandardsHow to Use the Vent Graph Venting GuidelinesHorizontal Termination Step203mm Vinyl Siding Vertical Termination Direct Vent PipeCeiling Joists Framing 2 in mm Long Wood Screws Twist-lock the vent cap and seal Cathedral Ceiling Level Cathedral Ceiling Support BoxClass a Metal Chimney Existing Masonry Chimney Type C Up & Out InstallationType a & B Co-Axial to Co-Linear Type D Hearth MountCut and bend flashing as needed to fit Sealant adhesive Flex Liner Flex Coupler Sheet Metal Screws Assembling Slim Line Trim Ring and Heat Shield Installing Slim Line Trim Ring and Heat ShieldSlim Line Wall Thimble NextFIG. C Minimum Clearance Fuel Conversions Wire clipGas Information Converting to LP GasValve Regulator Replacement Screws Rubber Gasket Identification Label FGas Pressures Gas ConnectionHigh Altitude Installations Standing Pilot Ignition System Wiring Recommendation for WireConnecting to the Appliance Wire Size Max. LengthIgnition Module Access and Battery Replacement To access the moduleAppliance Setup Remove Shipping Materials Flue Restrictor InstallationLeg Leveling System Intake Air Shutter Adjustment Intake Damper Operation Positioning the LogsAccessories Mineral WoolBlower Installation KIT ContentsAugust 1 Heat & Glo · Tiara Petite B · 7026-101K 19 Complete Assembly Warming Shelves Installation Glass ReplacementOperating Instructions Before Lighting ApplianceControls For Your Safety Read Before Lighting Lighting ApplianceFrequently Asked Questions Initial Break-in ProcedureAfter Appliance is Lit Troubleshooting Symptom Possible Cause Corrective ActionBe Placed in this Opening Maintaining and Servicing Appliance After servicingMaintenance Tasks Inspect Necessary. USE Caution When CLEANING/HANDLING Ceramic BurnerAppliance Dimension Diagram Reference MaterialsVent Components Diagram SL-D Series Vent ComponentsVent Components List HHT SL-PTermination Caps & Kits Tiara Petite B DescriptionService Parts List cont’d. Tiara Petite B Tiara Petite B Cast Parts Individual Pieces Accessories Service and Maintenance Log Date of Service Performed By Description of ServiceWarranty Policy Limited Lifetime Warranty Heat & GLO GAS Appliance ProductsTiara Petite B Contact InformationDealer Telephone