Delta PG PLUS-25 warranty Table of Contents

Page 2

Table of Contents

PRODUCT AND SAFETY INFORMATION

Definitions. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1

Product Warnings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-3

Operating Restrictions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4

Code Restrictions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4

SECTION I - PRE-INSTALLATION ITEMS

Code Compliance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5

Determining Product Location . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5

Boiler Replacement. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5

Recommended Clearances . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-6

Flooring and Foundation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6

Residential Garage Installations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6

SECTION II - COMBUSTION AIR AND VENTING

Combustion Air Contamination . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 Combustion Air Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 Outside Combustion Air . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 Air Openings. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 Methods of Accessing Combustion Air into a Space . . . . . . . . . . . . . . . . . . 8-10 Vent System . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 Removal of an Existing Boiler from a Common Vent System . . . . . . . . . . 11

SECTION III - UNIT PREPARATION

Handling Instructions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12

Hydrostatic Pressure Test

Hydrostatic Test Preparation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12

Hydrostatic Test Procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-13

Completion of Hydrostatic Test and Draining . . . . . . . . . . . . . . . . . 13

SECTION IV - DOMESTIC PIPING

General Piping Requirements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14

Domestic Supply Pressure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14

Thermal Expansion. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14

Water Hammer . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14

Temperature / Pressure Relief Valve . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-15

Thermostatic Mixing Valve . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15

i

Image 2
Contents For Your Safety PG PLUS-25/30/35/40 Gas Fired Combination HeatersTable of Contents Section VI Vent / Combustion AIR Installation Section V Primary PipingSection VII GAS Piping Section Viii Internal WiringSection IX External Wiring Section X START-UP PreparationSection Xiii CHECK-OUT Procedures Section XI START-UP ProceduresSection XII Temperature Limits Section XIV Installation RecordSection Xvii Replacement Parts Product SpecificationsProduct & Safety Information To Protect Against Excessive Temperature and Pressure Homeowner What to do if YOU Smell GASDo not try to light any appliance Operating Restrictions Code Compliance Pre-Installation Items Section I Pre-Installation ItemsBoiler Replacement Determining Product LocationPre-Installation Items Residential Garage InstallationsCombustion Air and Venting Section II Combustion Air VentingCombustion Air Requirements Methods of Accessing Combustion Air Into a SpaceCombustion Air and Venting Air OpeningsOutdoor Combustion Air Equipment Located in Confined Spaces One Permanent Air InletCombination of Indoor and Outdoor Combustion Air Vent SystemRemoval of an Existing Boiler f rom a Common Vent System Handling Instructions Hydrostatic Test ProceduresUnit Preparation Section III Unit Preparation Hydrostatic Pressure TestUnit Preparation Completion of Hydrostatic Test and DrainingDomestic Piping Section IV Domestic Piping Domestic Piping Multiple Units Installation Mixing Valve AssemblyDomestic Piping Diagrams TR/SMART Series ApplicationPerformance Plus With Recirculation Performance Plus with Storage Tank Primary Piping Section V Primary Piping System Piping Zone Circulators Primary PipingCloset Zero Clearance Applications Sizing Primary PipingSystem Piping Radiant Heating with Mixing Valve Personal injury, death or substantial property damagePrimary Piping Near Appliance Piping Primary piping Zoning with Circulators Primary Piping Low Temperature Radiant System Primary Piping Venting and Combustion Air Installation Section VI Venting General RequirementsVenting and Combustion Air Installation Category IV Vent Termination ClearancesVenting Option Non Direct Vent / Vertical Multiple Vent TerminationsLocating the Combustion Air Inlet Venting Option Direct Vent / Vertical Venting Option Non-Direct Vent / HorizontalVenting Option Direct Vent / Horizontal Horizontal Wall Thimble KitDetermining Piping Lengths Excessive Horizontal Vent RunsVent Appliance Adapters Allowable Equivalent Length Combined Vent and Combustion Air Standard Horizontal Venting Installation Location of Air Inlet Termination Venting and Combustion Air Installation Section VII Gas Piping Recommended Gas Supply PipingNatural Gas Supply Pressure Requirements Natural GASPipe Sizing Natural Gas Propane Gas Supply Pressure Requirements Propane GASPipe Sizing Propane Gas Internal Wiring Section Viii Internal Wiring Wiring must be N.E.C ClassInternal Wiring Factory Wiring SchematicFactory Internal Wiring Outdoor Temperature Limit External Wiring Section IX External WiringInstallation Compliance Line Voltage ConnectionsExternal Wiring Multiple Zone Field Wiring Using Zone ValvesField wiring with zone circulators Typical Zone Relay Panel Wiring Section X Start Up Preparation Performance PlusFilling the Outer Primary Tank and System Check Low Water Cut-Off Device Check Thermostat Circuit Verify Correct Pressure SwitchAir Shutter Settings Performance Plus Start-up Start-Up ProceduresFinal Checks Before Start-up If Performance Plus Does Not Start CorrectlyOr loss of life For Your Safety Read Before LightingFollowing instructions must be followed exactly, a fire or Operating InstructionsNatural Gas Propane Temperature Limits Section XII Temperature Limits Recommended Secondary Thermostat SettingTemperature Limits Section XIII- Check-Out Procedures Section XIV Installation Record Owner Maintenance Section XV Maintenance ScheduleService Technician GeneralInspect the Burner Area Section XVI Maintenance ProceduresCheck the Surrounding Area Check Domestic System Check Combustion/ Ventilation Air OpeningsInspect Vent System and Combustion Air Piping Check Expansion TankCheck Control Wiring Check Temperature / Pressure Relief ValveCheck Ignition Wiring and Ground Wiring Check Thermostat Limit SettingsReview With Owner Check Burner Flame Flame SignalCheck Combustion Levels Section Xvii Replacement Parts Jacket Components Control Panel Components Electrical Panel Components Burner Components Specifications Graph 1 Performance Plus Pressure Loss Primary Side TTP Brazed Plate Heat Exchangers Maxi-flo Pool and Spa Heat Exchangers