Venting and Combustion Air Installation

Venting Option - Direct Vent / Horizontal

In this vent application the PERFORMANCE PLUS is vented horizontally through a wall using only approved 3-inch stainless steel vent material and using outside air for combustion.

The installer should consider the following when choosing this vent option:

a.The vent system should contain a con- densate trap located near the unit as shown in Figs. 22, 22A& 22B, page 34.

b.The vent system must pitch back to the unit 1/4 inch per foot.

BEST PRACTICE

Although the vent system is allowed to pitch away from the unit, it is recom- mended that the vent system pitches toward the unit with a condensate drain installed as close to the unit as possible. Opting to pitch the vent system away poses potential damage to the building exterior or to the surrounding landscape and/or potential risks of icing if conden- sate is formed.

c.Penetration at the wall requires a thimble.

d.Clearance to combustibles must be maintained per the vent manufacturer’s requirements. Refer to the vent manu- facturer’s installation instructions for additional details.

NOTICE

Maintain a minimum 2-inch clearance to combustible wall and 1-inch clearance to non-combustible in the absence of a manufacturer’s recommended clearance when penetrating a sidewall.

e.For a zero clearance concentric termina- tion of the vent and combustion air refer to the Horizontal Concentric, Horizontal Single Wall Vent or Horizontal Wall Thimble Kits.

There are two methods available for Direct Venting - Horizontal:

Separate: The vent and the combustion air inlet are run together and exit the structure sep- arately with different terminations. See Fig. 23, page 35.

NOTICE

The combustion air inlet and the vent termination must reside in the same pressure zone area of the building for proper operation of the appliance.

Combination: The vent and combustion air ter- minate at a single concentric point using the Horizontal Concentric, Horizontal Single Wall Vent or Horizontal Wall Thimble Kit. See Figs. 22, 22A & 22B page 34.

Horizontal Wall Thimble Kit

- Requires a 5 1/2 inch x 5 1/2 inch penetra- tion through any type of wall.

-Allows zero clearance at the wall penetration.

-Maximum wall thickness is 11 inches.

-The use of a termination elbow for the venting system is not recommended when using the Horizontal Wall Thimble Kit.

BEST PRACTICES

To prevent potential nuisance lock-outs or flue gas recirculation it is recom- mended to terminate the vent with a hor- izontal termination tee or side discharge vent hood.

31

Image 37
Contents PG PLUS-25/30/35/40 Gas Fired Combination Heaters For Your SafetyTable of Contents Section V Primary Piping Section VI Vent / Combustion AIR InstallationSection IX External Wiring Section Viii Internal WiringSection VII GAS Piping Section X START-UP PreparationSection XII Temperature Limits Section XI START-UP ProceduresSection Xiii CHECK-OUT Procedures Section XIV Installation RecordProduct Specifications Section Xvii Replacement PartsProduct & Safety Information To Protect Against Excessive Temperature and Pressure Do not try to light any appliance What to do if YOU Smell GASHomeowner Operating Restrictions Boiler Replacement Pre-Installation Items Section I Pre-Installation ItemsCode Compliance Determining Product LocationResidential Garage Installations Pre-Installation ItemsVenting Combustion Air and Venting Section II Combustion AirCombustion Air and Venting Methods of Accessing Combustion Air Into a SpaceCombustion Air Requirements Air OpeningsEquipment Located in Confined Spaces One Permanent Air Inlet Outdoor Combustion AirVent System Combination of Indoor and Outdoor Combustion AirRemoval of an Existing Boiler f rom a Common Vent System Unit Preparation Section III Unit Preparation Hydrostatic Test ProceduresHandling Instructions Hydrostatic Pressure TestCompletion of Hydrostatic Test and Draining Unit PreparationDomestic Piping Section IV Domestic Piping Domestic Piping Mixing Valve Assembly Multiple Units InstallationTR/SMART Series Application Domestic Piping DiagramsPerformance Plus With Recirculation Performance Plus with Storage Tank Primary Piping Section V Primary Piping Closet Zero Clearance Applications Primary PipingSystem Piping Zone Circulators Sizing Primary PipingPersonal injury, death or substantial property damage System Piping Radiant Heating with Mixing ValvePrimary Piping Near Appliance Piping Primary piping Zoning with Circulators Primary Piping Low Temperature Radiant System Primary Piping General Requirements Venting and Combustion Air Installation Section VI VentingCategory IV Vent Termination Clearances Venting and Combustion Air InstallationLocating the Combustion Air Inlet Multiple Vent TerminationsVenting Option Non Direct Vent / Vertical Venting Option Non-Direct Vent / Horizontal Venting Option Direct Vent / VerticalHorizontal Wall Thimble Kit Venting Option Direct Vent / HorizontalVent Appliance Adapters Excessive Horizontal Vent RunsDetermining Piping Lengths Allowable Equivalent Length Combined Vent and Combustion Air Standard Horizontal Venting Installation Location of Air Inlet Termination Venting and Combustion Air Installation Recommended Gas Supply Piping Section VII Gas PipingPipe Sizing Natural Gas Natural GASNatural Gas Supply Pressure Requirements Pipe Sizing Propane Gas Propane GASPropane Gas Supply Pressure Requirements Wiring must be N.E.C Class Internal Wiring Section Viii Internal WiringFactory Wiring Schematic Internal WiringFactory Internal Wiring Installation Compliance External Wiring Section IX External WiringOutdoor Temperature Limit Line Voltage ConnectionsMultiple Zone Field Wiring Using Zone Valves External WiringField wiring with zone circulators Typical Zone Relay Panel Wiring Performance Plus Section X Start Up PreparationFilling the Outer Primary Tank and System Check Low Water Cut-Off Device Air Shutter Settings Verify Correct Pressure SwitchCheck Thermostat Circuit Final Checks Before Start-up Start-Up ProceduresPerformance Plus Start-up If Performance Plus Does Not Start CorrectlyFollowing instructions must be followed exactly, a fire or For Your Safety Read Before LightingOr loss of life Operating InstructionsNatural Gas Propane Recommended Secondary Thermostat Setting Temperature Limits Section XII Temperature LimitsTemperature Limits Section XIII- Check-Out Procedures Section XIV Installation Record Service Technician Section XV Maintenance ScheduleOwner Maintenance GeneralCheck the Surrounding Area Section XVI Maintenance ProceduresInspect the Burner Area Inspect Vent System and Combustion Air Piping Check Combustion/ Ventilation Air OpeningsCheck Domestic System Check Expansion TankCheck Ignition Wiring and Ground Wiring Check Temperature / Pressure Relief ValveCheck Control Wiring Check Thermostat Limit SettingsCheck Combustion Levels Check Burner Flame Flame SignalReview With Owner Section Xvii Replacement Parts Jacket Components Control Panel Components Electrical Panel Components Burner Components Specifications Graph 1 Performance Plus Pressure Loss Primary Side Maxi-flo Pool and Spa Heat Exchangers TTP Brazed Plate Heat Exchangers