Delta PG PLUS-25 warranty Domestic Piping

Page 21

Domestic Piping

The installer must install discharge piping onto the T&P relief valve. The discharge piping must be:

Made of material serviceable for tem- peratures of 250ºF or greater.

Directed so that any hot water dis- charge flows away from all persons.

Directed to a suitable place of drainage.

Installed as to allow complete draining of the T&P relief valve and the dis- charge piping.

Terminated with a plain end, not with threads.

CAUTION

Failure to properly direct the discharge piping of the T&P relief valve may result in flooding of the area adjacent to the unit and or lower floors in the structure causing substantial property damage.

The installer must not install the T&P relief valve discharge piping in a manner that is:

Excessively long: Using more than 2 elbows and/or 15 feet of discharge pip- ing can reduce the discharge capacity.

Terminated directly into a drain: The discharge piping must terminate within 6 inches of the drain. Check with local plumbing codes for termination guide- lines.

The discharge piping is plugged, reduced in size or restricted in any manner.

The discharge piping is subject to freezing.

WARNING

DO NOT install any valves between the T&P relief valve and the discharge pip- ing. DO NOT plug the T&P relief valve or the discharge piping. Improper place- ment and piping of the T&P relief valve can cause severe personal injury, death or substantial property damage.

Thermostatic Mixing Valve

The PERFORMANCE PLUS contains a facto- ry installed thermostatic mixing valve with built-in check valve.

The operating range of the thermostatic mixing is 90ºF to 120ºF.

For applications with a domestic recirculation loop, the recirculation pump should be con- trolled by an aquastat. The maximum recom- mended setting of the aquastat is 10ºF lower than the thermostatic mixing valve setting.

DANGER

For proper operation of the thermostatic mixing valve and to prevent potential scalding hazards, the recirculation loop should be controlled by an aquastat. DO NOT use continuous recirculation.

U-Tube Assembly

The PERFORMANCE PLUS is supplied with a U-Tube Assembly that directs cold water to the thermostatic mixing valve.

To install the U-Tube Assembly the installer must:

1.Disconnect the cold inlet adapter/union from the thermostatic mixing valve.

2.Using needle-nose pliers remove the plastic check valve assembly from the adapter.

15

Image 21
Contents PG PLUS-25/30/35/40 Gas Fired Combination Heaters For Your SafetyTable of Contents Section V Primary Piping Section VI Vent / Combustion AIR InstallationSection IX External Wiring Section Viii Internal WiringSection VII GAS Piping Section X START-UP PreparationSection XII Temperature Limits Section XI START-UP ProceduresSection Xiii CHECK-OUT Procedures Section XIV Installation RecordProduct Specifications Section Xvii Replacement PartsProduct & Safety Information To Protect Against Excessive Temperature and Pressure What to do if YOU Smell GAS Do not try to light any applianceHomeowner Operating Restrictions Boiler Replacement Pre-Installation Items Section I Pre-Installation ItemsCode Compliance Determining Product LocationResidential Garage Installations Pre-Installation ItemsVenting Combustion Air and Venting Section II Combustion AirCombustion Air and Venting Methods of Accessing Combustion Air Into a SpaceCombustion Air Requirements Air OpeningsEquipment Located in Confined Spaces One Permanent Air Inlet Outdoor Combustion AirVent System Combination of Indoor and Outdoor Combustion AirRemoval of an Existing Boiler f rom a Common Vent System Unit Preparation Section III Unit Preparation Hydrostatic Test ProceduresHandling Instructions Hydrostatic Pressure TestCompletion of Hydrostatic Test and Draining Unit PreparationDomestic Piping Section IV Domestic Piping Domestic Piping Mixing Valve Assembly Multiple Units InstallationTR/SMART Series Application Domestic Piping DiagramsPerformance Plus With Recirculation Performance Plus with Storage Tank Primary Piping Section V Primary Piping Closet Zero Clearance Applications Primary PipingSystem Piping Zone Circulators Sizing Primary PipingPersonal injury, death or substantial property damage System Piping Radiant Heating with Mixing ValvePrimary Piping Near Appliance Piping Primary piping Zoning with Circulators Primary Piping Low Temperature Radiant System Primary Piping General Requirements Venting and Combustion Air Installation Section VI VentingCategory IV Vent Termination Clearances Venting and Combustion Air InstallationMultiple Vent Terminations Locating the Combustion Air InletVenting Option Non Direct Vent / Vertical Venting Option Non-Direct Vent / Horizontal Venting Option Direct Vent / VerticalHorizontal Wall Thimble Kit Venting Option Direct Vent / HorizontalExcessive Horizontal Vent Runs Vent Appliance AdaptersDetermining Piping Lengths Allowable Equivalent Length Combined Vent and Combustion Air Standard Horizontal Venting Installation Location of Air Inlet Termination Venting and Combustion Air Installation Recommended Gas Supply Piping Section VII Gas PipingNatural GAS Pipe Sizing Natural GasNatural Gas Supply Pressure Requirements Propane GAS Pipe Sizing Propane GasPropane Gas Supply Pressure Requirements Wiring must be N.E.C Class Internal Wiring Section Viii Internal WiringFactory Wiring Schematic Internal WiringFactory Internal Wiring Installation Compliance External Wiring Section IX External WiringOutdoor Temperature Limit Line Voltage ConnectionsMultiple Zone Field Wiring Using Zone Valves External WiringField wiring with zone circulators Typical Zone Relay Panel Wiring Performance Plus Section X Start Up PreparationFilling the Outer Primary Tank and System Check Low Water Cut-Off Device Verify Correct Pressure Switch Air Shutter SettingsCheck Thermostat Circuit Final Checks Before Start-up Start-Up ProceduresPerformance Plus Start-up If Performance Plus Does Not Start CorrectlyFollowing instructions must be followed exactly, a fire or For Your Safety Read Before LightingOr loss of life Operating InstructionsNatural Gas Propane Recommended Secondary Thermostat Setting Temperature Limits Section XII Temperature LimitsTemperature Limits Section XIII- Check-Out Procedures Section XIV Installation Record Service Technician Section XV Maintenance ScheduleOwner Maintenance GeneralSection XVI Maintenance Procedures Check the Surrounding AreaInspect the Burner Area Inspect Vent System and Combustion Air Piping Check Combustion/ Ventilation Air OpeningsCheck Domestic System Check Expansion TankCheck Ignition Wiring and Ground Wiring Check Temperature / Pressure Relief ValveCheck Control Wiring Check Thermostat Limit SettingsCheck Burner Flame Flame Signal Check Combustion LevelsReview With Owner Section Xvii Replacement Parts Jacket Components Control Panel Components Electrical Panel Components Burner Components Specifications Graph 1 Performance Plus Pressure Loss Primary Side Maxi-flo Pool and Spa Heat Exchangers TTP Brazed Plate Heat Exchangers