Delta PG PLUS-25 warranty To Protect Against Excessive Temperature and Pressure

Page 8

Product & Safety Information

WARNING

Bacteria can develop in the domestic water system if certain minimum water temperatures are not maintained.

DANGER

Water temperature over 125ºF can cause severe burns instantly or death from scalds.

Children, disabled and elderly are at highest risk of being scalded.

-Never leave them unattended in or near shower, bathtub or sink.

-Never allow small children to use a hot water faucet or draw their own bath.

If any one using hot water in the building fits this description or codes require spe- cific water temperatures at hot water faucet, we recommend:

a)ensure the factory installed thermosta- tic mixing valve is working properly.

b)to set the thermostatic mixing valve for the lowest temperature which sat- isfies your hot water need.

CAUTION

.

Protection must be taken against excessive temperature and pressure!

TO PROTECT AGAINST EXCESSIVE TEMPERATURE AND PRESSURE

Check if the Temperature and Pressure (T&P) relief valve is in the location provided. (Domestic Water)

Check if the 30 psi relief valve sup- plied is in the location provided. (Primary water)

To avoid injury, install the relief devices to comply with local code requirements.

2

Image 8
Contents For Your Safety PG PLUS-25/30/35/40 Gas Fired Combination HeatersTable of Contents Section VI Vent / Combustion AIR Installation Section V Primary PipingSection Viii Internal Wiring Section IX External WiringSection VII GAS Piping Section X START-UP PreparationSection XI START-UP Procedures Section XII Temperature LimitsSection Xiii CHECK-OUT Procedures Section XIV Installation RecordSection Xvii Replacement Parts Product SpecificationsProduct & Safety Information To Protect Against Excessive Temperature and Pressure Homeowner What to do if YOU Smell GASDo not try to light any appliance Operating Restrictions Pre-Installation Items Section I Pre-Installation Items Boiler ReplacementCode Compliance Determining Product LocationPre-Installation Items Residential Garage InstallationsCombustion Air and Venting Section II Combustion Air VentingMethods of Accessing Combustion Air Into a Space Combustion Air and VentingCombustion Air Requirements Air OpeningsOutdoor Combustion Air Equipment Located in Confined Spaces One Permanent Air InletCombination of Indoor and Outdoor Combustion Air Vent SystemRemoval of an Existing Boiler f rom a Common Vent System Hydrostatic Test Procedures Unit Preparation Section III Unit PreparationHandling Instructions Hydrostatic Pressure TestUnit Preparation Completion of Hydrostatic Test and DrainingDomestic Piping Section IV Domestic Piping Domestic Piping Multiple Units Installation Mixing Valve AssemblyDomestic Piping Diagrams TR/SMART Series ApplicationPerformance Plus With Recirculation Performance Plus with Storage Tank Primary Piping Section V Primary Piping Primary Piping Closet Zero Clearance ApplicationsSystem Piping Zone Circulators Sizing Primary PipingSystem Piping Radiant Heating with Mixing Valve Personal injury, death or substantial property damagePrimary Piping Near Appliance Piping Primary piping Zoning with Circulators Primary Piping Low Temperature Radiant System Primary Piping Venting and Combustion Air Installation Section VI Venting General RequirementsVenting and Combustion Air Installation Category IV Vent Termination ClearancesVenting Option Non Direct Vent / Vertical Multiple Vent TerminationsLocating the Combustion Air Inlet Venting Option Direct Vent / Vertical Venting Option Non-Direct Vent / HorizontalVenting Option Direct Vent / Horizontal Horizontal Wall Thimble KitDetermining Piping Lengths Excessive Horizontal Vent RunsVent Appliance Adapters Allowable Equivalent Length Combined Vent and Combustion Air Standard Horizontal Venting Installation Location of Air Inlet Termination Venting and Combustion Air Installation Section VII Gas Piping Recommended Gas Supply PipingNatural Gas Supply Pressure Requirements Natural GASPipe Sizing Natural Gas Propane Gas Supply Pressure Requirements Propane GASPipe Sizing Propane Gas Internal Wiring Section Viii Internal Wiring Wiring must be N.E.C ClassInternal Wiring Factory Wiring SchematicFactory Internal Wiring External Wiring Section IX External Wiring Installation ComplianceOutdoor Temperature Limit Line Voltage ConnectionsExternal Wiring Multiple Zone Field Wiring Using Zone ValvesField wiring with zone circulators Typical Zone Relay Panel Wiring Section X Start Up Preparation Performance PlusFilling the Outer Primary Tank and System Check Low Water Cut-Off Device Check Thermostat Circuit Verify Correct Pressure SwitchAir Shutter Settings Start-Up Procedures Final Checks Before Start-upPerformance Plus Start-up If Performance Plus Does Not Start CorrectlyFor Your Safety Read Before Lighting Following instructions must be followed exactly, a fire orOr loss of life Operating InstructionsNatural Gas Propane Temperature Limits Section XII Temperature Limits Recommended Secondary Thermostat SettingTemperature Limits Section XIII- Check-Out Procedures Section XIV Installation Record Section XV Maintenance Schedule Service TechnicianOwner Maintenance GeneralInspect the Burner Area Section XVI Maintenance ProceduresCheck the Surrounding Area Check Combustion/ Ventilation Air Openings Inspect Vent System and Combustion Air PipingCheck Domestic System Check Expansion TankCheck Temperature / Pressure Relief Valve Check Ignition Wiring and Ground WiringCheck Control Wiring Check Thermostat Limit SettingsReview With Owner Check Burner Flame Flame SignalCheck Combustion Levels Section Xvii Replacement Parts Jacket Components Control Panel Components Electrical Panel Components Burner Components Specifications Graph 1 Performance Plus Pressure Loss Primary Side TTP Brazed Plate Heat Exchangers Maxi-flo Pool and Spa Heat Exchangers