Delta PG PLUS-25 warranty Filling the Outer Primary Tank and System

Page 54

Start-Up Preparations

NOTICE

System water including additives must be practically non-toxic, having a toxicity rating or Class of 1, as listed in Clinical Toxicology of Commercial Products.

Use of Antifreeze in the Primary System

WARNING

NEVER use automotive or ethylene gly- col antifreeze or undiluted antifreeze in the primary system as freeze protection. This can cause severe personal injury, death or substantial property damage if ignored.

Determine the antifreeze fluid quantity using the system water content volume and following the antifreeze manufacturer instructions.

The primary outer tank volume of the PER- FORMANCE PLUS is 20 gallons. Remember to include the volume of the expansion tank.

Check with local codes requirements for the installation of back flow preventers or actual disconnect from the make up water supply line.

Ensure the concentration of antifreeze to water does not exceed a 50/50 ratio.

NOTICE

System water including additives must be practically non-toxic, having a toxicity rating or Class of 1, as listed in Clinical Toxicology of Commercial Products.

Filling the Inner (Domestic) Tank and System

WARNING

Proceed with filling instructions for the inner and outer tanks only after ensur- ing the water meets the requirements listed in this installation manual. Failure to comply could result in damage and improper operation of the unit.

CAUTION

Never operate the PERFORMANCE PLUS unless both the inner and outer tanks are completely filled.

CAUTION

Always fill the inner tank prior to filling and pressurizing the outer tank. Failure to properly fill the inner tank could result in damage to the inner tank.

1.Ensure the domestic drain valve is closed.

2.Open the isolation valves on the domestic cold supply piping to the PERFOR- MANCE PLUS and on the domestic hot outlet piping to the building.

3.Vent any air from the domestic piping sys- tem by opening faucets near the unit. Continue filling the domestic system until there is a constant flow of water from the faucets.

4.Close the hot water faucets.

Filling the Outer (Primary) Tank and System

1.Close the primary drain valve located on the rear of the unit and any manual or automatic air vent in the system.

2.Open all system isolation valves.

48

Image 54
Contents For Your Safety PG PLUS-25/30/35/40 Gas Fired Combination HeatersTable of Contents Section VI Vent / Combustion AIR Installation Section V Primary PipingSection VII GAS Piping Section Viii Internal WiringSection IX External Wiring Section X START-UP PreparationSection Xiii CHECK-OUT Procedures Section XI START-UP ProceduresSection XII Temperature Limits Section XIV Installation RecordSection Xvii Replacement Parts Product SpecificationsProduct & Safety Information To Protect Against Excessive Temperature and Pressure What to do if YOU Smell GAS Do not try to light any applianceHomeowner Operating Restrictions Code Compliance Pre-Installation Items Section I Pre-Installation ItemsBoiler Replacement Determining Product LocationPre-Installation Items Residential Garage InstallationsCombustion Air and Venting Section II Combustion Air VentingCombustion Air Requirements Methods of Accessing Combustion Air Into a SpaceCombustion Air and Venting Air OpeningsOutdoor Combustion Air Equipment Located in Confined Spaces One Permanent Air InletCombination of Indoor and Outdoor Combustion Air Vent SystemRemoval of an Existing Boiler f rom a Common Vent System Handling Instructions Hydrostatic Test ProceduresUnit Preparation Section III Unit Preparation Hydrostatic Pressure TestUnit Preparation Completion of Hydrostatic Test and DrainingDomestic Piping Section IV Domestic Piping Domestic Piping Multiple Units Installation Mixing Valve AssemblyDomestic Piping Diagrams TR/SMART Series ApplicationPerformance Plus With Recirculation Performance Plus with Storage Tank Primary Piping Section V Primary Piping System Piping Zone Circulators Primary PipingCloset Zero Clearance Applications Sizing Primary PipingSystem Piping Radiant Heating with Mixing Valve Personal injury, death or substantial property damagePrimary Piping Near Appliance Piping Primary piping Zoning with Circulators Primary Piping Low Temperature Radiant System Primary Piping Venting and Combustion Air Installation Section VI Venting General RequirementsVenting and Combustion Air Installation Category IV Vent Termination ClearancesMultiple Vent Terminations Locating the Combustion Air InletVenting Option Non Direct Vent / Vertical Venting Option Direct Vent / Vertical Venting Option Non-Direct Vent / HorizontalVenting Option Direct Vent / Horizontal Horizontal Wall Thimble KitExcessive Horizontal Vent Runs Vent Appliance AdaptersDetermining Piping Lengths Allowable Equivalent Length Combined Vent and Combustion Air Standard Horizontal Venting Installation Location of Air Inlet Termination Venting and Combustion Air Installation Section VII Gas Piping Recommended Gas Supply PipingNatural GAS Pipe Sizing Natural GasNatural Gas Supply Pressure Requirements Propane GAS Pipe Sizing Propane GasPropane Gas Supply Pressure Requirements Internal Wiring Section Viii Internal Wiring Wiring must be N.E.C ClassInternal Wiring Factory Wiring SchematicFactory Internal Wiring Outdoor Temperature Limit External Wiring Section IX External WiringInstallation Compliance Line Voltage ConnectionsExternal Wiring Multiple Zone Field Wiring Using Zone ValvesField wiring with zone circulators Typical Zone Relay Panel Wiring Section X Start Up Preparation Performance PlusFilling the Outer Primary Tank and System Check Low Water Cut-Off Device Verify Correct Pressure Switch Air Shutter SettingsCheck Thermostat Circuit Performance Plus Start-up Start-Up ProceduresFinal Checks Before Start-up If Performance Plus Does Not Start CorrectlyOr loss of life For Your Safety Read Before LightingFollowing instructions must be followed exactly, a fire or Operating InstructionsNatural Gas Propane Temperature Limits Section XII Temperature Limits Recommended Secondary Thermostat SettingTemperature Limits Section XIII- Check-Out Procedures Section XIV Installation Record Owner Maintenance Section XV Maintenance ScheduleService Technician GeneralSection XVI Maintenance Procedures Check the Surrounding AreaInspect the Burner Area Check Domestic System Check Combustion/ Ventilation Air OpeningsInspect Vent System and Combustion Air Piping Check Expansion TankCheck Control Wiring Check Temperature / Pressure Relief ValveCheck Ignition Wiring and Ground Wiring Check Thermostat Limit SettingsCheck Burner Flame Flame Signal Check Combustion LevelsReview With Owner Section Xvii Replacement Parts Jacket Components Control Panel Components Electrical Panel Components Burner Components Specifications Graph 1 Performance Plus Pressure Loss Primary Side TTP Brazed Plate Heat Exchangers Maxi-flo Pool and Spa Heat Exchangers